Oxidation ditcb systems for waste water treatment at various demands for effluent quality with regard to BOD, nitrogen and phosphorus are presented. Simple design for only BOD-removal and nitrification as well as designs for advanced treatment including biological nitrogen and biological phosphorus removal are presented, and full scale results from more than 15 years of operation are shown. The simple design and price competitive construction can none the less produce effluent qualities below 15 mg BOD/l, 8 mg N/l and 1.5 mg P/l if the right oxidation ditcb combination is used.

2006 ◽  
Vol 53 (3) ◽  
pp. 53-60 ◽  
Author(s):  
Y. Annaka ◽  
Y. Hamamoto ◽  
M. Akatsu ◽  
K. Maruyama ◽  
S. Oota ◽  
...  

To reduce MBR O&M costs, a new MBR process that conducts efficient simultaneous biological nitrogen and phosphorus removal (BNR) was developed. In the development of this process, various approaches were taken, including reduction of power demand, chemical consumption and sludge disposal costs. To address power demand reductions, air supply requirements for membrane cleaning were reduced. The process adopted an improved membrane that requires less air for cleaning than conventional membranes. It also introduced cyclic aeration, which alternately supplies washing air to the two series of membrane units. Adoption of biological phosphorus removal eliminated chemical costs for phosphorus removal and contributed to the reduction of sludge disposal costs. By combining these technologies, compared to conventional MBR processes, an approximately 27% reduction in O&M costs was achieved.


Author(s):  
Giedre Vaboliene ◽  
Algirdas Bronislovas Matuzevičius

Nitrogen and phosphorus removal is necessary to avoid eutrophication of water bodies when treated wastewater is outlet to slowly flowing water bodies or recycled as technological water. The “BioBalance” technology as the latest way of nitrogen and phosphorus removal was applied at Utena Wastewater Treatment Plant. Composition of wastewater has an impact on biological phosphorus removal, particularly the ratio of biochemical oxygen demand and total phosphorus (BOD7/Total-P) in wastewater after mechanical treatment. Nitrates in the anaerobic zone can have a negative effect on biological phosphorus removal. Consequently, it is necessary to evaluate the impact of the mentioned factors on biological nitrogen and phosphorus removal. Biological nitrogen and phosphorus removal was evaluated and compared by using the “BioBalance” technology for biological nitrogen and phosphorus removal and technology before reconstruction during this investigation. The correlation regressive analysis of the biochemical oxygen demand and total phosphorus (BOD7/Total‐P) after mechanical treatment and the total phosphorus concentration in the effluent was evaluated. The correlation regressive analysis of nitrates in an anaerobic zone on the aeration tank and the efficiency of phosphorus removal was also evaluated.


1985 ◽  
Vol 17 (11-12) ◽  
pp. 199-212 ◽  
Author(s):  
M. Meganck ◽  
D. Malnou ◽  
P. Le Flohic ◽  
G. M. Faup ◽  
J. M. Rovel

Laboratory and semi-industrial scale pilot plant experiments were carried out to study the possibility of simultaneous biological nitrogen and phosphorus removal under European winter temperature conditions. Whereas nitrogen removal requires very long aerated sludge ages, phosphorus removal seems to be somewhat inhibited by the low sludge loadings. Experiments with fatty acid addition to the influent wastewater have shown the acidogenic phase to be the step that was most affected by these low load conditions. The phosphorus release and uptake mechanism in itself may be slowed down by lower temperatures, but still has some activity. A microbiological study of the organisms in the sludge was undertaken in order to discover which organisms were responsible for the different steps in the phosphorus removal mechanism.


2006 ◽  
Vol 41 (1) ◽  
pp. 72-83 ◽  
Author(s):  
Zhe Zhang ◽  
Eric R. Hall

Abstract Parameter estimation and wastewater characterization are crucial for modelling of the membrane enhanced biological phosphorus removal (MEBPR) process. Prior to determining the values of a subset of kinetic and stoichiometric parameters used in ASM No. 2 (ASM2), the carbon, nitrogen and phosphorus fractions of influent wastewater at the University of British Columbia (UBC) pilot plant were characterized. It was found that the UBC wastewater contained fractions of volatile acids (SA), readily fermentable biodegradable COD (SF) and slowly biodegradable COD (XS) that fell within the ASM2 default value ranges. The contents of soluble inert COD (SI) and particulate inert COD (XI) were somewhat higher than ASM2 default values. Mixed liquor samples from pilot-scale MEBPR and conventional enhanced biological phosphorus removal (CEBPR) processes operated under parallel conditions, were then analyzed experimentally to assess the impact of operation in a membrane-assisted mode on the growth yield (YH), decay coefficient (bH) and maximum specific growth rate of heterotrophic biomass (µH). The resulting values for YH, bH and µH were slightly lower for the MEBPR train than for the CEBPR train, but the differences were not statistically significant. It is suggested that MEBPR simulation using ASM2 could be accomplished satisfactorily using parameter values determined for a conventional biological phosphorus removal process, if MEBPR parameter values are not available.


