scholarly journals Comprehensive Sustainability Evaluation of High-Speed Railway (HSR) Construction Projects Based on Unascertained Measure and Analytic Hierarchy Process

2018 ◽  
Vol 10 (2) ◽  
pp. 408 ◽  
Author(s):  
◽  
◽  
2014 ◽  
Vol 577 ◽  
pp. 1061-1064
Author(s):  
Feng Zhang ◽  
Xin Di Wang ◽  
Fu Shen Sheng

This paper mainly introduces the use of judgment and the decision-making process of Analytic Hierarchy Process (AHP) to solve the choice of railway line. From the aspects of economy, technology, environment and society, we determine the factors that influence the selection of railway line. Through the application of Analytic Hierarchy Process (AHP), we analyzed the problems.


2014 ◽  
Vol 933 ◽  
pp. 884-886
Author(s):  
Yang Wang ◽  
Xiao Ning Zhu

This paper analyzes the factors which influence the reliability of the crew operation of high-speed railway. With Analytic Hierarchy Process, this paper calculates the effect degrees of these factors. The form of the level of the factors is established. This paper formulates the mathematical methods that can evaluate the reliability of the crew organization of high-speed railway.


2017 ◽  
Vol 865 ◽  
pp. 707-712 ◽  
Author(s):  
José Geraldo Lamas Leite ◽  
Luiz Carlos Brasil de Brito Mello ◽  
Orlando Celso Longo ◽  
Eduardo Picanço Cruz

This paper uses the Analytic Hierarchy Process to optimize the PESTEL analysis. The scenario: pre-construction and assembly factors of huge civil engineering construction projects. Several managers use too many criteria to evaluate large projects. It suggests that there may be few important criteria that summarize the manager's preference. To demonstrate the feasibility of the proposed hypothesis, the authors prepared a qualitative and exploratory study. Conclusions are based on the judgment of an expert interviewed. As expected, the hypothesis was considered plausible. Two main criteria corresponded to 71% of the expert's preference. The result resembles a Pareto distribution.


2019 ◽  
Vol 2019 ◽  
pp. 1-23 ◽  
Author(s):  
Asim Farooq ◽  
Mowen Xie ◽  
Svetla Stoilova ◽  
Firoz Ahmad

Beijing has an enormous transportation challenge: to relieve the extreme congestion that has arisen, largely due to overpopulation. To meet this challenge, the city administration has decided to extend its territory; a new city will be planned and built. This new city, Xiongan, will reduce the burden on the capital. A new high-speed railway (HSR) line is designed to transport millions of people every day within less than an hour. This study applies the potential of Geographical Information Systems (GIS) and multicriteria methods, Analytic Hierarchy Process (AHP) and Preference Ranking Organization Method for Enrichment Evaluations (PROMETHEE II), to determine the best alternative of transportation for the new high-speed railway line between Beijing and Xiongan, comparing different ones. The methodology consists of two stages. In the first stage remote sensing datasets such as ASTER DEM and LANDSAT images and GIS software such as ERDAS IMAGINE and ArcGIS have been used to determine settlement distribution, station location, elevation model, slope percentage, vegetation percentage, and route alignment for a new high-speed railway line for better understanding of its spatial distribution pattern over the study area. The second phase of the study focusing on assessing the various alternatives of transportation has been determined, and three approaches to choosing the best alternative have been introduced. In the paper we examine criteria associated with travel and economic criteria: travel time, the number of train stops, public satisfaction with transport, the number of seats per day, connectivity, operating costs, profit, and the payback period. Six alternatives of transportation have been studied. The stops in Guan and stations in the metro’s rings have been investigated. In the second stage, the Analytic Hierarchy Process (AHP) and PROMETHEE II methods have been used to select the best alternative. The first approach uses only criteria related to the trip, as the criterion to choose the best alternative is the maximum of the net outranking flows by PROMETHEE II method; the second approach applies two independent criteria: the ratio of normalized operating costs and the normalized net outranking flows, and the ratio of the normalized payback period and the normalized net outranking flows; the third approach includes all defined criteria, and the criterion of choosing the best alternative is the maximum of net outranking flows as calculated by the PROMETHEE II method. The approaches have been analyzed with the purpose of comparing the results. The result indicates that it is expedient to have a station in Guan, which will increase the connection and connectivity among the cities while providing fast mobility options for a large number of inhabitants of Guan city. Furthermore, the result from Remote Sensing and GIS analysis demonstrates that the proposed high-speed railway line will be environmentally sustainable and is economically/socially feasible and that it will certainly attract current and future passengers because of their needs.