A Dynamic Labor Utilization Framework: Setting the Under-employment Threshold

2021 ◽  
Author(s):  
Gilbert MONTCHO
Keyword(s):  

1949 ◽  
Vol 31 (1) ◽  
pp. 382
Author(s):  
Lowell S. Hardin


Populasi ◽  
2016 ◽  
Vol 6 (1) ◽  
Author(s):  
Gunawan Wibisono ◽  
Sukamdi Sukamdi

Labor income is a very important issue in the process of industrialization in developing countries. Most strikes and labor conflicts in the last three years were based on workers' desire to increase income. Regarding the fact that most laborers have poor education one common means of increasing income is by lengthening work hours. The results of this study tend to prove this statement. However, this strategy has only increased total income, not real income. Income per hour does not change, and even decreases. It means that extending working hours has only increased self-exploitation. Inaddition, this result has an important implication on the analysis of labor utilization. Laborers who are fully utilized do notal ways have a higher income than those underemployed. Therefore underemployment by working hours does not represent the real labor force problem.



1992 ◽  
Vol 94 (1) ◽  
pp. 71 ◽  
Author(s):  
Horst Entorf ◽  
Heinz König ◽  
Winfried Pohlmeier ◽  
Heinz Konig


1991 ◽  
Vol 20 (4) ◽  
pp. 329-354 ◽  
Author(s):  
Daniel T Lichter ◽  
David J Landry ◽  
Clifford C Clogg


1958 ◽  
Vol 41 (12) ◽  
pp. 1820-1822 ◽  
Author(s):  
M.E. Gregory ◽  
W.M. Roberts ◽  
R.J. Hader


1957 ◽  
Vol 39 (3) ◽  
pp. 759
Author(s):  
C. P. Shastri
Keyword(s):  


1993 ◽  
Vol 24 (1) ◽  
pp. 148-166 ◽  
Author(s):  
Larry W. Jacobs ◽  
Stephen E. Bechtold


2020 ◽  
Vol 1 (1) ◽  
pp. 39
Author(s):  
Prihatini Ratna Dewi ◽  
Dewi Nusraningrum

PT XYZ is the shoes manufacturer in Tangerang that produces Mizuno and Specs brand. Many competitors in the shoes industry enforce the company to improve all aspects; one of them is to improve the problem of low productivity achievement in Mizuno production line. This study aims to know the productivity measurement method by using Objective matrix, and to do analysis of productivity criteria that dominantly contribute to the low productivity in Mizuno production line. This research method was using Objective Matrix (OMAX), Pareto diagram, Fishbone diagram, and 5W1H. Base on the result, it was identified that the highest productivity performance indicator was happened in August 2018 and the lowest productivity performance indicator was happened in March 2018. While for productivity index, the lowest productivity index was happened in March 2018 and the highest productivity index was happened in April 2018. Criteria that dominantly contributed to the decreased productivity in Mizuno production line was on criteria 1 (utilization of material usage), criteria 6 (number of loss output / down time), and criteria 2 (labor utilization), therefore the focus for improvement in this research was to prioritize these criteria to gain increased productivity in Mizuno production line.







Sign in / Sign up

Export Citation Format

Share Document