Risk Assessment of Subsea X-Tree System

2011 ◽  
Vol 148-149 ◽  
pp. 1000-1006 ◽  
Author(s):  
Chang Yong Wang ◽  
Hong Huan Zhang ◽  
Meng Lan Duan

That the oil and gas exploration and development is extending into deep water proceeds the rapidly shift to subsea production system. However, complex subsea equipment and frequency offshore accidents aroused the concern on the risk assessment of subsea system. The paper illustrates the hazard aspects which should be focused on in the subsea equipment compared with the surface equipment. The hazards identification and risk analysis on subsea X-tree system is carried out. A general risk-prevent process of subsea X-tree system is illustrated, so does the reliability analysis process. Besides, some commendations on subsea detection and maintenance are presented in the paper.

Author(s):  
Liaqat Ali ◽  
Shan Jin ◽  
Yong Bai

Abstract In past years, offshore oil and gas accidents have often occurred. Environmental hazards have the capability of turning into very difficult to manage in addition with the modern technology limits and lack of a fail-safe operation that can identify, control and terminate the accidents. However, the offshore crude oil also natural gas search and development is expanding to deep-water and moving promptly to the subsea production systems. (SPS). Though, the complicate subsea equipment material besides frequency offshore disasters stimulated the consideration onto the risk analysis of subsea systems. Detection of the impact of deep-water oil and gas reserves in the subsea production system. However, loss of SPSs can contribute to massive industrial failure, severe natural pollution, and indeed serious disasters. Therefore, the reliability analysis and safety of SPS have turned into a dominant consideration. This study addresses on the hazards and risk conditions which must be concentrated in the subsea machinery associated within surface equipments. Furthermore, the risks identification also the risk investigation onto subsea “Xmas tree” system is brought out. An over-all risk avert procedure of subsea “Xmas tree” system is represented, also the reliability evaluation method. Moreover, several recommendations on subsea production maintenance and detection are given in this research. This paper is reviewing the following section, subsea production system, hazards or risk identification, environmental issues, hydrate problems, corrosion problems, safety issues, risk assessment on subsea “Xmas tree”, reliability issues of a subsea system.


2014 ◽  
Vol 986-987 ◽  
pp. 1619-1623
Author(s):  
Xiao Lei Zhao ◽  
Le Ping Chu ◽  
Xing Wei Guo ◽  
Guo He Yu ◽  
Jin Yu Chen

With the development of offshore oil and gas field enters into deep water constantly, subsea production system has become the main development mode in deep water development. Pipeline End Termination (PLET) is common facilities in subsea production system and is used to provide subsea tieback interface. An embedded type PLET has been adopted in Panyu 35-1/35-2 Gas field with the water depth of 194 to 338 m. Factory Accept Test (FAT) is very important for the subsea production facilities, and the references is very limited due to technical security. This paper in detail states the flow chart, master equipment, purpose and precautions for each test of FAT for PLET, which collects great technology for the development of subsea production system.


2014 ◽  
Vol 986-987 ◽  
pp. 975-979
Author(s):  
Xiao Lei Zhao ◽  
Zhi Xing Wu ◽  
Le Ping Chu ◽  
Xing Wei Guo ◽  
Jin Yu Chen

With the development of offshore oil and gas field enters into deep water constantly, subsea production system has become the main development mode in deep water development. Subsea Inline manifold (ILM) is common facilities in subsea production system and is used to gather oil and gas from the side subsea wells. Two subsea ILMs has been adopted in Panyu 35-1/35-2 Gas field with water depth range from 194 to 338 m in South China Sea. System integration test (SIT) is very important for the subsea production facilities. This paper states the flow chart, master equipment, purpose and precautions for each test of ILM SIT, which collects great technology for the development of subsea production system.