1996 ◽  
Vol 33 (12) ◽  
pp. 251-254
Author(s):  
Karl Arno Bäumer ◽  
Angela Baumann

The Institute for Water and Waste Management (ISA) at the Aachen University of Technology (RWTH) verified, through semi-technical analysis, the efficiency of the planned upgrade of the Kleve-Salmorth waste water treatment plant. Additionally the allowable biological phosphorus removal limit and the scheduled simultaneous precipitation were also ascertained.


1983 ◽  
Vol 15 (3-4) ◽  
pp. 1-13 ◽  
Author(s):  
James L Barnard

This paper briefly summarizes the early work on phosphorus removal in activated sludge plants in the U.S.A. and observed that such removals only occurred in low SRT plants of the plug flow type and in the Phostrip plants, neither designed for full nitrification. The discovery of simultaneous nitrogen and phosphorus removal, as well as full-scale experiments are discussed. The Phoredox process was proposed utilizing internal recycling for the removal of nitrates and an anaerobic first stage in which the incoming feed is used to obtain the necessary anaerobic conditions, essential as a conditioning step for the uptake of phosphorus. Proposed mechanisms are discussed.


2006 ◽  
Vol 53 (9) ◽  
pp. 169-175 ◽  
Author(s):  
K. Hamada ◽  
T. Kuba ◽  
V. Torrico ◽  
M. Okazaki ◽  
T. Kusuda

A shortage of organic substances (COD) may cause problems for biological nutrient removal, that is, lower influent COD concentration leads to lower nutrient removal rates. Biological phosphorus removal and denitrification are reactions in which COD is indispensable. As for biological simultaneous nitrogen and phosphorus removal systems, a competition problem of COD utilisation between polyphosphate accumulating organisms (PAOs) and non-polyphosphate-accumulating denitrifiers is not avoided. From the viewpoint of effective utilisation of limited influent COD, denitrifying phosphorus-removing organisms (DN-PAOs) can be effective. In this study, DN-PAOs activities in modified UCT (pre-denitrification process) and DEPHANOX (post-denitrification ptocess) wastewater treatments were compared. In conclusion, the post-denitrification systems can use influent COD more effectively and have higher nutrient removal efficiencies than the conventional pre-denitrification systems.


2002 ◽  
Vol 45 (6) ◽  
pp. 137-144 ◽  
Author(s):  
M. Henze ◽  
H. Aspregren ◽  
J. la Cour Jansen ◽  
P.H. Nielsen ◽  
N. Lee

The paper deals with the effect of wastewater, plant design and operation in relation to biological nitrogen and phosphorus removal and the possibilities to model the processes. Two Bio-P pilot plants were operated for 2.5 years in parallel receiving identical wastewater. The plants had SRT of 4 and 21 days, the latter had nitrification and denitrification. The plant with 4 days SRT had much more variable biomass characteristics, than the one with the high SRT. The internal storage compounds, PHA, were affected significantly by the concentration of fatty acids or other easily degradable organics in the wastewater, and less by the plant lay-out. The phosphorus removal is mainly dependent on availability in the wastewater of fatty acids but also by the suspended solids in the effluent, which is higher in the plant with nitrification-denitrification, probably due to a higher SVI or denitrification in the settler. The addition of glucose to the influent seems to have an effect on the performance of the plants similar to that of acetic acid. In spite of great load variations over time to the pilot plants and the different operational modes, the study of population dynamics showed less significant variations with time which has importance in relation to modelling. The overall conclusion of the comparison between the two plants is that the biological phosphorus removal efficiency under practical operating conditions is affected by the SRT in the plant and the wastewater composition. Thus great care should be taken when extrapolating results from one type of plant to another. Indirectly the experiments confirm that results from lab-experiments with artificial wastewater are difficult to extrapolate through modelling to real life wastewater and conditions. The 2.5 years time series can be valuable in verification of models for Nitrogen and Enhanced Biological Phosphorus Removal.