scholarly journals Key performance indicators in the construction industry in Khartoum

2021 ◽  
Vol 11 (2) ◽  
pp. 141-155
Author(s):  
Eltahir A. M. Elshaikh ◽  
◽  
Salma Y. M. Mahmoud ◽  
Ahmed Omar ◽  
Audi Noureldin ◽  
...  

2018 ◽  
Vol 170 ◽  
pp. 01094
Author(s):  
Ludmila Lavrova ◽  
Nikolay Chernegov ◽  
Maria Ivanova ◽  
Zhanna Lemesheva ◽  
Elena Akimova

The main objective of the study is the development of an effective motivational mechanism for employees of construction enterprises. The paper considers particularities of remuneration of participants of construction process in order to define the application of various mechanisms of motivation and incentivisation. The existing methods of development of motivation and incentivisation are analyzed as a tool for increasing the performance of the enterprise. Scientific and methodological recommendations on the establishment and implementation of the mechanisms of motivation and incentivisation as a tool for increasing the performance of enterprises in the construction industry were developed. These recommendations allow identifying the relationship of motivation and incentivisation with the performance of the enterprise. The developed mechanism is based on the relationship between the strategic objective of the enterprise and the key performance indicators of the units or specific employees.



2021 ◽  
Vol 11 (13) ◽  
pp. 5894
Author(s):  
Géza Fischl ◽  
Peter Johansson

There is increasing pressure from developers toward architects and engineers to deliver scientifically sound proposals for often complex and cost-intensive construction products. An increase in digitalization within the construction industry and the availability of intelligently built assets and overall sustainability make it possible to customize a construction product. This servitization of construction products is assumed to perform much preferably in satisfying stakeholders’ physical, psychological, and social needs. The degree to which these products are performing can be evaluated through an evidence index. This article aims to introduce a conceptual model of an evidence index and test it in the programming stage of a case study. The investigation follows the evidence-based design approach and renders evidence through key performance indicators in the programming stage of the building process. For testing the concept, a case study investigation was performed by simulating a novice research assistant, and the amount of evidence was collected and appraised for evidence index. The case study showed that key performance indicators of a servitized project could be evaluated on a four-point scale. The quality of the evidence index generation depended on the level of expertise the evaluator has in research and the skilful use of scientific databases.



2020 ◽  
Vol 13 (2) ◽  
pp. 371 ◽  
Author(s):  
Abubakar Sadiq Mahmoud ◽  
Mohd Hamdan Ahmad ◽  
Yahya Mohd Yatim ◽  
Yakubu Aminu Dodo

Purpose: The aim of this study is to establish key performance indicators (KPIs) that can be deployed in the evaluation and promotion of safety performance of building developer`s in NigeriaDesign/methodology/approach: A thorough review of the literature was performed to generally identify sets of KPIs used to evaluate the safety performances of building developer`s during construction. Interviews and focus group discussions were conducted with eleven (11) subject matter experts and professionals to ensure inclusion, validation and clarity of the indicators and to further provide agreement/disagreement, and importance ratings for the identified KPIs. The KPIs was grouped into appropriate categories, keeping out redundant KPIs, and ensuring KPIs are clear and measurable. The Relative Importance Index (RII) and Mean values were computed.Findings: Results from the study consist of 137 KPIs, grouped into 9 categories including: Planning, design and procurement, communication on & maintenance of effective safety behaviour, construction safety policy, construction safety personnel, management effort and support, safety training and enlightenment, administration of safety processes, investigation and reporting of accidents, and rewards and sanctions for project stakeholders.  These KPIs were observed to be at different levels of importance from the respondents. The following KPIs were considered based on their extreme importance judging from the respective RII values: communicating safety requirements to designer (98.18%), safety performance set as part of contractor selection criterion (96.36%), availability and accessibility of the relevant insurance policies (98.18%) and appropriate issuance of motivational directives by the top management (100%).Originality/value:  Many studies have been done in the past where KPIs as it relates to construction safety were identified. However, the specificity of these KPIs to countries other than Nigeria requires similar research be conducted to identify building developer safety performance KPIs for the Nigerian construction industry.



2010 ◽  
Vol 16 (4) ◽  
pp. 521-530 ◽  
Author(s):  
Mladen Radujković ◽  
Mladen Vukomanović ◽  
Ivana Burcar Dunović

