The challenges confronting the growth of sustainable prefabricated building construction in Australia: Construction industry views

2022 ◽  
pp. 103935
Author(s):  
Satheeskumar Navaratnam ◽  
Aarani Satheeskumar ◽  
Guomin Zhang ◽  
Kate Nguyen ◽  
Srikanth Venkatesan ◽  
...  
2016 ◽  
Vol 43 (4) ◽  
pp. 287-293 ◽  
Author(s):  
Yong-Woo Kim ◽  
Seung-Heon Han ◽  
June-Seong Yi ◽  
SooWon Chang

The effect of ‘supply chain management’ can be leveraged when benefits of collaboration within and beyond the capacities of individual organizations are witnessed. One of the primary tasks in reducing total supply chain costs is to understand where the costs occur in a supply chain and how each activity impacts the total supply chain costs. Most supply chains in construction usually involve multiple entities, each one in a different process. A rebar supply chain is one example where many entities are involved in different processes. The supply chain coordinator needs a supply chain cost model, which shows how each activity impacts all supply chain costs to reduce the total costs. The research suggests a supply chain cost model using time-driven activity-based costing. The proposed cost model was applied to a building construction project, followed by sensitivity analysis identifying critical activities. This method can be adapted to analyze other fragmented material supply chains in the construction industry.


2018 ◽  
Vol 2018 ◽  
pp. 1-5 ◽  
Author(s):  
Shaoli Wang ◽  
Yasir Mursalin ◽  
Gang Lin ◽  
Conghua Lin

This paper considers the problem of predicting a supply chain cost for prefabricated building construction under an uncertain situation. Based on the Activity-Based Costing (ABC) method, we establish a computational model to estimate the total cost of the prefabricated supply chain. The model can assist in not only finding the critical areas for cost reduction of the whole supply chain but also analyzing other costs of prefabricated construction projects. Furthermore, we provide a numerical example of prefabricated building construction to validate the results.


2011 ◽  
Vol 11 (3) ◽  
pp. 45-57 ◽  
Author(s):  
Eziyi Offia Ibem ◽  
Michael Nwabueze Anosike ◽  
Dominic Ezenwa Azuh ◽  
Tim O. Mosaku

This study was undertaken to identify key stress factors among professionals in building construction industry in Nigeria. This is in view of the fact that to date, very little is known about work stress among professionals in building construction industry in this country. The study involved the administration of questionnaire to 107 professionals including architects, builders, civil/structural engineers and quantity surveyors randomly selected from 60 ongoing building projects in Anambra, Ogun and Kaduna States, Nigeria. The data was analysed using descriptive statistics, and findings show that the principal sources of stress were high volume of work, uncomfortable site office environment, lack of feedback on previous and ongoing building projects, and variations in the scope of work in ongoing building projects. The paper suggests that taking responsibility for work which one has adequate capacity to handle, establishing realistic budgets and time frame for project delivery, provision of spatially adequate, visually and thermally comfortable site offices, adoption of appropriate job design practice and education of professionals on stress management strategies will reduce the incidence of stress among professionals in building industry in Nigeria. 


2018 ◽  
Vol 6 (1) ◽  
pp. 368-376
Author(s):  
Radhakrishnan ◽  
K G Selvan

The Construction Industry is the source for widespread employment for people of all walks of life, next only to Agriculture. The industry is picking up very well now after the shake of demonetisation. The builders have also understood the importance of RERA and majority of the builders are ensuring total compliance to it. The GST which was initially looked at as a blow is being viewed in its proper perspective. The current trend in the construction field is to offer “ready to occupy homes”. This is, basically, due to two reasons. Large numbers of builders are in the field doing construction, in almost the entire city and the outskirts. This healthy competition has necessitated offering maximum benefits to customers and whatever possible to retain them in their fold. In a way, the customers are being attracted so nicely that they have to only pay the initial amount at the time of booking, forget about the bother of EMI,


Author(s):  
Azeanita Suratkon ◽  
◽  
Riduan Yunus ◽  
Rafikullah Deraman ◽  
◽  
...  

Design-Bid-Build (DBB) or commonly known as Traditional method is the earliest and most prevalent procurement method used in Malaysian construction industry. Design-Build (DB) and Construction Management (CM) procurement methods were later introduced in Malaysia as an endeavour to satisfy and accommodate the increase in project complexity and the need for avoiding drawbacks of the Traditional methods. Each procurement method has different nature and possesses certain characteristics. Therefore, this study was carried out to ascertain and compare the characteristics of these three procurement methods that are implemented in building construction projects in Malaysia. A questionnaire survey was conducted among architects, consultants, contractors and owners or developers to elicit their feedback on the characteristics which were categorised into time, cost, quality, complexity and flexibility, degree of involvement and responsibility allocation and technical expertise. The findings indicated that only DB method almost fulfils all the characteristics under the six categories, whereas, DBB methods garnered agreement only for certain characteristics under time, cost, complexity and flexibility and technical expertise categories. Meanwhile, the only CM method’s characteristics that satisfy agreement from the respondents are the often used of fast track approach and lack of certainty in price. This study concludes that when a procurement method is adopted for a construction project, not all the features or characteristics will turn out as expected. There are many factors that contribute and are influential on the success in procurement methods that are worth for further investigation.