Determinant Analysis on Muslims Perception towards Cash Waqf - A Study on Waqeef in Pusbang Wakaf Daarut Tauhid

Author(s):  
Rida Rosida ◽  
Suci Aprilliani Utami ◽  
Asma Arisman Dewi
Keyword(s):  
1990 ◽  
Vol 134 (1) ◽  
pp. 23-33 ◽  
Author(s):  
N. Joe Maeji ◽  
Andrew M. Bray ◽  
H. Mario Geysen

2016 ◽  
Vol 16 (9) ◽  
pp. 3131-3140 ◽  
Author(s):  
Jungpyo Hong ◽  
Sangjun Park ◽  
Sangbae Jeong ◽  
Minsoo Hahn

Author(s):  
Rinaldy Rinaldy ◽  
Muhammad Ikhsan

The project is an activity with a target that must be completed within a certain period, where in its implementation often obstacles arise between the elements involved in it. Problems that arise must be immediately handled properly and appropriately so that the achievement of results is as expected.. Conflict is a condition of the oc-currence of discrepancies between values or goals to be achieved, both existing in individuals and in relationships with others. The purpose of this research is to find out one of the main factors causing conflict in project implementation. The method used in this study is a combined method, namely quantitative and qualitative methods through the distribution of questionnaires with the limitation of project observations from 2009-2011 that have been completed, with funding coming from the Aceh Budget (APBA). Designation of respondents for all classifications of construction services, from medium classification (M) to large classification (B). Population Construction executing services from the data obtained were 502 contractors, using the Slovin formula found a sample of 84 contractors. The independent variables reviewed are the owner factor and the project condition factor, while the dependent variable is the success of the project. To analyze data using multiple linear regression with the help of Product Solutions and Statistical Services (SPSS) version 22, while the statistical analysis performed in data processing is to test the validity and reliability. Based on research shows that the owner factor is one of the maint factors that cause conflict in project implementation in Aceh Province.


2020 ◽  
Vol 3 (2) ◽  
pp. 104-114
Author(s):  
P Prasetiono ◽  
Anisa Puspa Dina

This study was conducted to analyze several variables as the determinants of credit of micro, small, and medium enterprises (MSME) in Indonesia. Those variables are society income, geographic branch penetration (GBP), demographic branch penetration (DBP), credit account per capita (CAC), and deposit account per capita (DAC) of commercial banks. The samples used in this study are 33 Provinces in Indonesia in the period 2013-2017 using the purposive sampling technique. We examined data uses the non-participant observation method by directly quoting financial, GRDP, banking, geographical, and demographic data. The analysis used in this research is multiple linear regression consisting of the classic assumption test, F test, t-test, and hypothesis testing. This study indicated that society income, CAC, and DBP have a positive and significant effect on MSME credit. In contrast, GBP has a positive but non-significant effect on MSME credit, and DBP has a significant negative effect on MSME credit.


2021 ◽  
Vol 2 (1) ◽  
pp. 15
Author(s):  
Boby Rahman ◽  
Muhammad Sidiq Aryanto

<h1><em>ABSTRAK </em></h1><p><em>Sungai Silugonggo merupakan salah satu sungai di Kabupaten Pati Kecamatan Juwana yang memiliki aktivitas sungai yang padat. Salah satu aktivitas Sungai Silugonggo adalah parkir kapal yang berjejer hingga muara laut. Aktivitas parkir kapal ini memiliki potensi untuk dapat mencemari sungai. Sehingga dianalisis variabel parkir kapal apa yang secara determinan dapat memberikan pengaruh terhadap pencemaran sungai. Dengan metodologi kuantitatif dan Teknik analisis determinan, maka didapatkan bahwa variabel lama waktu parkir kapal dan lama parkir berdasarkan ukuran kapal mempunyai pengaruh terhadap tingkat pencemaran sungai.</em></p><p><strong><em>Kata Kunci</em></strong><em> : Parkir kapal, Analisis Determinan, Pencemaran Sungai</em></p><p><strong><em> </em></strong></p><p><strong><em>ABSTRACT</em></strong><em> </em></p><p><em>Silugonggo River is one of the rivers in Pati District, Juwana District, which has dense river activity. One of the activities of the Silugonggo River is parking the boats that line the mouth of the sea. This boat parking activity has the potential to pollute the river. So that the ship parking analysis variable can determinedly have an influence on river pollution. With quantitative methodology and determinant analysis techniques, it is found that the variables of ship parking time and length of time are determined based on the size of the ship which affects the level of river pollution.</em></p><p><em>Keywords: ship parking, determinant analysis, river pollution</em><em></em></p>


Sign in / Sign up

Export Citation Format

Share Document