scholarly journals How to make a large nutrient removal plant energy self-sufficient. Latest upgrade of the Vienna Main Wastewater Treatment Plant (VMWWTP)

2018 ◽  
Vol 77 (10) ◽  
pp. 2369-2376 ◽  
Author(s):  
Helmut Kroiss ◽  
Franz Klager

Abstract The goal of making nutrient removal wastewater treatment energy self-sufficient or even energy producing has become a worldwide accepted goal of technology development. The latest upgrade of the Vienna Main Wastewater Treatment Plant (VMWWTP) with a design capacity of 4 million (M) population equivalent (PE) will produce about 20% more energy on a yearly basis than needed for operation due to a special process scheme. It consists of primary sedimentation, a special 2-stage activated sludge (AS) process configuration where excess sludge is only withdrawn from the first stage AS plant. Raw sludge is subject to mechanical thickening to ∼8% digested sludge (DS) for digestion at high solids concentration. The reject water after nitritation is used for denitritation in the first stage AS plant. This results in markedly reducing the energy requirement for aeration. The design of this last upgrade for energy optimization of sludge treatment is based on the long-term full-scale data from the existing plant, results of mid-term pilot investigations, sound theoretical mass balance calculations and an adapted dynamic model development. All this is presented in this paper. The full-scale upgrade is under construction and will start operating in 2020.

2018 ◽  
Vol 13 (3) ◽  
pp. 566-582 ◽  
Author(s):  
Nadja Hvala ◽  
Darko Vrečko ◽  
Cirila Bordon

Abstract This paper presents the design of a plant-wide CNP (carbon-nitrogen-phosphorus) simulation model of a full-scale wastewater treatment plant, which will be upgraded for tertiary treatment to achieve compliance with effluent total nitrogen (TN) and total phosphorus (TP) limit values. The plant-wide model of the existing plant was first designed and extensively validated under long-term dynamic operation. The most crucial step was a precise characterization of input wastewater that was performed by extending the plant performance indicators both to a water line and sludge line and systematically estimating identifiable wastewater characterization parameters from plant-wide performance indicators, i.e. effluent concentrations, biogas and sludge production, and sludge composition. The thus constructed simulation model with standard activated sludge model (ASM2d) and anaerobic digestion model (MantisAD) overpredicted ortho-P and ammonia-N on the sludge line, indicating a need to integrate state-of-the-art physico-chemical minerals precipitation models to simulate plant-wide interactions more precisely. The upgraded plant with multimode anaerobic/anoxic/oxic configuration shows limited denitrification potential. Therefore, additional reject water treatment was evaluated to improve effluent TN and TP performance.


2015 ◽  
Vol 72 (3) ◽  
pp. 391-405 ◽  
Author(s):  
Nashia Deepnarain ◽  
Sheena Kumari ◽  
Jordache Ramjith ◽  
Feroz Mahomed Swalaha ◽  
Valter Tandoi ◽  
...  

Biological nutrient removal (BNR) systems across the globe frequently experience bulking and foaming episodes, which present operational challenges such as poor sludge settling due to excessive filamentous bacteria. A full-scale BNR plant treating primarily domestic wastewater was monitored over a period of 1 year to investigate filamentous bacterial growth response under various plant operating parameters. Identification of filamentous bacteria by conventional microscopy and fluorescent in situ hybridisation indicated the dominance of Eikelboom Type021N, Thiothrix spp., Eikelboom Type 1851 and Eikelboom Type 0092. A cumulative logit model (CLM) was applied to elucidate significant relationships between the filamentous bacteria and plant operational parameters. The model could predict the potential abundance of dominant filamentous bacteria in relation to wastewater treatment plant operational parameters. Data obtained from the model corroborated with previous findings on the dominance of most filaments identified, except for Type 0092, which exhibited some unique traits. With further validation, the model could be successfully applied for identifying specific parameters which could contribute towards filamentous bulking, thus, providing a useful tool for regulating specific filamentous growth in full-scale wastewater treatment plants.


2008 ◽  
Vol 57 (9) ◽  
pp. 1345-1348 ◽  
Author(s):  
M. Urgun-Demirtas ◽  
K. R. Pagilla ◽  
T. E. Kunetz ◽  
J. P. Sobanski ◽  
K. P. Law

A protocol to select nutrient removal technologies that can achieve low nutrient effluents (total nitrogen (TN) < 5 mg/L and total phosphorus (TP) < 0.5 mg/L) was developed for different wastewater treatment plant (WWTP) sizes based on the research conducted during a Water Environment Research Foundation funded project. The adaptable protocol includes technology and cost assessment of feasible (pre-screened) nutrient removal technologies that are being successfully implemented at full scale. The information collected from the full scale nutrient removal plants to develop this protocol includes design, operational, performance, and cost data through a direct survey of plants, and published data. The protocol includes a “technology threshold” approach consisting of Tier I (TN < 5.0 mg/L; TP < 0.5 mg/L) and Tier II (TN < 3.0 mg/L; TP < 0.1 mg/L) effluent nutrient levels for different plant sizes. A very large WWTP (1,250,000 m3/day flow) in Chicago, Illinois, USA adapted this protocol for master planning and design of future nutrient removal facilities based on plant and site specific criteria.


Sign in / Sign up

Export Citation Format

Share Document