Hacking Project Delivery at Silicon Valley Clean Water using Progressive Design-Build

2018 ◽  
Vol 2018 (9) ◽  
pp. 4452-4465
Author(s):  
William Bryan ◽  
Aren Hansen
2014 ◽  
Vol 2014 ◽  
pp. 1-8 ◽  
Author(s):  
Xiang Ding ◽  
Zhaohan Sheng ◽  
Jianguo Du ◽  
Qian Li

Project delivery planning is a key stage used by the project owner (or project investor) for organizing design, construction, and other operations in a construction project. The main task in this stage is to select an appropriate project delivery method. In order to analyze different factors affecting the PDM selection, this paper establishes a multiagent model mainly to show how project complexity, governance strength, and market environment affect the project owner’s decision on PDM. Experiment results show that project owner usually choose Design-Build method when the project is very complex within a certain range. Besides, this paper points out that Design-Build method will be the prior choice when the potential contractors develop quickly. This paper provides the owners with methods and suggestions in terms of showing how the factors affect PDM selection, and it may improve the project performance.


Author(s):  
Benjamin R. Jowett ◽  
Malak Al Hattab ◽  
Mohamad Kassem

Building information modelling (BIM) tools and workflows, new procurements methods, and emerging management practices are being adopted on projects to overcome collaboration barriers and improve project performance within the architecture, engineering, construction, and operation (AECO) sector. Academic literature and industry reports recommend the use of collaborative procurement methods such as design and build (DB) procurement and integrated project delivery (IPD) when adopting BIM workflows. However, to date there are little operationalization and empirical evidence of the value realization potential when using BIM in conjunction to these procurement methods. This chapter draws upon five case studies of BIM-based DB projects to analyze and quantify the potential of value realization using clash detection as a use value. The results reveal potential hurdles inhibiting BIM from reaching its full potential. Accordingly, recommended changes to the current processes are suggested to facilitate BIM in enhancing value on DB projects.


2012 ◽  
Vol 2012 (8) ◽  
pp. 6594-6600
Author(s):  
Scott A. Hardy ◽  
Michael Reisinger ◽  
Richard Schoeck ◽  
Adam Minchey ◽  
Richard Porter ◽  
...  

2010 ◽  
Vol 37 (12) ◽  
pp. 1525-1534 ◽  
Author(s):  
Andrew S. Chang ◽  
Fang-Ying Shen ◽  
William Ibbs

Design–build (DB) is adopted as a project delivery method in hopes to improve performance. Previous studies focus on upstream issues such as conditions for adoption and contractor selection, but few address the design and construction coordination issues that are very likely to be encountered in execution by new users. This paper investigates coordination problems arising from design and construction concurrence and solutions by studying five ongoing DB projects and interviewing nine major contract parties. Inconsistent application of the design and construction process and infrequent feedback are two major problems found to have high influence on DB execution. A work unit planning process with five steps is presented in this paper to help better manage the design and construction coordination of a DB project.


2016 ◽  
Vol 13 (2) ◽  
pp. 81 ◽  
Author(s):  
Sabihah Saaidin ◽  
Intan Rohani Endut ◽  
Abu Samah Abu Samah ◽  
Ahmad Ruslan Mohd Ridzuan

This paper discusses the design-build project delivery method which is becoming an increasingly viable alternative to traditional project delivery method in the public sector. This interest has led to dialogue among public sector agencies to establish and formalise understanding of the design-build process and its implementation. The process consists of six stages namely Project Definition, Request for Qualification, Request for Proposal, Proposal Submission and Evaluation, Contract Award, and Document/Construction. Therefore, this finding of Design-Build (DB) procurement process is on the improvement and understanding on an owner and contractor in practice and implementation in Malaysia.  Keywords: design/build, design/bid/build, advantage and disadvantage, procurement process


Author(s):  
Brian Lines ◽  
Anthony Perrenoud ◽  
Kenneth Sullivan

Performance in the construction industry is wrought with challenges and owners often are victim to cost and schedule overruns, particularly on high profile projects that are large, complex, and risky. Alternative project delivery methods and techniques are continually being developed and implemented by buyers of construction services to address these problems. The Best Value Business Model (BVBM) has been rigorously tested and shown to improve project performance via its three-phased approach to project delivery. BVBM increases performance throughout the construction project lifecycle by utilizing value-based selection processes, pre-contract planning methodologies, and performance measurement systems. The objective of this research is to provide a detailed case study of BVBM application on a design-build project to deliver a highly complex research facility with tight schedule and budget thresholds. The implementation process is discussed in detail and project results are provided and analyzed to demonstrate the ability of BVBM to improve project performance. Special attention is paid to the ability of BVBM to optimize project cost and schedule performance through the application of a value-based selection methodology, a pre-contract preplanning period, and a weekly risk management system.