STMJ (STRUCTURE TECHNOLOGY MANAGEMENT JOURNAL)
Latest Publications


TOTAL DOCUMENTS

5
(FIVE YEARS 5)

H-INDEX

0
(FIVE YEARS 0)

Published By Universitas Islam Indragiri

2775-7846

2021 ◽  
Vol 1 (1) ◽  
pp. 1
Author(s):  
Agung Prayogi

Abstract Concrete is the most widely used material throughout the world and innovations continue to be carried out to produce efficient development. Shell charcoal ash and rice husk ash are industrial by-products which have the potential to replace sand for concrete mix, especially in Indragiri Hilir. The research with the title "Effect of Mixture of Rice Husk Ash and Shell Ash Ashes as Substitute for Some Fine Aggregates Against Concrete Compressive Strength" aims to prove the effect of a mixture of shell charcoal ash and husk ash to replace some of the sand to produce maximum compressive strength. Concrete is a mixture of Portland cement, fine aggregate, coarse aggregate, and water. This research uses 5 variations of the mixture to the weight of sand, BSA 0 without a substitute mixture, BSA 1 with a mixture of 5% husk ash and 10% shell charcoal, BSA 2 with a mixture of 5% husk ash and 15% charcoal ash, BSA 3 with a mixture of 5% husk ash and 18% charcoal, BSA 4 with a mixture of 10% husk and 10% charcoal, and BSA 5 with a mixture of 13% husk ash and 10% charcoal ash. SNI method is used for the Job Mix Formula (JMF) mixture in this research. The results of the average compressive strength of concrete at 28 days for JMF of 21.05 MPa, BSA 1 of 23.68 MPa, BSA 2 of 22.23 MPa, BSA 3 of 14.39 MPa, BSA 4 of 13.34 MPa , and BSA 5 of 20.14 MPa. The conclusion drawn from the results of the BSA 1 research with a mixture of 5% husk ash and 15% charcoal ash produced the highest average compressive strength of 23.68 MPa. Abstrak Beton merupakan material paling banyak digunakan diseluruh dunia dan terus dilakukan inovasi untuk menghasilkan pembangunan yang efisien. Abu arang tempurung dan abu sekam padi merupakan hasil sampingan industri yang berpotensi sebagai pengganti pasir untuk campuran beton, khususnya di Indragiri Hilir. Penelitian dengan judul “Pengaruh Campuran Abu Sekam Padi dan Abu Arang Tempurung Sebagai Pengganti Sebagian Agregat Halus Terhadap Kuat Tekan Beton” ini bertujuan membuktikan adanya pengaruh campuran abu arang tempurung dan abu sekam untuk mengganti sebagian pasir hingga menghasilkan kuat tekan maksimum. Beton adalah campuran antara semen portland, agregat halus, agregat kasar, dan air. Penelitian ini menggunakan 5 variasi campuran terhadap berat pasir, BSA 0 tanpa campuran pengganti, BSA 1 dengan campuran 5 % abu sekam dan 10% arang tempurung, BSA 2 dengan campuran 5% abu sekam dan 15% abu arang, BSA 3 dengan campuran 5% abu sekam dan 18% arang, BSA 4 dengan campuran 10% sekam dan 10% arang, dan BSA 5 dengan campuran 13% abu sekam dan 10% abu arang. Metode SNI digunakan untuk campuran Job Mix Formula (JMF)  pada penelitian ini. Hasil rata-rata kuat tekan beton pada umur 28 hari untuk JMF sebesar 21,05 MPa, BSA 1 sebesar 23,68 MPa, BSA 2 sebesar 22,23 MPa, BSA 3 sebesar 14,39 MPa, BSA 4 sebesar 13,34 MPa, dan BSA 5 Sebesar 20,14 MPa. Ditarik kesimpulan dari hasil penelitian BSA 1 dengan campuran 5% abu sekam dan 15% abu arang menghasilkan rata-rata kuat tekan tertinggi yaitu sebesar 23,68 MPa.  


