Modeling the performance of “up-flow anaerobic sludge blanket” reactor based wastewater treatment plant using linear and nonlinear approaches—A case study

2010 ◽  
Vol 658 (1) ◽  
pp. 1-11 ◽  
Author(s):  
Kunwar P. Singh ◽  
Nikita Basant ◽  
Amrita Malik ◽  
Gunja Jain
2021 ◽  
Vol 56 (4) ◽  
pp. 621-629
Author(s):  
Orlando Antonio Duarte Hernandez ◽  
Ana Caroline Paula ◽  
Gustavo Rafael Collere Possetti ◽  
Mauricio Pereira Cantão ◽  
Miguel Mansur Aisse

This study aims to present the time behavior of wastewater flow parameters, organic matter, biogas flow, biogas composition, and its relations, measured through online sensors, in a municipal wastewater treatment plant (WWTP) operating full-scale upflow anaerobic sludge blanket (UASB) reactors, installed in the south of Brazil. WWTP has online measurement devices to evaluate some physicochemical variables of the sewage and the biogas. The COD analyzer (UV– Vis probe), ultrasonic flow meter, biogas flow meter, and biogas composition analyzer were the equipment used. The monitoring occurred for two time periods each of 72 h and one time period for 48 h in the year 2018. Data were checked with descriptive statistics, data independence was checked through the autocorrelation Box– Ljung test, normality behavior was checked with several tests (Shapiro– Wilk, Kolmogorov–Smirnov, Lilliefors, Anderson–Darling, D’Agostino K2, and Chen–Shapiro), and Spearman’s correlation coefficient was used to evaluate the correlations among the parameters. The mean sewage flow was 345 ± 120 L.s-1; removed organic load was, in average, 48%; biogas quality values were 82.32% ± 3.62% v/v (CH4), 2.66% ± 1.19% v/v (CO2), and 3453 ± 1268 ppm (H2S); and the production per capita obtained was 4.51 ± 1.65 NL.hab-1.d-1. It was estimated an electric power generation of 3118.6 kWh.d-1, which is equivalent to an installed power of 130 KW. The behavior of removed organic load and biogas flow (Nm3.h-1), produced in the treatment plant, showed variable, periodic, and nonstationary time behavior.  


2020 ◽  
Vol 15 (2) ◽  
pp. 142-151
Author(s):  
Peter Lukac ◽  
Lubos Jurik

Abstract:Phosphorus is a major substance that is needed especially for agricultural production or for the industry. At the same time it is an important component of wastewater. At present, the waste management priority is recycling and this requirement is also transferred to wastewater treatment plants. Substances in wastewater can be recovered and utilized. In Europe (in Germany and Austria already legally binding), access to phosphorus-containing sewage treatment is changing. This paper dealt with the issue of phosphorus on the sewage treatment plant in Nitra. There are several industrial areas in Nitra where record major producers in phosphorus production in sewage. The new wastewater treatment plant is built as a mechanicalbiological wastewater treatment plant with simultaneous nitrification and denitrification, sludge regeneration, an anaerobic zone for biological phosphorus removal at the beginning of the process and chemical phosphorus precipitation. The sludge management is anaerobic sludge stabilization with heating and mechanical dewatering of stabilized sludge and gas management. The aim of the work was to document the phosphorus balance in all parts of the wastewater treatment plant - from the inflow of raw water to the outflow of purified water and the production of excess sludge. Balancing quantities in the wastewater treatment plant treatment processes provide information where efficient phosphorus recovery could be possible. The mean daily value of P tot is approximately 122.3 kg/day of these two sources. The mean daily value of P tot is approximately 122.3 kg/day of these two sources. There are also two outflows - drainage of cleaned water to the recipient - the river Nitra - 9.9 kg Ptot/day and Ptot content in sewage sludge - about 120.3 kg Ptot/day - total 130.2 kg Ptot/day.


