Control plan design

2022 ◽  
pp. 579-620
Author(s):  
Zhongda Du ◽  
Shukun Wang ◽  
Haitao Li ◽  
Xin You ◽  
Yongsheng Shi
Keyword(s):  
Author(s):  
J. Schüz ◽  
A. Olsson

Cancer is increasing worldwide. Th e Russian Federation is no exception in this regard with an increase of the total number of new cases predicted to rise from 529,062 in 2018 to 587,622 in 2040. Th e present high burden and increase in incident cases at the same time increases the pressure on healthcare infrastructure and related costs. Th us, primary and secondary prevention of cancer becomes essential. Occupational cancers related to exposure at the workplace are among the preventable cancer burden, due to the modifi ability of the risk through minimisation of occupational exposures and adequate worker protection. For the Russian Federation, some 20,000 cancers each year may be att ributable to occupation, but systematic recording is currently lacking. As information is also lacking on the absolute eff ect of various occupational carcinogens in the Russian workforce due to lack of large-scale epidemiological studies and because for many suspected occupational carcinogens the evidence may become stronger, the true burden may in fact be higher. Th e Russian Federation appears particularly suitable for research into occupational cancer given the sizable workforce, the heavy industr ialisation as well as the good documentation and workplace surveillance over time, so that results are both informative for the situation in the Russian Federation and on a global scale. Five challenging but not unfeasible steps of nationwide population-based cancer registration, development of a legal framework for record linkage of registries and data collections, recording of occupational cancers, large scale epidemiological occupational cancer research and rigorous implementation of worker protection on known carcinogens, lead the way to a continuously updated cancer control plan that includes the elimination of occupational cancer in the Russian Federation.


1996 ◽  
Vol 31 (3) ◽  
pp. 453-472 ◽  
Author(s):  
M. Stirrup

Abstract The Regional Municipality of Hamilton-Wentworth operates a large combined sewer system which diverts excess combined sewage to local receiving waters at over 20 locations. On average, there are approximately 23 combined sewer overflows per year, per outfall. The region’s Pollution Control Plan, adopted by Regional Council in 1992, concluded that the only reasonable means of dealing with large volumes of combined sewer overflow in Hamilton was to intercept it at the outlets, detain it and convey it to the wastewater treatment plant after the storm events. The recommended control strategy relies heavily on off-line storage, with an associated expansion of the Woodward Avenue wastewater treatment plant to achieve target reductions of combined sewer overflows to 1–4 per year on average. The region has begun to implement this Pollution Control Plan in earnest. Three off-line detention storage tanks are already in operation, construction of a fourth facility is well underway, and conceptual design of a number of other proposed facilities has commenced. To make the best possible use of these facilities and existing in-line storage, the region is implementing a microcomputer-based real-time control system. A number of proposed Woodward Avenue wastewater treatment plant process upgrades and expansions have also been undertaken. This paper reviews the region's progress in implementing these control measures.


1991 ◽  
Vol 23 (1-3) ◽  
pp. 41-48
Author(s):  
Yin Jun

The paper takes the Second Songhua River as an object for research and selects Thomas's BOD-DO stable model as the initial structure on the basis of overall investigations and analyses on water pollution in every reach. In view of the characteristics of the river being located at the north, values k’1, k’2 and k’3 in dry season of winter were determined and calculated, and a series analyses have been made. The self-purification ability of the river and the total elimination amount of the main pollutants BOD5 were also calculated. In order to minimize the required cost, we distributed the cost to the main pollution sources, which are to be controlled. We firstly set a cost function of sewage treatment plant by series design and calculated the related cost parameters, then calculated two kinds of optimal distributing models of BOD5 elimination, which were a mathematical model of extreme value of conditions and a matrix mathematical model. Now they have been applied to the practical pollution control plan for the Second Songhua River.


Sign in / Sign up

Export Citation Format

Share Document