Risk Management of Information System Project

2013 ◽  
Vol 357-360 ◽  
pp. 2826-2829
Author(s):  
Hai Bin Liu ◽  
Fei Li ◽  
Wen Qiong Li

Risk and its management of information system project has not been too much attention, while its play an important role in the success of information system project. Risk categories, consequences, drivers and action approaches are analyzed and risk management procedure of information system project is proposed in order to carry out effective risk management during information system project management.

Author(s):  
Svetlana Sergeevna Kozunova ◽  
Alla Grigorievna Kravets

The article highlights the aspects of risk management in the information system. According to the analysis of the work of Russian and foreign scientists and world practices in the field of risk management, it is stated that there is a need to improve the effectiveness of risk management of information system and to develop a method for managing the risks of the information system. As a solution to the problem of effective risk management of the information system, there has been proposed a formalized procedure for managing the risks of the information system. The scientific novelty of this solution is the use of decision space and optimization space to reduce risks. This procedure allows to assess the damage, risk and effectiveness of risk management of the information system. The risks of the information system are determined and analyzed; a pyramidal risk diagram is developed. This diagram allows you to describe the relationship of risks with the components of the information system. The negative consequences to which these risks can lead are given. The analysis of methods and approaches to risk management has been carried out. Based on the results of the analysis, the methods GRAMM, CORAS, GOST R ISO / IEC scored to the maximum. The weak points of these methods and the difficulty of applying these methods in practice are described. The developed formalized risk management procedure to control the risks of information system can be used as management system’s element of the information security quality that complies with the recommendations of GOST R ISO / IEC 27003-2012. The prospect of further development of the research results is the development of management systems of risk of information system.


2015 ◽  
Vol 719-720 ◽  
pp. 181-186
Author(s):  
Ya Ting Li

As the external environment of the international construction project has become increasingly complex, risk management is emphasized in the project management. BIM(Building Information Model) has bring change to the Construction Industry in China. It has contributed to the schedule and cost management. However, BIM is not widely used to solve the problem of risk management. This thesis cites the possibility about BIM application to risk management and evaluates the progress it may bring to the process of risk management. Furthermore, a BIM-Risk System is proposed for Chinese international contractors to solve some major risks the international contractors may face. By using this system, the level of the project risk management will significantly improve. Then the barriers and the potential problems of applying BIM to risk management in China are analyzed. The BIM application to risk management has great value to be further researched.


2021 ◽  
Vol 26 (3) ◽  
pp. 79-86
Author(s):  
Agnieszka JĘDRUSIK

The purpose of this article is to present the process of risk management in project management. The analysis was based on a comparison of two best practices of IPMA and PRINCE. Risk management differs significantly between the two approaches, but it is up to the organization to choose its own management, monitoring and methodology tailored to the specific industry or sector. Risk management is an important aspect of the entire project life cycle and must be monitored throughout the project life cycle to protect not only the budget but all areas of the so-called "golden triangle". A very important aspect is the organization's awareness that risk management is everyone's responsibility, not just the project manager. This paper presents two different approaches to project risk management in two different methodologies.


Author(s):  
Muhammad T. Hatamleh

The majority of the approaches to managing project risk follow the logic of process groups. Project Management Institute (PMI) has 29 tools and techniques related to risk management process groups. Consequently, engineering and business schools have been accused of educating managers with sharp analytical skills but little understanding of social problems. The literature suggests that too much attention is focused on learning the techniques and formalities of risk management but not enough on the advanced issues of management. Also, the literature argues that there are two approaches to project management (hard and soft). The hard side only covers part of the managerial aspects which helps to manage foreseeable uncertainties. However, unforeseeable uncertainties need skills that related to soft side approaches such as emotional intelligence, navigating the organization’s culture, risk attitude, participative leadership style, and managing the relationship with stakeholders. This study provides an intensive review of the literature to discuss the need for integrating the hard and soft sides of management to achieve an effective risk management process. In addition, it proposes a conceptual framework that provides guidelines to enhance overall risk management efficiency.


2021 ◽  
Vol 8 (1) ◽  
pp. 94-115
Author(s):  
Luis F. Copertari

The objective of this paper is to introduce and discuss the basics of a methodology called the Probabilistic Critical Path Method (PCPM) for managing the previously identified risks (uncertainty) of the three project management dimensions: time, cost and return (performance). An interactive Graphic User Interface (GUI) has been designed for visualizing the tradeoffs among these three dimensions as well as their uncertainties on a flat computer screen. The user can choose to visualize the probability of failure (exceeding some user given due date, budget or not exceeding a given Minimally Attractive Rate of Return – MARR) or the probability of success (not exceeding the due date and the budget and exceeding the MARR). PCPM allows for comprehensive project risk management and it constitutes a new integrative project risk management framework. This paper shows that it is possible to integrate all three project management dimensions (time, cost and return) and show their known risks as well as determining the optimal cost and the associated time and return for such optimal cost. Finally, it is possible to interactively show all this multidimensional information on a flat computer screen.


2018 ◽  
pp. 1606-1632
Author(s):  
Radu-Ioan Mogos ◽  
Constanta-Nicoleta Bodea ◽  
Stelian Stancu ◽  
Augustin Purnus ◽  
Maria-Iuliana Dascalu

During the last years, the development of the project risk management competencies became a ubiquitous objective for education and training in project management due to the increasing constraints which companies face on the implementation of their projects. Alignment to the professional standards and usage of innovative methods in designing and delivery of instruction represent common requirements that education and training providers should consider and fulfill. The authors examine the main challenges in addressing project risk management subject in the education programmes and identify how these challenges could be dealt by using curriculum management systems. In order to implement the identified improvements, the authors propose an innovative architecture for a curriculum management system, which can be adopted by those universities interested in developing competencies-based programmes in project management. Some preliminary results are presented and discussed.


Complexity ◽  
2020 ◽  
Vol 2020 ◽  
pp. 1-20
Author(s):  
Franck Marle

Project Risk Management is crucial in determining the future performance of a complex project. Increasing project complexity makes it more and more difficult to anticipate potential events that could affect the project and to make effective decisions to reduce project risk exposure. To tackle these conceptual and managerial issues, the proposed approach introduces Complex Systems Theory-based improvements into some PRM subprocesses and runs the global PRM process using Agile Project Management principles. We argue that these advanced techniques for managing project risk complexity, notably risk interdependencies, are coherent with the distributed, self-organized nature of agile teams. This new way of structuring and executing Project Risk Management offers the possibility to make decisions more frequently, when needed, with a more distributed authority, and with richer information about anticipation of events and consequences of actions. First results show an appropriation of this combined approach by project members due to agile principles that allows for getting the more reliable information promised by Complex Systems Theory.