Stability Analysis of Stakeholders’ Cooperation in Inter-Basin Water Transfer Projects: a Case Study

2018 ◽  
Vol 33 (1) ◽  
pp. 1-18 ◽  
Author(s):  
Azadeh Ahmadi ◽  
Mohammad Amin Zolfagharipoor ◽  
Ali Akbar Afzali
Energies ◽  
2020 ◽  
Vol 13 (10) ◽  
pp. 2564 ◽  
Author(s):  
Anderson Passos de Aragão ◽  
Patrícia Teixeira Leite Asano ◽  
Ricardo de Andrade Lira Rabêlo

The Hydrothermal Coordination problem consists of determining an operation policy for hydroelectric and thermoelectric plants within a given planning horizon. In systems with a predominance of hydraulic generation, the operation policy to be adopted should specify the operation of hydroelectric plants, so that hydroelectric resources are used economically and reliably. This work proposes the implementation of reservoir operation rules, using inter-basin water transfer through an optimization model based on Network Flow and Particle Swarm Optimization (PSO). The proposed algorithm aims to obtain an optimized operation policy of power generation reservoirs and consequently to maximize the hydroelectric benefits of the hydrothermal generation system, to reduce the use of thermoelectric plants, the importation and/or energy deficit and to reduce the cost associated with meeting the demand and reduce CO2 emissions from combustion of fossil fuels used by thermoelectric plants. In order to illustrate the efficiency and effectiveness of the proposed approach, it was evaluated by optimizing two case studies using a system with four hydroelectric plants. The first case study does not consider transfer and water and the second case study uses water transfer between rivers. The obtained results illustrate that the proposed model allowed to maximize the hydroelectric resources of a hydrothermal generation system with economy and reliability.


2012 ◽  
Vol 256-259 ◽  
pp. 2523-2527
Author(s):  
Qian Wei Wang ◽  
Rui Rui Sun ◽  
Wei Ping Guo

With regards to the characteristics of inter-basin water transfer projects, a 3d visual simulation (Three-Dimensional Visual Simulation, 3DVS) method for inter-basin water transfer project was proposed. A virtual reproduction of the entire project and its topography is achieved. The supplement of the three-dimensional topographic data was completed by Civil 3D combinedwith Google Earth. In this paper, the 3D digital model of inter-basin water transfer project is established using 3ds Max. Based on the established digital model, the simulation of channel water were realized .The Yuzhou section of South-to-North Water Transfer Project is taken as a case study. 3D visual simulation provides an effective way for the construction management and decision-making for inter-basin water diversion project.


Hydrobiologia ◽  
2021 ◽  
Author(s):  
José Etham de Lucena Barbosa ◽  
Juliana dos Santos Severiano ◽  
Hérika Cavalcante ◽  
Daniely de Lucena-Silva ◽  
Camila Ferreira Mendes ◽  
...  

Hydrology ◽  
2021 ◽  
Vol 8 (1) ◽  
pp. 42
Author(s):  
Gerald Norbert Souza da Silva ◽  
Márcia Maria Guedes Alcoforado de Moraes

The development of adequate modeling at the basin level to establish public policies has an important role in managing water resources. Hydro-economic models can measure the economic effects of structural and non-structural measures, land and water management, ecosystem services and development needs. Motivated by the need of improving water allocation using economic criteria, in this study, a Spatial Decision Support System (SDSS) with a hydro-economic optimization model (HEAL system) was developed and used for the identification and analysis of an optimal economic allocation of water resources in a case study: the sub-middle basin of the São Francisco River in Brazil. The developed SDSS (HEAL system) made the economically optimum allocation available to analyze water allocation conflicts and trade-offs. With the aim of providing a tool for integrated economic-hydrological modeling, not only for researchers but also for decision-makers and stakeholders, the HEAL system can support decision-making on the design of regulatory and economic management instruments in practice. The case study results showed, for example, that the marginal benefit function obtained for inter-basin water transfer, can contribute for supporting the design of water pricing and water transfer decisions, during periods of water scarcity, for the well-being in both basins.


2011 ◽  
Vol 261-263 ◽  
pp. 1709-1713
Author(s):  
Meng Yang ◽  
Xiao Min Liu

This paper introduces a new failure mode pattern of soil slope – the logarithmic spiral slippery fracture. A mathematical model for the logarithmic spiral slippery fracture is established, taking the anti-shear function of the soil-nailing into consideration. The shear of soil-nailing, axial force, and the safety coefficients based on the limiting equilibrium method are derived, leading to an accurate stability analysis of the strengthening of soil slope. A case study shows that the anti-shear function of the soil-nailing can be significant and should not be ignored in engineering design.


Sign in / Sign up

Export Citation Format

Share Document