Design and Optimization of Concrete-Filled Steel Tube Arch Bridge Using Cable-Hoisting Method
2011 ◽
Vol 255-260
◽
pp. 896-900
Keyword(s):
Based on the hoisting construction feature of large hinge-support tower and field circumstance, the cable hoisting system for Meng-dong river grand bridge at the west of Hunan province is designed. Studying on cable hoisting system design and construction of the CFST arch bridge, the paper takes systematic analysis and calculations on the key construction technology of the CFST arch bridge, and puts it in practice successfully which provides experience for the similar long—span bridge construction of the follow.