scholarly journals Environmental risk assessment of low density polyethylene unit using the method of failure mode and effect analysis

2012 ◽  
Vol 18 (1) ◽  
pp. 103-113 ◽  
Author(s):  
Parinaz Salati ◽  
Seyed Jozi

The ninth olefin plan of Arya Sasol Petrochemical Company (A.S.P.C.) is regarded the largest gas Olefin Unit located on Pars Special Economic Energy Zone (P.S.E.E.Z). Considering the importance of the petrochemical unit, its environmental assessment seems necessary to identify and reduce potential hazards. For this purpose, after determining the scope of the study area, identification and measurement of the environmental parameters, environmental risk assessment of the unit was carried out using Environment Failure Mode and Effect Analysis (EFMEA). Using the noted method, sources causing environmental risks were identified, rated and prioritized. Beside, the impacts of the environmental aspects derived from the unit activities as well as their consequences were also analyzed. Furthermore, the identified impacts were prioritized based on Risk Priority Number (RPN) and severity level of the consequences imposed on the affected environment. After performing statistical calculations, it was found that the environmental aspects owing the risk priority number higher than 15 have a high level of risk. Results obtained from Low Density Polyethylene Unit revealed that the highest risk belongs to the emergency vent system with risk priority number equal to 48. It is occurred due to imperfect performance of the reactor safety system leading to the emissions of ethylene gas, particles, and radioactive steam as well as air and noise pollutions. Results derived from secondary assessment of the environmental aspects, through difference in calculated RPN and activities risk levels showed that employing modern methods and risk assessment are have remarkably reduced the severity of risk and consequently detracted the damages and losses incurred on the environment.

2020 ◽  
Vol 319 ◽  
pp. 01004
Author(s):  
Voraya Wattanajitsiri ◽  
Rapee Kanchana ◽  
Surat Triwanapong ◽  
Kittipong Kimapong

The objective of this research was to study a risk assessment of the rice combine harvester using FMEA technique implementation and suggested the procedures to maintain the parts of the rice combine harvester by analyzing the causes of risk assessment of FMEA. The FMEA was also applied to specify failure causes and effects that occurred in the rice harvester. The obtained data were calculated for a risk priority number (RPN) and then sorted to be a descending order. The high RPN part was analyzed for the causes and effects and then suggested a preventive maintenance in near future. The results revealed that the highest RPN of 576 was found when a chain surface was considered and also showed the maximum risk among the considered parts in the rice combine harvester. While, the lowest RPN of 144 was found when a rice sieve part was considered but this RPN was still higher than that of 100 RPN which was required to specify the preventive maintenance.


2021 ◽  
Vol 34 (04) ◽  
pp. 1215-1230
Author(s):  
Farzaneh Movahednejad

Dam projects have serious influences on environmental parameters; therefore, environment risk assessment of dam is one of the most significant aspects of environmental risk management in these projects. The present study was conducted with the aim of presenting a new model for assessing the environmental risk of dams in construction stage. After identifying environmental risks and using the EFMEA method, the risk priority number for each of the environmental aspects was calculated and classified. Then, to assess and prioritize the identified environmental risks, the VIKOR method was used. The results showed that in The EFMEA method and by comparing calculated risk numbers, the risk of water pollution of Balarood River with the risk priority number of 125 is in the first priority. In the VIKOR method, the risks of water pollution in terms of agreement (high, average, low) with weights (1,300, 1,000 and 0,700) were identified as the most important risks. In the present article, using EFMEA and VIKOR methods in the environmental risk assessment of the dam, the most important risks were determined. The most important proposed corrective measure to reduce the environmental risks is the construction and completion of wastewater treatment for industrial units.


2020 ◽  
Vol 1 (1) ◽  
pp. 162-173
Author(s):  
Dinesh Kumar Kushwaha ◽  
◽  
Dilbagh Panchal ◽  
Anish Sachdeva ◽  
◽  
...  

Failure Mode Effect Analysis (FMEA) is popular and versatile approach applicable to risk assessment and safety improvement of a repairable engineering system. This method encompasses various fields such as manufacturing, healthcare, paper mill, thermal power industry, software industry, services, security etc. in terms of its application. In general, FMEA is based on Risk Priority Number (RPN) score which is found by product of probability of Occurrence (O), Severity of failure (S) and Failure Detection (D). As human judgement is approximate in nature, the accuracy of data obtained from FMEA members depend on degree of subjectivity. The subjective knowledge of members not only contains uncertainty but hesitation too which in turn, affect the results. Fuzzy FMEA considers uncertainty and vagueness of the data/ information obtained from experts. In order to take into account, the hesitation of experts and vague concept, in the present work we propose integrated framework based on Intuitionistic Fuzzy- Failure Mode Effect Analysis (IF-FMEA) and IF-Technique for Order Preference by Similarity to Ideal Solution (IF-TOPSIS) techniques to rank the listed failure causes. Failure cause Fibrizer (FR) was found to be the most critical failure cause with RPN score 0.500. IF-TOPSIS has been implemented within IF-FMEA to compare and verify ranking results obtained by both the IF based approaches. The proposed method was presented with its application for examining the risk assessment of cutting system in sugar mill industry situated in western Uttar Pradesh province of India. The result would be useful for the plant maintenance manager to fix the best maintenance schedule for improving availability of cutting system.


Apidologie ◽  
2003 ◽  
Vol 34 (2) ◽  
pp. 139-145 ◽  
Author(s):  
Henrik F. Brodsgaard ◽  
Camilla J. Brodsgaard ◽  
Henrik Hansen ◽  
G�bor L. L�vei