Analysis and balance of phosphorous removal from wastewater at urban wastewater treatment plant

2020 ◽  
Vol 15 (2) ◽  
pp. 142-151
Author(s):  
Peter Lukac ◽  
Lubos Jurik

Abstract:Phosphorus is a major substance that is needed especially for agricultural production or for the industry. At the same time it is an important component of wastewater. At present, the waste management priority is recycling and this requirement is also transferred to wastewater treatment plants. Substances in wastewater can be recovered and utilized. In Europe (in Germany and Austria already legally binding), access to phosphorus-containing sewage treatment is changing. This paper dealt with the issue of phosphorus on the sewage treatment plant in Nitra. There are several industrial areas in Nitra where record major producers in phosphorus production in sewage. The new wastewater treatment plant is built as a mechanicalbiological wastewater treatment plant with simultaneous nitrification and denitrification, sludge regeneration, an anaerobic zone for biological phosphorus removal at the beginning of the process and chemical phosphorus precipitation. The sludge management is anaerobic sludge stabilization with heating and mechanical dewatering of stabilized sludge and gas management. The aim of the work was to document the phosphorus balance in all parts of the wastewater treatment plant - from the inflow of raw water to the outflow of purified water and the production of excess sludge. Balancing quantities in the wastewater treatment plant treatment processes provide information where efficient phosphorus recovery could be possible. The mean daily value of P tot is approximately 122.3 kg/day of these two sources. The mean daily value of P tot is approximately 122.3 kg/day of these two sources. There are also two outflows - drainage of cleaned water to the recipient - the river Nitra - 9.9 kg Ptot/day and Ptot content in sewage sludge - about 120.3 kg Ptot/day - total 130.2 kg Ptot/day.

Author(s):  
Narendra Pal Gole

The implementation of wastewater treatment plants has been a challenge for most countries. Economic resources, political will, institutional strength, and cultural background are important factors that define the trajectory of pollution control in many countries. Technology is sometimes mentioned as one of the reasons hindering further development. Therefore, a key objective of this research is to evaluate the performance of a plant based on the 345 MLD Upflow Anaerobic Sludge Blanket (UASB) technology by analyzing the physical and chemical parameters of the water treated by UASB to evaluate the performance of the plant located. at Bharwara Tech from Gomti Nagar Lucknow. In this study, the performance of the wastewater treatment plant and the UASB reactor was calculated. Wastewater is mixed with domestic wastewater, so the concentration of BOD and COD is relatively low. The amount of biogas produced by the UASB reactor is also less than its design value. All STP inlet and outlet water concentration results are displayed graphically.


2014 ◽  
Vol 1079-1080 ◽  
pp. 480-483
Author(s):  
Li Wang

The graduation design topic for a sewage treatment plant processesdesign - inverted AAO process in durian. Main task is tantamount to designaccording to the requirement of the nature of the city sewage, sewage, scalepreliminary design to complete sewage treatment plant and single processing structure design.


2017 ◽  
Vol 35 (1) ◽  
pp. 141-148 ◽  
Author(s):  
Michał Marzec

AbstractThe reliability of removal of selected contaminants in three technological solutions of the household sewage treatment plants was analysed in this paper. The reliability of the sewage treatment plant with activated sludge, sprinkled biological deposit and hybrid reactor (activated sludge and immersed trickling filter) was analyzed. The analysis was performed using the Weibull method for basic indicators of impurities, BOD5, COD and total suspended solids. The technological reliability of the active sludge treatment plant was 70% for BOD5, 87% for COD and 66% for total suspended solids. In the sewage treatment plant with a biological deposit, the reliability values determined were: 30% (BOD5), 60% (COD) and 67% (total suspended solids). In a treatment plant with a hybrid reactor, 30% of the BOD5and COD limit values were exceeded, while 30% of the total suspended solids were exceeded. The reliability levels are significantly lower than the acceptable levels proposed in the literature, which means that the wastewater discharged from the analysed wastewater treatment plants often exceeds the limit values of indicators specified in currently valid in Poland Regulation of the Minister of Environment for object to 2000 population equivalent.


