scholarly journals Performance Evaluation of Runoff River Type Hydropower Plants Operating in Nepal: A Case Study of Nepal Electricity Authority

2014 ◽  
Vol 10 (1) ◽  
pp. 104-120
Author(s):  
Sandeep Joshi ◽  
Rajendra Shrestha

Every power plant undergoes repair and maintenance which reduces the performance of the power plants as their condition undergoes periodic deterioration. To rectify the situation of aging and deterioration, timely evaluation of existing power plants is a must. Such that the evaluation will enable the decision maker to make decision regarding the present operation and maintenance practice: the need for modification of the practice or need to undergo rehabilitation in order to operate existing plants in a more efficient and effective way. Performance evaluation of a hydropower plant is performed .on the basis of various performance indicators.DOI: http://dx.doi.org/10.3126/jie.v10i1.10886Journal of the Institute of Engineering, Vol. 10, No. 1, 2014 pp. 104–120

10.14311/720 ◽  
2005 ◽  
Vol 45 (3) ◽  
Author(s):  
P. Fošumpaur ◽  
F. Čihák

The appropriate design of the turbine intake structure of a hydropower plant is based on assumptions about its suitable function, and the design will increase the total efficiency of operation. This paper deals with optimal design of the turbine structure of run-of-river hydropower plants. The study focuses mainly on optimization of the hydropower plant location with respect to the original river banks, and on the optimal design of a separating pier between the weir and the power plant. The optimal design of the turbine intake was determined with the use of 2-D mathematical modelling. A case study is performed for the optimal design of a turbine intake structure on the Nemen river in Belarus. 


Processes ◽  
2021 ◽  
Vol 9 (2) ◽  
pp. 266
Author(s):  
Md Rakibuzzaman ◽  
Sang-Ho Suh ◽  
Hyoung-Ho Kim ◽  
Youngtae Ryu ◽  
Kyung Yup Kim

Discharge water from fish farms is a clean, renewable, and abundant energy source that has been used to obtain renewable energy via small hydropower plants. Small hydropower plants may be installed at offshore fish farms where suitable water is obtained throughout the year. It is necessary to meet the challenges of developing small hydropower systems, including sustainability and turbine efficiency. The main objective of this study was to investigate the possibility of constructing a small hydropower plant and develop 100 kW class propeller-type turbines in a fish farm with a permanent magnet synchronous generator (PMSG). The turbine was optimized using a computer simulation, and an experiment was conducted to obtain performance data. Simulation results were then validated with experimental results. Results revealed that streamlining the designed shape of the guide vane reduced the flow separation and improved the efficiency of the turbine. Optimizing the shape of the runner vane decreased the flow rate, reducing the water power and increasing the efficiency by about 5.57%. Also, results revealed that tubular or cross-flow turbines could be suitable for use in fish farm power plants, and the generator used should be waterproofed to avoid exposure to seawater.


2012 ◽  
Vol 2 (8) ◽  
pp. 1-9
Author(s):  
Saroj Koul

Subject area Operations and human resourcing. Study level/applicability This case study is intended for use in graduate, executive level management and doctoral programs. The case study illustrates a combined IT and HR driven participative management control system in a flexible organization structure. It is intended for a class discussion rather than to illustrate either effective or ineffective handling of an administrative situation. Case overview The case describes the situation of managing unskilled workforces (≥14,000 workers) during the construction phase of the 4 × 250MW power plants both for purposes of turnout as well as due compensation, in the event of an accident. The approved labour forces appointed for 45 × 8 h. Man-days after a rigorous fitness test and approvals of the safety officer are allocated housing and other necessary amenities and a commensurate compensation system. Expected learning outcomes These include: illustrating typical organizational responsibility structure at a construction site of a large power plant; illustrating the planning and administrative control mechanism in implementing strategy at a construction site of a large power plant; offering students the opportunity to understand and view a typical operational (project) structure; allowing students to speculate adaptations in the wake of an ever-changing business and company environment; and providing an opportunity to introduce a power scenario in India, Indian labour laws and radio frequency identification technology and to relate this to the case in context. Supplementary materials Teaching notes are available; please consult your librarian for access.


