Optimization and Control Petroleum Refinery Wastewater Treatment Systems — Status, Trends and Needs

1989 ◽  
Vol 24 (3) ◽  
pp. 463-477
Author(s):  
Stephen G. Nutt

Abstract Based on discussions in workshop sessions, several recurring themes became evident with respect to the optimization and control of petroleum refinery wastewater treatment systems to achieve effective removal of toxic contaminants. It was apparent that statistical process control (SPC) techniques are finding more widespread use and have been found to be effective. However, the implementation of real-time process control strategies in petroleum refinery wastewater treatment systems is in its infancy. Considerable effort will need to be expended to demonstrate the practicality of on-line sensors, and the utility of automated process control in petroleum refinery wastewater treatment systems. This paper provides a summary of the discussions held at the workshop.

1989 ◽  
Vol 24 (3) ◽  
pp. 435-450 ◽  
Author(s):  
J.P. Stephenson

Abstract Several online analytical instruments are commercially available to allow continuous monitoring of petroleum industry wastewater treatment plants. Satisfactory usage of these instruments requires -special attention for sample preconditioning and sample characterization prior to selection. Specific examples of the available instruments are provided. Effective maintenance of instruments is emphasized.


Desalination ◽  
2014 ◽  
Vol 341 ◽  
pp. 87-93 ◽  
Author(s):  
Long Yan ◽  
Yufei Wang ◽  
Jian Li ◽  
Hongzhu Ma ◽  
Huijin Liu ◽  
...  

2019 ◽  
Vol 3 (2) ◽  
pp. 45 ◽  
Author(s):  
Shahryar Jafarinejad

Treatment of the petroleum refinery wastewater containing complex chemicals using biological processes is usually challenging because of the inhibition and/or toxicity of these matters when they serve as microbial substrates. In addition, performance modeling and cost evaluation of processes are essential for designing, construction, and forecasting future economic requirements of the petroleum refinery wastewater treatment plants (PRWWTPs). In this study, the performance and economics of conventional activated sludge (CAS) process replacing by sequencing batch reactor (SBR) technology in a two train PRWWTP were evaluated using simulation. The final treated effluent characteristics for the PRWWTPs containing CAS + CAS and SBR + CAS processes under steady state conditions were studied and evolution of the main parameters of the final effluent during the 30 days of simulation for these plants were investigated. Finally, the total project construction, operation labor, maintenance, material, chemical, energy, and amortization costs of these plants were estimated and compared. Results demonstrated that the project construction cost of PRWWTP containing CAS + CAS processes was lower than that of PRWWTP containing SBR + CAS processes and the energy and amortization costs for both plants were higher in comparison with the operation, maintenance, material, and chemical costs. Note that this study is a computer simulation and drawing general conclusions only on the basis of computer simulation may be insufficient.


Sign in / Sign up

Export Citation Format

Share Document