1994 ◽  
Vol 30 (4) ◽  
pp. 25-34
Author(s):  
M. Ettala ◽  
E. Rossi

Seven operational mishaps were specified on the basis of a questionnaire on wastewater treatment plants, some of them large. In this study a process was developed for screening the chemical spill risks to municipal biological sewage treatment plant. Data on wastewater treatment processes, potential spill sources and chemical properties were combined to determine the threshold chemical quantities which may inhibit the removal of carbonaceous material, prevent nitrification and methanogenesis, cause sludge contamination or lead to the aeration capacity being exceeded. Two sewage treatment plants and eleven industrial sites were chosen for field studies. The influence of spill duration and maintenance activities on threshold quantities are discussed. A field survey lasting 1-2 hours at each site was long enough for the most relevant data to be obtained when the screening method developed was applied. Several chemical spill risks to the plants studied were specified. In addition, cases were identified in which failure of the pretreatment facilities for industrial wastewaters could cause severe mishaps at a biological wastewater treatment plant.


2012 ◽  
Vol 7 (1) ◽  
Author(s):  
M. Sarioglu

This study summarizes the findings and lessons learned from the start up and operation of a large wastewater treatment plant in warm climate under modified conditions. The treatment works comprise of a newly constructed sewage treatment plant located in the city of Dubai, U.A.E with an ultimate capacity of 300 Ml/d. The plant can be reviewed in three major parts; (i) liquid stream, (ii) sludge stream and (iii) odor control stream all having the latest state of the art technology and related equipments. The challenge in starting up the plant was related to the fact that only 20% of the flow was available in the form of hauled sewage to be hauled from septic tanks located in various parts of the city and also from the nearby industry which was uncontrollable. Furthermore, some parts of the plant were not ready to be commissioned on the day of the planned startup not to mention that effluent irrigation main was not complete to receive the treated sewage effluent (TSE) from the plant. A comprehensive commissioning plan was implemented and followed during the startup which was tailored according to the actual conditions. The plant commissioning was conducted in a phased sequence to cater for the expected and unexpected changes related to the inlet conditions. Commissioning and operation of the plant was carried for over 18 months with success considering the challenging and difficult conditions.


Water ◽  
2019 ◽  
Vol 11 (11) ◽  
pp. 2367 ◽  
Author(s):  
Andrzej Kulig ◽  
Mirosław Szyłak-Szydłowski

Methodological aspects of odor studies in ex-post analyses for Polish wastewater management facilities were analyzed based on the example of a modernized and enlarged wastewater treatment plant (WWTP) in Mazovia, in the vicinity of the Warsaw agglomeration. It is a mechanical–biological treatment plant with increased efficiency of biogen removal, using activated sludge in the treatment process, with a maximum hydraulic capacity of 60,000 m3/day. Olfactometric research was carried out by means of a method based on identification and characterization of the odor plume emitted from the examined source. This paper presents the results of odor intensity assessment (in sensory examinations according to a 6-stage scale) and odor concentration measurement (using portable field olfactometers) after the completion of the project, and compares them with similar studies conducted before the commencement of the investment. A total of 10 measurement series were carried out before modernization, and 12 after modernization of the WWTP. Odor concentration and intensity were determined, and the current meteorological situation was assessed at the measurement and observation points (receptors) located within the premises (in total 462 points) and around the WWTP (342 points). In each series of measurements on the windward side of the treatment plant, the background of air pollution with odorous substances was marked. The research showed that air flowing into the area of the sewage treatment plant is clean in terms of odor. During the research, basic sources of odor nuisance were identified, and their impact before and after modernization was characterized. The results presented in radar diagrams show changes in the percentage distribution of frequency of occurrence of individual intensity values at receptor points within and outside the area of the treatment plant. After modernization, a significant decrease in the concentration of odor emitted from the sludge dewatering building and sludge containers was determined. The air-tightness of the sewage channel (covered with concrete slabs and sealed) resulted in a significant decrease in the concentration of odor emitted from this source. Waste (in particular, sewage sludge) collected in the emergency waste storage yard was identified as the main source of odor nuisance. The waste, even after modernization, was an emitter of odorous compounds spreading outside the area of the WWTP. Nevertheless, as a result of the investment, the desired effect of reduction of the degree of odor nuisance was achieved.


