This article mainly expounds the importance of in-situ monitoring on the construction process of deep foundation pit. Taking the deep foundation pit of some Shenyang metro station for example, the deformation features of the supporting structure and the internal and external of foundation pit is analyzed, according to the monitoring data of the fender pile displacement during the excavation of deep foundation pit. The conclusion is obtained that the timely and accurate in-situ monitoring information is necessary to guaranteeing construction safety. We should pay more attention to the excavation speed and exert the interior support timely during the excavation of foundation pit to avoid large deformation and danger. The analytical results of monitoring data shows that the whole stage of foundation pit excavation is stable and the fender pile with internal supports can guarantee the stability of foundation pit.


2011 ◽  
Vol 243-249 ◽  
pp. 2338-2344
Author(s):  
Qing Yuan Li ◽  
Yang Wang

Taking deep excavation engineering in North Region of Senlin Park Station of Beijing Olympic Subway branch as engineering background, deformation law of enclosure structure of deep excavation are studied by the in-situ monitoring means .It shows that the maximum horizontal displacement of retaining pile is closely related with excavation depth and time. When the deep foundation pit is excavated to a certain depth, and steel brace hasn’t been erected, horizontal displacement of the pile tops is maximum. The location of the maximum horizontal displacement shifts down with foundation pit excavation and steel brace erection. With steel brace application, steel axis force decrease, so steel brace can effectively control horizontal displacements of retaining pile and internal force of steel in the pile. In addition, temperature has a certain effect to axis force of steel brace.


2011 ◽  
Vol 99-100 ◽  
pp. 1141-1145
Author(s):  
Qing Yuan Li

Combined with the Engineering environment and the requirements of construction of the deep foundation of metro station of South Gate in Xi'an, and in accordance with the basic methods and the basic principles of the monitoring of the construction of deep foundation, it gives a monitoring program of the deformation of the deep foundation pit and researches on in-site monitoring for the deformation of deep foundation, to ensure the safety of metro station construction. At the same time, it focuses on an analysis of the horizontal deformation of the retaining piles and the axial force of steel support, to provide a reference for the similar engineering information construction in the future.


2014 ◽  
Vol 580-583 ◽  
pp. 1061-1064
Author(s):  
Chun Lei Xin ◽  
Bo Gao

Many excavation and backfill methods can be used to construct a deep foundation pit, but foundation pit construction will undoubtedly affects security of existing metro station. This research based on a transfer station of Chengdu Metro, three-dimensional numerical simulation method was used to analyze the deformation of metro station by changing construction methods of foundation pit. The results show that: (1) Both excavation and backfill methods of foundation pit have a significant effect on connection segments of metro station. (2) The main body of metro station is largely unaffected by foundation pit construction but it has been in the process of subsidence. (3) The more the construction steps of foundation pit are, the more slowly the displacement of metro station changes. The above results certainly contribute to research and develop new types of construction methods for complicated metro station.