2021 ◽  
Vol 1 (1) ◽  
pp. 10
Author(s):  
M. Yoga Ali Akbar

Abstract Building planning in this study is a three-story Islamic boarding school building planning. The building function in this planning is used for the male students' learning building, with planning data based on Permendiknas No. 24/2007. Structural analysis to calculate internal forces on the structure uses two methods, namely the Cross method and the Cantilever Method. The Cross method or also known as the moment distribution method is used to calculate the vertical forces acting on the structure, in the analysis process this method carries out a moment distribution and induction (cary over) of the primary moment (Fixed End Moment) for a number of rounds (iterations) in order to get balance at each knot point. While the cantilever method is used to calculate the horizontal force acting on the structure. The cantilever method is an approximate method for calculating the shear and moment forces developed in beams and columns of a frame or structure due to lateral loads. The applied lateral loads usually include wind loads and earthquake loads, which must be taken into account when planning a building structure. The assumptions used in this method are that the contraflexure points (or the moment diagram inflection points) in the vertical and horizontal sections are located at the midpoint. Abstrak Perencanaan gedung dalam penelitian ini adalah perencanaan gedung Pondok Pesantren bertingkat tiga. Fungsi gedung di perencanaan ini digunakan untuk gedung belajar santri putra, dengan data – data perencanaan berdasarkan Permendiknas No 24 Tahun 2007. Analisa struktur untuk menghitung gaya – gaya dalam pada struktur mengunakan dua metode yaitu metode Cross dan Metode Kantilever. Metode Cross atau biasa juga disebut metode distribusi momen digunakan untuk menghitung gaya – gaya vertikal yang bekerja pada struktur, dalam proses analisis metode ini melalukan distribusi momen dan induksi (cary over) terhadap momen primer  (Fixed End Momen) sebanyak beberapa putaran (iterasi) guna mendapatkan keseimbangan di setiap titik simpul. Sedangkan metode Kantilever digunakan untuk menghitung gaya Horizontal yang bekerja pada struktur. Metode Kantilever adalah metode perkiraan untuk menghitung gaya geser dan momen yang dikembangkan dalam balok dan kolom bingkai atau struktur karena beban lateral. Beban lateral yang diterapkan biasanya mencakup beban angin dan beban gempa, yang harus dipertimbangkan saat merencanaan struktur bangunan. Asumsi-asumsi yang digunakan dalam metode ini adalah bahwa titik-titik contraflexure (atau titik-titik infleksi diagram momen) di bagian vertikal dan horizontal terletak di titik tengah.  


2021 ◽  
Vol 1 (1) ◽  
pp. 15
Author(s):  
Kusmaran Kusmaran

Abstract Construction Projects is one form of activity that takes place in a limited period of time, with certain resources, to achieve results in the form of buildings or infrastructure. Construction projects involve contractors, project owners, planning consultants and supervisory consultants that are interrelated in a work agreement called a contract. Project delays for contractors will experience a loss of time and costs, because the benefits expected by the contractor will decrease or even not get the expected benefits that they may not even benefit at all. The delay in the completion of the project work will cause a loss to the Owner to the operating time of the project results, so that the use of the project development results will be delayed or late. The success of a construction project is determined by the suitability of time, cost and quality stipulated in the contract document. In the implementation of construction projects delays often occur due to the parties involved. This research was conducted with the aim of finding out the factors causing delays in the implementation of construction projects according to contractors, project owners and supervisory consultants. Conducted by distributing questionnaires to contractors, supervisors and consultants, the results obtained were processed using the SPSS program. The results of the study revealed that the factors that caused the delay in construction projects were the 3 most dominant were the lack of skilled labor in the category of human resources Unexpected weather falls into the category of external aspects, and differences in interpretation of work codes fall into the categories of organization, coordination and communication aspects Abstrak Proyek Konstruksi merupakan salah satu bentuk kegiatan yang berlangsung dalam jangka waktu terbatas, dengan sumber daya tertentu, untuk mencapai hasil dalam bentuk bangunan atau infrastruktur. Proyek konstruksi melibatkan kontraktor, pemilik proyek, konsultan perencana dan konsultan pengawas yang saling terkait dalam sebuah perjanjian kerja yang disebut kontrak. Keterlambatan   proyek   bagi   kontraktor akan  mengalami  kerugian  waktu dan  biaya, karena keuntungan yang diharapkan oleh kontraktor  akan berkurang atau  bahkan tidak mendapatkan keuntungan yang diharapkan bahkan  bisa tidak mendapat keuntungan sama sekali. Keterlambatan penyelesaian  pekerjaan  proyek akan menyebabkan  kerugian bagi Owner  terhadap  waktu operasi hasil proyek, sehingga penggunaan hasi pembangunan proyek menjadi mundur atau terlambat. Keberhasilan suatu proyek konstruksi ditentukan dari kesesuaian waktu, biaya dan mutu yang ditetapkan dalam dokumen kontrak. Dalam pelaksanaan proyek konstruksi sering terjadi keterlambatan yang disebabkan oleh pihak- pihak yang terlibat.  Penelitian ini dilakukan dengan tujuan untuk mengetahui factor penyebab keterlambatan pelaksanaan proyek konstruksi menurut kontraktor, pemilik proyek dan konsultas pengawas. Dilakukan dengan menyebarkan kuisioner kepada kontraktor, pemilik dan konsultan pengawas, hasil yang diperoleh diolah menggunakan program SPSS, Hasil penelitian  tersebut diketahui bahwa factor penyebab keterlambatan pelaksanaan proyek konstrusi terdapat 3 yang paling dominan adalah Kurangnya tenaga kerja terampil masuk dalam kategori aspek sumber daya manusia, keadaan cuaca yang tak terduga masuk dalam kategori aspek eksternal, dan perbedaan intepretasi kode pekerjaan masuk dalam kategori aspek organisasi, koordinasi dan komunikasi.  