2014 ◽  
Vol 2 (2) ◽  
pp. SC61-SC76 ◽  
Author(s):  
Rocky Roden ◽  
Mike Forrest ◽  
Roger Holeywell ◽  
Matthew Carr ◽  
P. A. Alexander

Essentially all companies exploring for oil and gas should perform a risk analysis to understand the uncertainties in their interpretations and to properly value order prospects in a company’s drilling portfolio. For conventional exploration in clastic environments, primarily sands encased in shales, a key component of the risk analysis process is evaluating direct hydrocarbon indicators, which can have a significant impact on the final risk value. We investigate the role AVO plays in the risk assessment process as a portion of a comprehensive and systematic DHI evaluation. Documentation of the geologic context and quantification of data quality and DHI characteristics, including AVO characteristics, is necessary to properly assess a prospect’s risk. A DHI consortium database of over 230 drilled prospects provides statistics to determine the importance of data quality elements, primarily in class 2 and 3 geologic settings. The most important AVO interpretation characteristics are also identified based on statistical results and correlated with well success rates. A significant conclusion is the relevance of AVO in risk analysis when it is the dominant component in the DHI portion of the risk. Critical in the risk assessment process is understanding the role AVO and DHI analysis play when prospects approach class 1 geologic settings. The impact that hydrocarbons have on the seismic response is significantly diminished in this setting versus the other AVO classes. All of these observations confirm the necessity of properly evaluating a prospect’s geologic setting and implementing a consistent and systematic risk analysis process including appropriate DHI and AVO components.


2021 ◽  
Vol 3 (8) ◽  
pp. 70-72
Author(s):  
Jianbo Hu ◽  
◽  
Yifeng Di ◽  
Qisheng Tang ◽  
Ren Wen ◽  
...  

In recent years, China has made certain achievements in shallow sea petroleum geological exploration and development, but the exploration of deep water areas is still in the initial stage, and the water depth in the South China Sea is generally 500 to 2000 meters, which is a deep water operation area. Although China has made some progress in the field of deep-water development of petroleum technology research, but compared with the international advanced countries in marine science and technology, there is a large gap, in the international competition is at a disadvantage, marine research technology and equipment is relatively backward, deep-sea resources exploration and development capacity is insufficient, high-end technology to foreign dependence. In order to better develop China's deep-sea oil and gas resources, it is necessary to strengthen the development of drilling and completion technology in the oil industry drilling engineering. This paper briefly describes the research overview, technical difficulties, design principles and main contents of the completion technology in deepwater drilling and completion engineering. It is expected to have some significance for the development of deepwater oil and gas fields in China.


2021 ◽  
Author(s):  
Joseph Rizzo Cascio ◽  
Antonio Da Silva ◽  
Martino Ghetti ◽  
Martino Corti ◽  
Marco Montini

Abstract Objectives/Scope The benefits of real-time estimation of the cool down time of Subsea Production System (SPS) to prevent formation of hydrates are shown on a real oil and gas facility. The innovative tool developed is based on an integrated approach, which embeds a proxy model of SPS and hydrate curves, exploiting real-time field data from the Eni Digital Oil Field (eDOF, an OSIsoft PI based application developed and managed by Eni) to continuously estimate the cool down time before hydrates are formed during the shutdown. Methods, Procedures, Process The Asset value optimization and the Asset integrity of hydrocarbon production systems are complex and multi-disciplinary tasks in the oil and gas industry, due to the high number of variables and their synergy. An accurate physical model of SPS is built and, then, used to develop a proxy model, which integrates hydrate curves at different MeOH concentration, being able to estimate in real time the cool down time of SPS during the shutdown exploiting data from subsea transmitters made available by eDOF in order to prevent formation of hydrates. The tool is also integrated with a user-friendly interface, making all relevant information readily available to the operators on field. Results, Observations, Conclusions The integrated approach provides a continues estimation of cool down time based on real time field data (eDOF) in order to prevent formation of hydrates and activate preservation actions. An accurate physical model of SPS is built on a real business case using Olga software and cool down curves simulated considering different operating shutdown scenarios. Hydrate curves of the considered production fluid are also simulated at different MeOH concentration using PVTsim NOVA software. Off-line simulated curves are then implemented as numerical tables combined with eDOF data by an Eni developed fast executing proxy model to produce estimated cool down time before hydrates are formed. A graphic representation of SPS behavior and its cool down time estimation during shutdown are displayed and ready to use by the operators on field in support of the operations, saving cost and time. Novel/Additive Information The benefits of real time estimation of the cool down time of SPS to prevent hydrates formation are shown in terms of saving of time and cost during the shutdown operations on a real case application. This integrated approach allows to rely on a continue, automatic and acceptably accurate estimate of the available time before hydrates are formed in SPS, including the possibility to be further developed for cases where subsea transmitters are not available or extended to other flow assurance issues.


Sign in / Sign up

Export Citation Format

Share Document