scholarly journals Perencanaan Keseimbangan Lintasan Untuk Meningkatkan Efisiensi Kerja Dengan Menggunakan Metode RPW

2010 ◽  
Vol 3 (1) ◽  
pp. 66
Author(s):  
Teguh Baroto, Wahyu Eni Maryati

This rescarch aims to orange a balance production line 10 improve work efficiency to rice production output. This line balancing planning, we use Rank Position Weight ( RPW ). Using operation time data in every work station and also precedence diagram based on the shoes making process could be found elements/operation group involving a work station. With 3 cycles time such as 100,150 ang 160 seconds could be found a cycle time 150 seconds result minimum operation grouping of balance delay. From this planning could be concluded that there were 10 work stations with production output 168 part of shoes of day.

2016 ◽  
Vol 15 (2) ◽  
pp. 182
Author(s):  
SAIFUL .. ◽  
MULYADI HAMBALI ◽  
TRI MUHADI RAHMAN

PT XYZ merupakan salah satu perusahaan yang bergerak di bidang industri mebel. Masalah yang dihadapi perusahaan adalah adanya ketidakseimbangan di lintasan produksi akibat ketidakmerataan pembagian beban kerja di setiap stasiun kerja. Hal ini menyebabkan performansi keseimbangan lintasan (line performance) menjadi kurang baik. Untuk menyelesaikan permasalahan ini perlu dilakukan penyeimbangan lintasan produksi. Hal ini dapat dilakukan dengan metode line balancing yaitu metode penugasan sejumlah pekerjaan yang saling berkaitan dalam satu lintasan produksi sehingga setiap stasiun kerja memiliki waktu yang tidak melebihi waktu siklus dari stasiun kerja tersebut. Metode line balancing yang digunakan adalah metode heuristik yang terdiri dari: metode bobot posisi (Ranked Positional Weight), metode pembebanan berurut (Large Candidate Rule), dan metode pendekatan wilayah (Region Approach). Dari ketiga metode Heuristik yang digunakan sebagai solusi penyeimbangan lintasan, terjadi perbaikan performansi dengan nilai yang sama pada lintasan produksi. Nilai efisiensi lintasan (line efficiency) meningkat menjadi 94,07 % dari 62,71 % pada kondisi awal. Nilai keseimbangan waktu senggang (balance delay) turun menjadi 5,92 % dari 37,28 % pada kondisi awal. Waktu menganggur (idle time) turun menjadi 12,39 menit dari 116,87 menit pada kondisi awal. Nilai smoothness index juga turun menjadi 7,44 dari 64,67 pada kondisi awal. PT XYZ is one of the company which refers to furniture industries sector. The problem which faced by this company is unbalance of the production line which is caused by the unequal of work responsibility distribution in each work station. This problem caused the performance of line balance doesn’t work properly. To solve this problem we need to do the line balancing of production line. It can be done by line balancing methode that assigns a number of work which is related in one production line until each work station has efficient time which is not more than the cycle time of the work station. Line balancing methode that used is heuristic methode which is devided into ranked positional weight methode, large candidate rule methode, and region approach methode. From those three heuristic methode that used as solution of line balancing, there was improvement happenned with the same value in doors of production line. Line efficiency increased into 94,07% from 62,71% at the beginning condition. Balance delay increased into 5,92% from 37,28% at the beginning condition. The idle time descreased into 12,39 minutes from 116,87 minutes at the beginning condition. The smoothness index descreased into 7,44 from 64,67 at the beginning condition.


2012 ◽  
Vol 576 ◽  
pp. 700-704 ◽  
Author(s):  
Hartini Mustafa ◽  
Ahmad Razlan Yusoff ◽  
M. Yusoff Ismail

Assembly line balancing is assumed to have fixed task within specified task time during the initial stage of the mass production. The problem of current case study of this assembly line was the production line cannot meet the expected output plan with imbalance station cycle time. In this paper, productivity study and line balancing is applied to improve production line of GGMG & CALICO. The desired cycle time defined using the Standard Time Data (STD) which required the person to perform assign task till completion by defining the performance rating of person. The proposed solution proved by the implementation analysis conducted in the research. The results showed that the productivity of production line which is tremendously increased within 50% after implementation. There are six factors identified during the study which are bottleneck stations, workpiece flow, line layout, ergonomic, resource assignment and buffer allocation.


Author(s):  
Ankush . ◽  
Amit Kumar

Project has been completed in the practical environment of an auto ancillary company. There is always a room for improvement in any process; the approach for study and further improvement of process is used for the fulfilment of this project. Main purpose of this project is to scrutinize every aspect of a frame line. Main focus is to study its cycle time and various wastes which can be removed from the process in order to optimize the process. Line balancing concept is used for balancing the line to get single piece flow.


2021 ◽  
Vol 328 ◽  
pp. 05012
Author(s):  
Rachmad Hidayat ◽  
Shofi fitrotis Salimah ◽  
Moh. Jufriyanto ◽  
M.Firman Khaqiqi

The existence of operational balance in each production lines may decrease the idle time; it shows that the productivity is increasing therefore it increases the production rate. The issues existed in the production process of hollow Dakota 1730 in PT. XYZ were 3 departments, from the result of the first observation, there was a bottleneck from each department and each production did not achieve the required target. Therefore, this research would fix the production line. The method used was ranked /positional weight. Based on the data processing by the ranked positional weight method, gained the total of work station in the production process of hollow Dakota 1730 by the number of 2 work stations. From the result of efficiency balancing, gained 62.5% and balance delay value was 37.5%. it shows that the balance performance between each department increases significantly.


