scholarly journals Alignment of Knowledge Management and Performance Management System (Case Study: PT.X)

Author(s):  
Atikah Aghdhi Pratiwi

Purpose: Improve company’s performance by capturing critical knowledges of employee in each Department. Design/methodology/approach: Knowledge audit is used to capture the knowledge database, and Analytical Hierarchy Process (AHP) is used to obtain critical knowledge. Findings: The results show that there are 30 points knowledges with 3 critical knowledges in the Department of Production. Research limitations/implications: The study focused only on E-Print product, especially for Department of Production. Practical implications: Knowledge is one of intangible assets in a company. Aligning knowledge with performance management system will support the company to achieve it’s goaals and the sustainability of the company.   Paper type: This paper can be categorized as case study paper.

2022 ◽  
Vol 14 (1) ◽  
pp. 482
Author(s):  
Erlin Trisyulianti ◽  
Budhi Prihartono ◽  
Made Andriani ◽  
Kadarsah Suryadi

The circular economy concept needs to be part of the performance management system so that it is in line with a company’s vision and mission. Thus, the circular economy will play an important role at the operational level of companies. The circular economy needs to be internalized, starting by formulating the company’s vision and mission, establishing strategic objectives and performance indicators, and creating resource allocation policies. This research aims to design a sustainable performance management system in the context of a circular economy for state-owned plantation enterprises (SOPEs). This study used a qualitative research coding method that was validated in three SOPEs in Indonesia. Validation was performed by comparing the framework based on the conceptual formulation with the data and information obtained during field assessment. Primary data came from interviews with 15 managers, while secondary data came from official company documents. The research results show that the initial framework that was built is in accordance with the results of the exploration of the circular economy strategic objectives in the three SOPEs. The results of the 100 percent validation and perception test of managers on the range of values are important. Therefore, the proposed framework can be used in SOPE.


2010 ◽  
Vol 12 (3) ◽  
pp. 393
Author(s):  
Dermawan Wibisono ◽  
Mohammed K. Khan

Designing a Performance Management System (PMS) is anintegral part of management control systems. This paper presents ahybrid framework for the design of a PMS for the Indonesiancontext, and the tailor-made design is expected to overcome theshortcomings of earlier models. The present hybrid PMS modelseeks to improve the earlier research models using the followingnovel approaches: (1) implementation of a Knowledge-Based (KB)expert system, (2) Gauging Absences of Prerequisite (GAP) analysis, and (3) Analytical Hierarchy Process (AHP) methodology in anintegrated KBPMS. The paper shows that the present hybrid (KB-AHP-GAP) approach to developing a PMS model is a realisticmethodology. The combination of the KB-AHP-GAP approachallows detailed benchmarking of the PMS existing in an Indonesiancompany. Furthermore, this approach can assist in identifying andprioritising the key decisions that need to be executed to overcomethe existing PMS shortcomings.symbiotic strategic alliances. Con-versely, affiliate firms prefer competitive strategic alliances withcompetitors when they are not dependent on the parent firm.


2020 ◽  
Vol 25 (3) ◽  
pp. 200-215
Author(s):  
Elia Oey ◽  
Daniel Tommiki ◽  
Fachrun Nisaa Widyastuti

Performance Measurement System (PMS) is essential for any organization, as it serves as guiding compass for continuous improvement. The research is a case study in a modular concrete company refining their current PMS using Balanced Score Card approach. The research developed Balanced Score Card starting from the whole company level, and then cascaded down into 3 main company activities, design, supply and construction. Measurement for 1st quarter of 2019 was done, and target and action plans for each activity were also set for the studied company


Sign in / Sign up

Export Citation Format

Share Document