water hazard
Recently Published Documents


TOTAL DOCUMENTS

76
(FIVE YEARS 22)

H-INDEX

6
(FIVE YEARS 1)

Water ◽  
2021 ◽  
Vol 13 (15) ◽  
pp. 2102
Author(s):  
Yaohuan Huang ◽  
Zhonghua Li ◽  
Mingxing Chen ◽  
Xiaoyang Song ◽  
Ping Kang

Water resource has become a key constraint for implementing the “Belt and Road” initiative which was raised by the Chinese government. Besides the study of spatial and temporal variability of precipitation, this study created a water hazard risk map along the “Belt and Road” zone through combined flood and drought data from 1985. Our results showed that South-Eastern Asia, southern China and eastern Southern Asia are areas with the most abundant precipitations, while floods in these areas are also the most serious. Northwest China, Western Asia, Northern Africa and Southern Asia are areas highly vulnerable to drought. Furthermore, the potential influence of flood and drought were also analyzed by associating with population distribution and corridor map. It reveals that China, South-Eastern Asia, Southern Asia, Western Asia and Northern Africa have the largest population number facing potential high water hazard risk. China–India–Burma Corridor and China–Indo-China Peninsula Corridor have the largest areas facing potential high water hazard risk.


Geofluids ◽  
2021 ◽  
Vol 2021 ◽  
pp. 1-15
Author(s):  
Jingzhong Zhu ◽  
Yu Liu ◽  
Qimeng Liu ◽  
Sen Yang ◽  
Jiajun Fan ◽  
...  

The coal-forming period is mainly Permian and Carboniferous in the North China coalfield, which is one of the main coal accumulating areas in China. It is characterized by high coal rank, abundant reserves, and varieties. However, water outburst accidents originating from karst aquifers under the coal seam floor have become a terrible disaster in accompany with the deep coal exploited progressively. Water inrush events of the deep limestone have often occurred during excavation in mines. To decrease the risk of high confined water from the coal seam floor and ensure the mining under the safe water pressure of limestone aquifers, the comprehensive exploration and regional treatment are all implemented, such as drainage depressurization, curtain grouting, and grouting transformation of aquifers. Through the comprehensive treatment of the ground and underground, the water channel will be effectively filled with slurry to prevent limestone water bursting into the roadway, and the value of water-inrush coefficient is decreased below the critical value. In the study, utilizing COMSOL Multiphysics based on the finite element method to verify and determine the real layout of grouting parameters, the result shows the design plans satisfy the engineering requirements. 13321 working face located in South No.1 mining area has analyzed the effect of water hazard prevention and control. On the basis of the analysis of geophysical prospecting and validation boreholes, it is concluded that the fracture is filled with grouting slurry to block water-conducting channel effectively. In turn, the rational design parameters of grouting are confirmed as well. Finally, the water-inrush coefficient of Taiyuan formation limestone and Ordovician limestone water is calculated, respectively. The result shows that water-inrush coefficient is less than the critical value after treatment, the safety of excavating coal seam can be further assured.


There were a lot of water hazard accidents in coal mines, due to the lacking of effective methods for the coalfield surveying. The transient electromagnetic approach is one of such methods and was applied to examine the safety surveying of coal mine in the Datong coal mines during last two decades. Although there had been many successful cases of using the methods to the surveying of gobs water, meanwhile there were some difficulties to accurately detect and measure the size and location of gob water points, which still need to refine the advance of transient electromagnetic method.


2021 ◽  
Vol 261 ◽  
pp. 03003
Author(s):  
Qin Ke ◽  
Peng Dong ◽  
Duan Huijun

two roadways in adjacent working face of Baode Mine may have the risk of water inrush at the same time, so it is necessary to construct long borehole to cover the roadway excavation. On the basis of the hydrogeological conditions of the mine, the safe water insulation thickness and water inrush coefficient of coal seam No .8 are calculated. The results show that the water inrush coefficient is 0.035-0.037 MPa/m, which is less than the critical value 0.06 MPa/m and the bottom plate has no sudden water hazard. In the construction of No .10 coal seam, the directional long borehole is used to detect whether there is a hidden structure communicating with the floor limestone and to drain water. The test shows that there is no effluent phenomenon in the borehole, which proves that there is no hidden structure in No .10 coal seam.


2020 ◽  
Vol 590 ◽  
pp. 125350
Author(s):  
Zaibin Liu ◽  
Ruijue Zhao ◽  
Shuning Dong ◽  
Wenke Wang ◽  
Huaifeng Sun ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document