scholarly journals The impact of a hydroelectric power station on the development and modernization of the Bajina Basta settlement during the socialist period

Spatium ◽  
2018 ◽  
pp. 47-54
Author(s):  
Ivana Vucetic

During the process of socialist modernization, initiated after WWII, large development projects in Serbia were the main drivers of urban transformation. Electrification and industrialization resulted in the establishment of new production modes, which defined a new socio-economic background for the development of settlements and the modification of their functional and morphological structure. The construction of the Bajina Basta hydroelectric power station, in the middle section of the Drina River in western Serbia, was one of the development projects, and it triggered the transformation of the environment, upgrading the pre-war small town of Bajina Basta into a new urban node, adjusted to the socialist imperatives and standards of progress.

Purpose. Analysis of environmental problems and risks associated with the construction and operation of small hydroelectric power facilities (SHEPP) in the Ukrainian Carpathians. Methods. Field studies, statistical, hydrological, hydroecological, analysis and synthesis. Results. Potential environmental risks arising from the construction and operation of SHEPP in the Ukrainian Carpathians are considered. The influence of Yavіrska hydroelectric power station on water discharges in the Stryi river was investigated. The daily water discharges for the two hydraulic sections located above and below the station for low-water (2003) and high-water (2008) years are analyzed. Possible risks in the construction and operation of the hydroelectric power plant for the movement of flood waters, river sediments, the development of riverbed deformations, and others, are indicated. The difference in water discharges between the two hydrological stations is presented, and it is confirmed that in the spring of 2008 and 2003 and the autumn and winter of 2003 and 2008 minimal differences in water consumption were observed as a result of the water retention in the reservoir above the dam of Yavіrska hydro power station for the maximal electrical power generation. The impact of the Yavіrska SHEPP on the biota of the Stryi river during 2014–2015 was analyzed. The obtained results indicate that the main negative factors affecting the communities of river hydrobionts are the creation of reservoir of limnethic conditions in the continuum of the river ecosystem; the accumulation of sediments and dead organic matter on its bottom and banks and the demolition of these sediments on the lower sections of the channel bed; also a decrease of water in the riverbed downstream of the dam after the closure of the floodgates in June. The analysis of the environmental impact assessment reports made it possible to analyze the major environmental threats, which are possible during the building and operation of a small hydroelectric power plant on the Stryi river in the Dovhe village (Drohobych district, Lviv region). Conclusions. To prevent the impact of the projected SHEPP in the Carpathian region it is necessary to prescribe the mechanism of carrying out the environmental impact assessment, to specify the natural-geographical, hydrological and hydro-ecological restrictions on the construction and operation of the hydroelectric power station. It is also necessary to identify sections of mountain (“wild”) rivers with high values of natural landscapes and prohibit the construction of small hydropower facilities.


2021 ◽  
pp. 58-63
Author(s):  
Sergey Ivanovich Derevyagin ◽  
Igor Valeryevich Zagozin

The review of the operation, design, and operation features of the mini-hydro power plant that can provide electricity to a private household or a separate private house. A project has been developed to supply the private sector with electricity from a mobile hydroelectric power station. To accommodate the hydropower plant, it was decided to install the DN500 pipeline. The selected water flow rate and the difference in the location of the channel and the location of the turbine installation allow you to provide the required power.The novelty of the work consists of electrifying a private economy using a mobile hydroelectric power station and establishing the advantages and disadvantages of this solution with an assessment of the impact of all design parameters on the output parameters.The research results can be applied for the manufacture of the mobile hydroelectric power station to their usage in the peasant farms, to save electricity, as well as in the development of experimental-industrial samples of electrical installations for various purposes.


1974 ◽  
Vol 8 (10) ◽  
pp. 914-916
Author(s):  
I. S. Ronzhin ◽  
A. D. Osipov ◽  
V. Kh. Gol'tsman ◽  
A. B. Yumatov

2008 ◽  
pp. 101-107
Author(s):  
Dubravka Polic ◽  
Ruzica Igic ◽  
Slobodanka Stojanovic ◽  
Dejana Lazic

Labudovo okno locality (50 m-84 m elevation) is situated in the south-eastern part of the edge of the Pannonian Plains, resting along the left bank of the Danube between 1982 km and 1078 km. The investigated locality is the result of rise of the Danube level after dam building of the hydroelectric power station Djerdap I. The vegetation comprises aquatic associations of the classes Hydrochari-Lemnetea Oberd. 1967 and Potametea Tx. et Prsg. 1942. The class Hydrochari-Lemnetea Oberd. 1967 includes the following phytocoenoses: Lemno-Spirodeletum W. Koch 1954, Salvinio-Spirodeletum polyrrhizae Slavnic 1956, Lemno minoris-Azolletum filiculoides Br.-Bl. 1952, Ceratophylletum demersi (So? 27) Hild 1956. The class Potametea Tx. et Prsg. 1942 includes the associations Myriophyllo-Potametum So? 1934, Nympaeetum albo-luteae Nowinski 1928, Trapetum natantis M?lleret G?rs 1960.


2020 ◽  
Vol 223 ◽  
pp. 03002
Author(s):  
Gachenko Andrey ◽  
Hmelnov Alexey

In this work, the authors present a technology for riverside terrain model building that has been tested on a number of scientific projects to study the littoral area of tail race of the Irkutsk Hydroelectric Power Station and the Bratsk Reservoir. This model is used for forecasting changes in the reservoir shorelines associated with wastewater in the cascade of hydroelectric power stations. The technology described in the work was approved to solve a number of practical problems and showed its effectiveness. Specialized application software was developed and terrain data from various sources were used to specify and detail the end result.


2020 ◽  
Vol 11 (7-2020) ◽  
pp. 19-32
Author(s):  
Olga E. Konovalova ◽  
◽  
Nikolai M. Kuznetsov ◽  

The article tells the story of the creation of the Nizhne-Tulomskaya hydroelectric power station (HPP). The main energy parameters of the hydroelectric power station, the layoutof the main structures of the station, and archival photos of the construction time are given. Data on the production and consumption of electricity for own needs, the cost of 1 kW·h during the great Patriotic war are shown. It is told about the reconstruction and current state of the station.