2010 ◽  
Vol 90 (3) ◽  
pp. 189-206 ◽  
Author(s):  
Mila Pavlovic ◽  
Rajko Golic ◽  
Dejan Sabic

The territory of the municipality of Mali Zvornik is, from the aspect of morphology and spatial-functional structure, a heterogeneous area. It is located in the valley of the Drina River and in hilly-mountainous part of Podrinjske mountains. The area of the municipality is 184 km?, with 14076 inhabitants (2002). The importance of water resources for the development of the municipality, particularly of the hydropower plant (HPP) ?Zvornik?, is analyzed in this paper. Inadequate use of hydro-energetic potential, possibilities for construction of new hydropower plants and economic reasons for their construction are also emphasized. The priorities of the development of hydraulic engineering are defined in relation to morphological and hydrological conditions. They refer to increase of power of the HPP ?Zvornik? and construction of small-scale hydropower plants in hilly-mountainous part of municipality. Considering depopulation processes in the villages of Mali Zvornik, hydraulic engineering, together with agriculture, forestry, exploitation of mineral goods and tourism, can be one of the factors of demographic and economic revitalization of this area.


Author(s):  
Antonio Messineo ◽  
Domenico Panno ◽  
Roberto Volpe

Biomass can provide a reliable support for production of biofuels while contributing to sustainable management of natural resources. Many countries, including Italy, have introduced important incentive schemes to support the use of biomass for electricity, heat and transportation. This has raised considerable interest towards the use of biomass for energy generation purposes. Nonetheless, the design and installation of biomass-fuelled power plants present several critical issues, such as choice and availability of biomass, choice of technology, power plant localization and logistics. The case study tackled in this paper evaluates the economies originated by a 1MWel Organic Rankine Cycle (ORC) turbine coupled with a biomass fuelled boiler, installed in an area close to Palermo (Italy). A Geographical Information System (GIS) was used to localize the power plant and to optimize logistics. The thermodynamics of the plant as a whole were also analyzed. Finally, two different scenarios were simulated for project financial evaluation.


Author(s):  
Komandur S. Sunder Raj

The objectives of an effective power plant performance monitoring program are several-fold. They include: (a) assessing the overall condition of the plant through use of parameters such as output and heat rate (b) monitoring the health of individual components such as the steam generator, turbine-generator, feedwater heaters, moisture separators/reheaters (nuclear), condenser, cooling towers, pumps, etc. (c) using the results of the program to diagnose the causes for deviations in performance (d) quantifying the performance losses (e) taking timely and cost-effective corrective actions (f) using feedback techniques and incorporating lessons learned to institute preventive actions and, (g) optimizing performance. For the plant owner, the ultimate goals are improved plant availability and reliability and reduced cost of generation. The ability to succeed depends upon a number of factors such as cost, commitment, resources, performance monitoring tools, instrumentation, training, etc. Using a case study, this paper discusses diagnostic techniques that might aid power plants in improving their performance, reliability and availability. These techniques include performance parameters, supporting/refuting matrices, logic trees and decision trees for the overall plant as well as for individual components.


Author(s):  
Jerry A. Kopczynski ◽  
Bill Dickson ◽  
Gerhard J. Weiss

The scope of modern power plant controls usually includes plant DCS, boiler control and protection, steam/gas turbine governor and protection, auxiliaries control, automatic voltage controller, automatic synchronizer and operator/engineering stations. Usually these control packages come from different manufacturers (OEM). They are typically based on various electronic hardware and software platforms. Different communication protocols often present problems during system integration; and maintenance costs of these various electronic hardware and software platforms are normally greater than that of a stand alone system. Advantages of an integrated, distributed, open architecture, digital system, (Fig. 1) which covers all the power plant needs are discussed in this paper. A common electronic hardware/ software platform allows optimization of the new constructions and upgrades, shorten delivery and commissioning time, and improve availability and safety of the new and upgraded power plants. Specific benefits of this concept are presented in the Mt. Poso controls upgrade Case Study. The common electronic hardware/ software platform installed at Mt. Poso allowed optimization of the upgrade, shortened commissioning time, improved availability, reliability and safety and reduced maintenance cost of the control systems.


Sign in / Sign up

Export Citation Format

Share Document