2020 ◽  
Vol 12 (2) ◽  
pp. 85-92
Author(s):  
ROBERT KOWALIK ◽  
JAROSŁĄW GAWDZIK ◽  
BARBARA GAWDZIK ◽  
ALICJA GAWDZIK

Sewage sludge is a by-product of wastewater treatment processes. However, it has high fertilising and soil-forming properties, but it cannot always be used for this purpose. The two main criteria limiting their natural use are heavy metals and parasite eggs. Sewage sludge taken from the Daleszyce wastewater treatment plant has been analysed for heavy metals. For this purpose a space analysis was performed to divide the total metal content into four mobility fractions. The mobility issue determines the ability of an element, or one of its forms, to move in the environment. The studies were performed using a four-stage BCR procedure. The results were analyzed and compared to the limits applicable in Poland for sewage sludge intended for environmental use.


2021 ◽  
Vol 11 (22) ◽  
pp. 10853
Author(s):  
Pablo Viveros ◽  
Leonardo Miqueles ◽  
Rodrigo Mena ◽  
Fredy Kristjanpoller

Wastewater treatment plants (WWTPs) face two fundamental challenges: on the one hand, they must ensure an efficient application of preventive maintenance plans for their survival under competitive environments; and on the other hand, they must simultaneously comply with the requirements of reliability, maintainability, and safety of their operations, ensuring environmental care and the quality of their effluents for human consumption. In this sense, this article seeks to propose a cost-efficient alternative for the execution of preventive maintenance (PM) plans through the formulation and optimization of the opportunistic grouping strategy with time-window tolerances and non-negligible execution times. The proposed framework is applied to a PM plan for critical high-risk activities, addressing primary treatment and anaerobic sludge treatment process in a wastewater treatment plant. Results show a 26% system inefficiency reduction versus the initial maintenance plan, demonstrating the capacity of the framework to increase the availability of the assets and reduce maintenance interruptions of the WWTP under analysis.


2011 ◽  
Vol 343-344 ◽  
pp. 1265-1268
Author(s):  
Ying Zi Lin ◽  
Chang Hu Cao ◽  
Jun Yin ◽  
Hai Jun Qi

According to the heavy metal investigation of some practical data in Changchun sewage treatment plant. For wastewater treatment plant and the commonly used treatment process wastewater process of the distribution of heavy metals are analyzed. We studied the heavy metals pollutant removal efficiency of situation with A/O process of wastewater treatment plant in frozen period. And make a comparative analysis of heavy metals pilot plant and demonstration project in water, determine target pollutants and focus on removal. Thus, under low temperature conditions so as to sewage treatment plants effectively remove heavy metal pollutants to provide theoretical guidance for the control of urban sewage treatment by-product of the deposition process to improve the quality of urban sewage treatment and provide scientific basis.


2016 ◽  
Vol 2 (12) ◽  
pp. 637-645 ◽  
Author(s):  
Mohamed Ayoub ◽  
Ibrahim Gar Al-Alm Rashed ◽  
Ahmed El-Morsy

The implemented technologies for sewage sludge processing are still very limited in Egypt. Unfortunately, dealing with the produced sludge is mainly given to the drying process through natural drying beds neglecting quality of the dried sludge. The undertaken work is devoted to provide a design proposal for a typical wastewater treatment plant suitable for the small communities on a very limited area of land compared to that required to construct the conventional treatment plant that serves the same population. The proposed sewage treatment plant is certainly beneficial in reducing the capital costs by 26%, in addition to about 20% reduction in the running costs. On the other hand, electricity generated from energy produced by anaerobic digestion of sewage sludge reduces the electrical power requirements from the main grid network to about 27% in the proposed wastewater treatment plant.


Sign in / Sign up

Export Citation Format

Share Document