2001 ◽  
Vol 44 (2-3) ◽  
pp. 235-242 ◽  
Author(s):  
B. De heyder ◽  
P. Ockier ◽  
R. Jansen ◽  
R. Huiberts

Several process units at a wastewater treatment plant (WWTP) can produce a significant level of sound and thus induce sound nuisance for nearby residents. The risk for sound nuisance should be considered by making a prognosis of sound impact in an early project phase (planning, design). A prognosis requires information with respect to the sound characteristics of the different process units. This paper reports the development of empirical models for the sound power of relevant process units in the water line at Aquafin WWTPs. The used methodology for model derivation and validation allowed us to minimize the required number of measurements. Besides the methodology, the paper describes in detail the derivation and validation of the empirical model for the splashing water of screw pumps. Also the use of all the derived empirical models to determine the sound impact of a wastewater treatment plant at close distance is illustrated with a case-study.


2012 ◽  
Vol 66 (8) ◽  
pp. 1684-1690 ◽  
Author(s):  
Russell Yap ◽  
Michael Holmes ◽  
William Peirson ◽  
Michael Whittaker ◽  
Richard Stuetz ◽  
...  

Dissolved air flotation (DAF) incorporating filtration (DAFF) is used at the Bolivar wastewater treatment plant (WWTP) to polish lagoon effluent for reuse. Elevated algal populations are frequently experienced and can lead to increased coagulant requirements and process control issues. Streaming current detectors (SCDs) and a charge demand analyser (CDA) were used to monitor the full-scale plant. This was followed by an optimisation study using a pilot plant with a CDA. It was found that the normal operational charge demand range for DAF at Bolivar was between −46 and −40 μeq L−1. Decreasing the pH of coagulation reduced coagulant consumption and facilitated more sensitive CDA responses to changes in alum dose.


2016 ◽  
Vol 11 (1) ◽  
pp. 47-55
Author(s):  
Nadeem Khalil ◽  
Tarique Ahmad

Amongst the technologies available, the up flow anaerobic sludge blanket (UASB) process has been one of the most widely applied methods for municipal waste water treatment especially in countries of warm climatic conditions like India. However, past about one decade has witnessed rapid decline in the UASB popularity and its implementation. There has been criticism from various sections on the performance of UASB reactors for not complying with the prescribed discharge standards. It is a general hypothesis that the UASB reactors are not meant for diluted waste water like municipal sewage when typically the BOD is less than 150 mg/l, COD 250 mg/l and sulphates are more than 150mg/l. An attempt has been made through this study to investigate the reasons on the basis of quality assessment and field observations on UASB reactors and it’s post-treatment of a newly commissioned (start-up) municipal (sewage) wastewater treatment plant commonly called ‘STP’ having capacity of 14 million litres per day (MLD). Study was aimed to know the gaps during the commissioning stage which could be related to poor removal efficiencies. This paper briefly discusses some issues related to operation and maintenance of the UASB plants with purpose for improvements.


Water SA ◽  
2018 ◽  
Vol 44 (4 October) ◽  
Author(s):  
Tilik Tena Wondim ◽  
Bloodless Dzwairo

The challenge of selecting an appropriate wastewater treatment plant (WWTP) site is addressed in this study, using the case study of Bahir Dar City, Ethiopia. An innovative approach is proposed for selecting the WWTP site. Fifteen practically feasible alternatives were identified based on the geographical information system (GIS) based hydraulic design and considering the overall economy of the system. The three dimensions of sustainability were considered while evaluatingalternatives through incorporating economic, social, energy and environmental criteria in decision-making. The multiple attribute decision making (MADM) method was applied to prioritize the alternatives. Four scenarios representing the different perspectives of choices were used for weight elicitation. The results of the study show that the developed decisionmaking approach identified practically feasible alternatives. The framework and decision-making methodology developed in this study helped to facilitate the decision making by local government in a holistic view that incorporates environmental management in the city of Bahir Dar.


Sign in / Sign up

Export Citation Format

Share Document