2021 ◽  
Vol 1 (1) ◽  
pp. 23
Author(s):  
Hana Zahara

Abstract The building is an important element in the development of an area. In the construction of a building must pay attention to matters relating to the conditions of the surrounding environment. For this reason, planning is necessary in accordance with the function of the building and the area to be built and must calculate how much material is needed. The planning of the female dormitory building is planned to fulfill the Indragiri Hilir district government program, namely 1 Village 1 Tahfidz House by following the Operational Technical Guidelines (PTO) of Maju Inhil Jaya Plus Integrated Village (DMIJPT) 2019 concerning Tahfidz Houses. The calculation of the structure of the dormitory uses the Cross method for calculating vertical loads and the Portal method for calculating horizontal loads   Abstrak Gedung merupakan salah satu unsur penting dalam hal pengembangan suatu daerah. Dalam pembangunan sebuah gedung harus memperhatikan hal-hal yang berkaitan dengan kondisi lingkungan sekitar. Untuk itu perlu dilakukan perencanaan yang sesuai dengan fungsi gedung dan wilayah yang akan dibangun serta harus menghitung berapa besar kebutuhan material yang diperlukan. Perencanaan Gedung asrama putri ini direncanakan untuk memenuhi program  pemerintah kabupaten Indragiri Hilir yaitu 1 Desa 1 Rumah Tahfidz dengan mengikuti Petunjuk Teknis Operasional (PTO) Desa Maju Inhil Jaya Plus Terintegritas (DMIJPT) Tahun 2019 tentang Rumah Tahfidz. Perhitungan struktur gedung asrama ini menggunakan metode Cross untuk perhitungan beban vertikal dan Metode Portal untuk perhitungan beban horizontal.


2021 ◽  
Vol 1 (1) ◽  
pp. 28
Author(s):  
Nadila Mailiyani

Abstract The female dormitory building in Sei Raya village, indragiri hilir district is planned to fulfill government activities, namely the basic Guidelines for the 1 Village 1 Tahfidz House Program by following the DMIJPT 2019 Operational Technical Guidelines (PTO) on Tahfidz Houses. Planning for dormitory building analysis calculations using the Engilab Beam application. The length of the building is 48 m wide 12 m from the data so it is dilated. The dilatation used is two-column dilatation.   Abstrak Gedung asrama putri di desa Sei Raya keabupaten indragiri hilir  dierencanakan untuk memenuhi kegiatan pemerintah yaitu tentang Petunjuk dasar Program 1 Desa 1 Rumah Tahfidz dengan mengikuti Petunjuk Teknis Operasional (PTO) DMIJPT Tahun 2019 Tentang Rumah Tahfidz. Perencanaan gedung asrama analisa perhitungan menggunakan Aplikasi  Engilab Beam. Panjang gedung adalah 48 m lebar 12 m dari data tersebut maka  dilakukan Dilatasi. Dilatasi yang dipakai adalah dilatasi dua kolom


Sign in / Sign up

Export Citation Format

Share Document