The importance of performance based benchmarking has become a necessity in a modern construction company and presents a constant challenge for the construction industry. The aim of this paper is to elaborate significance, role and types of Key Performance Indicators (KPI) in the construction industry and show how different management perspectives perceive the indicators. A literature review was carried out in order to generate a listing of KPIs, used among academe and the industry. Afterwards, using surveys and semi‐structured interviews, the data was gathered from more than 30 South‐East European construction companies. Results were analyzed, producing a final set of 37 indicators. This study identified a low level of awareness of KPI models and performance management processes among the companies. Furthermore, the analysis showed a substantial difference in perception of KPIs among investors, consultants and contractors, which consequently led to a compiling list of KPIs. The top ten KPI's are: Quality, Cost, Number of investor interferences, Changes in project support, Time increase, Client satisfaction, Employees’ satisfaction, Innovation and learning, Time and Identification of client's interest. The paper concludes with final remarks and guidelines for the implementation of KPIs in practice. Santrauka Šiuolaikineje statybos imoneje efektyvumu pagristo lyginimo svarba jau yra neišvengiama, o statybu pramonei tai reiškia nuolatinius iššūkius. Šiuo darbu siekiama išnagrineti pagrindiniu statybu sektoriaus veiklos rodikliu (PVR) reikšme, vaidmeni ir rūšis bei pademonstruoti, kaip šie rodikliai vertinami remiantis skirtingais vadybos požiūriais. Apžvelgta literatūra, siekiant sudaryti akademineje aplinkoje ir pramoneje naudojamu PVR saraša. Pasitelkus apklausas ir iš dalies struktūrinius pokalbius, buvo surinkti duomenys iš daugiau kaip 30 pietryčiu Europos statybos imoniu. Išanalizavus rezultatus gautas galutinis 37 rodikliu rinkinys. Šiame tyrime nustatyta, kad imones menkai ka težino apie PVR modelius ir efektyvumo valdymo procesus. Be to, paaiškejo, kad investuotojai, konsultantai ir rangovai PVR suvokia gana skirtingai, ir del to teko sudaryti PVR saraša. Dešimt pagrindiniu PVR yra šie: kokybe, kaina, investuotojo kišimosi atveju skaičius, pasikeitusi parama projektui, nukelti terminai, kliento pasitenkinimas, darbuotoju pasitenkinimas, naujoves ir mokymasis, laikas, kliento interesu nustatymas. Darbo pabaigoje pateikiamos baigiamosios pastabos ir PVR taikymo praktikoje rekomendacijos.



2018 ◽  
Vol 20 (2) ◽  
pp. 157-168 ◽  
Author(s):  
W. H. S. Madushika ◽  
B. A. K. S. Perera ◽  
B. J. Ekanayake ◽  
G. Q. P. Shen


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Firas M. Tuffaha ◽  
Sadi Assaf ◽  
Yasar Zakaria Zaben ◽  
Laith A. Hadidi

PurposeIn this work, a framework for assessing construction contractors' performance in Saudi Arabia is developed. Usually, a contractor's assessment is based on financial aspects, which are lagging indicators in nature, and can ignore other nonfinancial aspects. Hence, a more detailed contractors' assessment framework is needed for the construction industry in Saudi Arabia. A framework that integrates financial and nonfinancial aspects in one model will enable contractors to better benchmark their performance to the rest of Saudi Arabia's construction industry.Design/methodology/approachInitially, the literature is reviewed and the most commonly used key performance indicators (KPIs) are identified and surveyed through contractors’ feedback to ensure their proper alignment with Saudi Arabia’s construction industry. The adopted set of KPIs will be further prioritized through the relative importance index (RII) method based on the surveyed contractors’ perceptions. Furthermore, the important set of KPIs will be factored into various groups using principle component analysis (PCA). Finally, the findings are validated through expert judgment.FindingsAll key performance indicators (KPIs) have proven to be significant, except for the environmental factor, which happens to be nonsignificant and hence has been omitted from further consideration. The remaining KPIs have been factored through the principle component analysis method. Five generic dimensions were identified: Performance, Satisfaction, Actual Metrics, Estimated Metrics and Compliance. The model has been validated by expert feedback, and it was found to be reliable.Originality/valueThe proposed model establishes an assessment framework to aid building construction contractors in assessing their performance in real time, in addition to postconstruction assessment for business development and retrofitting purposes.





CCIT Journal ◽  
2012 ◽  
Vol 6 (1) ◽  
pp. 17-34
Author(s):  
Untung Rahardja ◽  
Muhamad Yusup Eva ◽  
Rosyifa Rosyifa

SQL Server Reporting Services is a way to analyze data, create reports using the indicators and gauges. Indicators are minimal gauges that convey the state of a single data value at a glance, and most are used to represent the state of Key Performance Indicators. Manage and harmonize the performance of an institution's educational institutions, especially universities with the performance of individuals or resources, no doubt is one of the essential elements for the success of an entity of the institution. Integrate the performance of an educational institution with individual performance is not an easy process, and therefore required a systematic approach to manage it. Implementation of a strategic management system based Balanced Scorecard can be used as a performance measurement system that will continuously monitor the successful implementation of the strategy of any public educational institution and measure the performance of its resources in a comprehensive and balanced, not the quantity but the emphasis is more concerned with the quality, so the performance of educational institutions at any time can be known clearly. Contribution of Key Performance Indicators to manage and harmonize the performance of any public institution is a solution in providing information to realize the extent of work that has set targets, identify and monitor measures of success, of course, with performance indicators show a clear, specific and measurable.



Sign in / Sign up

Export Citation Format

Share Document