Research on Sustainability Assessment of Large-Scale Public Building

2013 ◽  
Vol 291-294 ◽  
pp. 1050-1054
Author(s):  
Jun Qi Yu ◽  
Jing Gao ◽  
Gui Yong Yan

Research the sustainability of large-scale public building, select key performance indicators (KPIs) and present a comprehensive assessment method. The sustainability assessment system and weight of all levels of indicator are established based on the method of which combine the Questionnaire with Analytic Hierarchy Process(AHP), the assessment matrix are established according to the principle of Fuzzy Comprehensive Evaluation (FCE) in order to the further assessment. The example of application is given and the results are conformed to reality. The results show that this method is feasible and it can assess the sustainability of large-scale public building accurately and efficiently.

2019 ◽  
Vol 2019 ◽  
pp. 1-10
Author(s):  
Xin Liu ◽  
Chengwei Ni ◽  
Liye Zhang ◽  
Ke Sheng ◽  
Baoning Hong

The durability of lightweight cellular concrete (LCC) and the corresponding assessment method are studied in this paper to improve the utilization of LCC in subgrade construction engineering. The durability assessment method is established by combining the analytic hierarchy process (AHP) with fuzzy comprehensive evaluation (FCE). The main assessment processes are as follows. Firstly, based on the physical and mechanical properties of LCC, the influencing factors are selected in terms of preliminary design, construction technology, and operation and management after completion of construction. The grading standard of influencing factors is established as well. Secondly, a multilevel assessment model with targets level, criteria level, and indexes level is established. AHP determines the effective weight of the lower level relative to the upper level. The consistency check of the judgment matrix is conducted to prove the rationality of the distribution of influencing factors’ effect weight. Thirdly, the membership function which is suitable for each influencing factor is built to calculate the membership degree. Besides, the practicality and reliability of AHP combined with FCE are demonstrated through a practical engineering case, which is the third section of a highway in Guangdong Province, China.


2010 ◽  
Vol 20-23 ◽  
pp. 196-201
Author(s):  
Ge Ning Xu ◽  
Fan Jiang

By combined fuzzy comprehensive evaluation with AHP (Analytic Hierarchy Process) together, a safety assessment model for overhead traveling crane is set up in regard to deficiency of safety assessment method for crane at present, which can evaluate safety of overhead traveling crane in-service qualitatively and quantitatively. Through a safety analysis and assessment on general overhead traveling crane, the result of assessment is in accord with the practical situation of overhead traveling crane. It can reflect more fully the safety of the whole crane system and the influence and level of each factor to whole crane system safety, witch an effective synthetic evaluation method is put forward for the safety evaluation of crane.


2013 ◽  
Vol 438-439 ◽  
pp. 1024-1027
Author(s):  
Xiao Guo Chen

The paper introduces some information about Harbin Metro line 1, makes the decision analysis on economies, environment, society and geological environment of Harbin Metro line 1 by some fuzzy comprehensive evaluation model, and gives the weight coefficients of indicators through analytic hierarchy process. The comprehensive evaluation result provides the basis for decision-makers during decision of metro projects.


2020 ◽  
Vol 2020 ◽  
pp. 1-10
Author(s):  
Luqiang Ma ◽  
Youlin Xu ◽  
Jiaqiang Zheng ◽  
Xiang Dai

Multifunctional intelligent boom sprayer is a development direction of boom sprayers, and it could satisfy needs of precision and variable spraying and achieve aims of sustainable development of pesticide spraying, ecological protection, and efficient plant protection by reconfiguring its structures. Therefore, the evaluation of multifunctional intelligent boom sprayer reconfigurability has a role in improving product reconfigurability while reducing product function redundancy and production costs and reducing product function redundancy and production cost. In order to comprehensively evaluate the reconfigurability of a multifunctional intelligent boom sprayer, this paper established an evaluation index system and realized the evaluation process by using fuzzy comprehensive evaluation, analytic hierarchy process, and validity test. The evaluation result would avail to directly and effectively guide product optimization and upgrade process in accordance with quantitatively analyzed evaluation indexes of intelligent boom sprayer reconfigurability by using mathematical methods such as analytic hierarchy process and validity test in evaluation process. The index system was formed from six components, which were key design information, quality, cost, efficiency, intelligence, and operational capability. Index weights were calculated by the analytic hierarchy process. Finally, a multifunctional shiftable boom intelligent sprayer was evaluated for product reconfigurability improvements by using the evaluation method. Reconfigurability evaluation result of the multifunctional shiftable boom intelligent sprayer belonged to "good" evaluation interval by the calculation of formulas. There was further room to improve product reconfigurability, as the membership degree in the “good” evaluation interval was below 0.5. The study could provide a scientific basis for improving the reconfigurability, technical performance, and operation quality of products in intelligent boom sprayer design. In addition, it may be possible to decrease the arbitrary nature of subjective design factors and support economic and ecological goals when businesses upgrade products.


Sign in / Sign up

Export Citation Format

Share Document