2020 ◽  
Vol 8 (4) ◽  
pp. 595
Author(s):  
Ni Luh Ayu Uparina Yanti Putri ◽  
I Ketut Satriawan ◽  
Cokorda Anom Bayu Sadyasmara

PT Indoroti Prima Cemerlang is one of the Food  industries which produces bread with a brand Mr. Bread. the company had problems with the balance of the production line, so that it cannot meet consumer demand, this causing the company to not able meet the production targets. The purpose of this study is to calculate the increase in line balancing and decrease in idle time and determine the optimum number of work stations in the production process of product sweetbread combination at PT. Indoroti Prima Cemerlang. The method used in this study was the Ranked Position Weight (RPW) method with the results obtained that the number of work stations is reduced to 5 work stations, the line efficiency increases to 40% and balance delay decreased to 60% with idle time reduced to 29.019 seconds. Keywords : Line balancing, work station, idle time, balance delay, Ranked Position Weight


2012 ◽  
Vol 542-543 ◽  
pp. 320-323 ◽  
Author(s):  
Ling Zhao

The paper is focus on the assembly line of the factory .The nodular method and second-watch measuring methods are applied to measure the work time of the bottleneck stations. To improve the cycle time of the assembly line, the work contents of relative stations is reallocated. Finally, the production line is disposed again on the basis of the principle of ECRS and the line balancing theory .After implemented the new method, the capability of this production line has improved.


2014 ◽  
Vol 20 (5) ◽  
pp. 678-692 ◽  
Author(s):  
Pornthipa Ongkunaruk ◽  
Wimonrat Wongsatit

Purpose – The purpose of this paper is to improve the productivity of a large-sized frozen chicken manufacturer in Thailand. It analyses the production process based on work study principles and identifies the bottleneck operation. It develops three models for the chicken preparation process. Design/methodology/approach – First, analyse the current production system by collecting the cycle time of all operations in the production process based on work study principles. Then, design the production network and identify the bottleneck operation. After that, three methods – based on line balancing (LB), theory of constraints, and JIT concepts or ECRS (eliminate, combine, rearrange and simplify) – are proposed and implemented in the actual production line. Findings – With the ECRS concept, the authors implement combine by combining two stations into one station, such as handling and weighing, or weighing batter and mixing it with chicken. Then, Simplify is implemented at job E, or transporting chicken using a cart instead of walking. This method can improve the cycle time and reduce the number of employees. It can increase the line efficiency by up to 94.20 per cent, reduce the number of employees by 14 persons, and reduce the labour cost by 356,160 baht/year. Originality/value – Most agro-industry manufacturing processes are labour intensive. Thus, production LB can help increase productivity and reduce costs. The authors found that the case study company designed the production line without aligning it with the production network. A simple improvement can be made by adjusting the sequence of the work. In addition, the current production line was not lean. Implementation of the ECRS concept to improve production can reduce the waiting time and simplify the job.


2014 ◽  
Vol 886 ◽  
pp. 564-567
Author(s):  
Jun Song Liu

For the assembly line balancing problem, the purpose of adopting genetic algorithm is to balance the average operation time of each work-station. In this paper, we elaborate the main factors that affect the genetic algorithm. Then evaluation functions are brought in the study to evaluate the simulation model based on eM-Plant. Finally the feasibility of this applied technology is verified by the example.


2021 ◽  
Vol 2 (3) ◽  
Author(s):  
Jakfat Haekal

From Gaikindo’s data, the impact of the covid-19 effect caused the automotive industry to experience a 50% contraction; PT Denso Indonesia, which is an automotive component company, felt the impact where actual production fell by 30% in the first quartile of 2020, the company’s adaptation was efficiency and productivity and activity cost down. The problem with the starter line is that there is a difference in the cycle time of each post in the sub-assy starter brush line, too gaping. From this problem, the researchers analyzed with the TPS and Line Balancing methods with the help of pro model simulations, from these activities evaluated the performance line from the previous line efficiency of 89.05% Balance Delay: 10.95% and Smoothie Index 12.58 improved to line efficiency of 93.59% Balance Delay: 6.35% and Smoothie Index 6.10. However, there are still bottlenecks, following which improvements will be made using line balancing with pro model simulations; pro model simulations were chosen because to make repairs, it is enough to use the help of applications that are in line with the goals of the company, which is currently survival amid this intense competition. After the repair was done using the Helgerson Bernie approach, a simulation of the line balancing method improvement was carried out. The line efficiency value was 95.76% Balance Delay: 4.24% and Smoothie Index 4.45 with a total outflow of 131 units of goods every 1 hour.


2017 ◽  
Vol 6 (1) ◽  
pp. 57
Author(s):  
Hery Hamdi Azwir ◽  
Harry Wahyu Pratomo

<p><em>Line balancing is a jobs assignment into a number of work stations that are interrelated in a track or a production line with an objective to minimizing the idle time on the line that is determined by the slowest operation. In line welding 1DY models includes eight work stations where one work station is done by one operator. Problems have been found that these operators have very long idle time and also there is too much wip that creates bottleneck in the production line so these leads to a waste of manpower and time. This waste of manpower and time need to be reduced by determining the optimal amount of labor in order to avoid excessive idle time but work can be done effectively and efficiently. One way to adress imbalance line is to apply line balancing methods.The results of this research shows that the line balancing methods can reduced the waste of time and give solutions for the optimal amount of labor requirements for line welding 1DY models.</em></p><p>Keywords: Line Balancing, Workstation, Production Line, Idle Time, Bottleneck.</p><p><em><br /></em></p>