scholarly journals Characteristics of Procurement Methods in Malaysia – Comparing Design-Bid-Build, Design-Build and Construction Management

Author(s):  
Azeanita Suratkon ◽  
◽  
Riduan Yunus ◽  
Rafikullah Deraman ◽  
◽  
...  

Design-Bid-Build (DBB) or commonly known as Traditional method is the earliest and most prevalent procurement method used in Malaysian construction industry. Design-Build (DB) and Construction Management (CM) procurement methods were later introduced in Malaysia as an endeavour to satisfy and accommodate the increase in project complexity and the need for avoiding drawbacks of the Traditional methods. Each procurement method has different nature and possesses certain characteristics. Therefore, this study was carried out to ascertain and compare the characteristics of these three procurement methods that are implemented in building construction projects in Malaysia. A questionnaire survey was conducted among architects, consultants, contractors and owners or developers to elicit their feedback on the characteristics which were categorised into time, cost, quality, complexity and flexibility, degree of involvement and responsibility allocation and technical expertise. The findings indicated that only DB method almost fulfils all the characteristics under the six categories, whereas, DBB methods garnered agreement only for certain characteristics under time, cost, complexity and flexibility and technical expertise categories. Meanwhile, the only CM method’s characteristics that satisfy agreement from the respondents are the often used of fast track approach and lack of certainty in price. This study concludes that when a procurement method is adopted for a construction project, not all the features or characteristics will turn out as expected. There are many factors that contribute and are influential on the success in procurement methods that are worth for further investigation.

2016 ◽  
Vol 22 (1) ◽  
pp. 61
Author(s):  
Edwin Sandagie ◽  
M. Agung Wibowo ◽  
Bambang Purwanggono

Nowadays there are several kinds of products innovations in the construction industry, one of whom is a precast concrete slab. In fact, products of innovation are not necessarily fully able to provide a positive impact, both in terms of cost, quality, time, and waste on building construction projects. Moreover, what is offered by the manufacturer of precast concrete slab has not necessarily correspond with the needs of the customer. The purpose of this study is to analyze the comparison of products in terms of time, cost, quality, and waste between projects using precast concrete slab and the same projects that were simulated using floordeck concrete slab. This research will: (1) simulate the project if not using precast concrete slab product, (2) analyze the comparison of products in terms of time, cost, quality, and waste between the real project and the simulation project, (3) calculate the benefits obtained from the use of precast concrete slab product. The use of flyslab at Pertamina Parking Building Project (which consists of three floors and two floors using flyslab) when compared with the results of the simulation project that uses floordeck concrete slab: (1) in terms of time, it can provide a savings of 12.5% of the total duration of the simulation project, (2) in terms of costs, it can provide costs savings on the total cost structure reaches 23.13%, (3) in terms of quality, flyslab constituent materials are designed to have a higher quality when compared to floordeck concrete slab constituent materials, (4) in terms of waste, on a project that uses flyslab, the amount of waste generated is much less when compared to the results of the simulation project that uses a floordeck concrete slab.


2021 ◽  
Vol 11 (3) ◽  
pp. 7152-7157
Author(s):  
A. Alameri ◽  
A. S. A. M. Alhammadi ◽  
A. H. Memon ◽  
I. A. Rahman ◽  
N. A. N. Nasaruddin

The failure of construction projects could be attributed to several challenges that emerged during the construction process. Nine major challenges were uncovered from the literature: resource allocation, time, cost, quality, safety, project complexity, changes, uncertainties, and communication. A survey was carried out among professionals having a minimum of 10 years of experience in the construction industry to identify the occurrence and severity of these challenges. A total of 117 responses were analyzed and plotted on a risk matrix. The mean values indicated that time, cost, and quality are the top three challenges faced in construction projects, while the risk matrix revealed that all challenges are high-risk challenges. Thus, the professionals should consider suitable measures to address these challenges for improving a project’s performance.


2019 ◽  
Vol 277 ◽  
pp. 03013
Author(s):  
Noraziah Mohammad ◽  
Zabidi Hamzah

Variation order refers to any changes from the scope, plan, specification or contract document in the construction project. This changes of work is a common problem in construction projects in Malaysia. It is inevitable in any construction project and this problem can become more serious when variation order causes work progress to be impaired as a results it increased the construction time and cost that affects the construction industry in Malaysia. This paper critically review the causes of variation order in the construction industry on the double-storey terrace housing project in Malaysia. The discussions began with the construction industry in Malaysia and then related parties involved in the construction industry. The extensive local and abroad literature review on the definitions of variation order and analysis of past studies conducted on variation order and the previous study of the prediction model of variation. The extensive literature on variation order in the construction of building project may help to improve the performance in term of time, cost and quality of the construction of building projects in Malaysia.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
G.P.P.S. Perera ◽  
T.M.M.P. Tennakoon ◽  
Udayangani Kulatunga ◽  
Himal Suranga Jayasena ◽  
M.K.C.S. Wijewickrama

PurposeThe purpose of this paper is to select a suitable procurement method for steel building construction in Sri Lanka following a systematic method which weigh, both procurement selection factors and existing procurement systems.Design/methodology/approachAn abductive research stance is followed in this empirical study. Procurement selection factors were selected through a critical literature review which was followed by a quantitative questionnaire survey. The collected data were analysed using descriptive statistical analysis and relative important index.FindingsThe critical literature review outlined 46 procurement selection factors, out of which 26 factors were very important in steel building procurement selection. Short construction period and higher constructability of design are ranked at the top with the highest priority rating factors. Management-oriented procurement system was selected as the most appropriate procurement system for steel building constructions within the Sri Lankan context.Research limitations/implicationsThe study is limited to widely use three procurement systems in Sri Lankan construction industry. Yet, the process followed in selecting the most appropriate procurement system could be applied for other contexts. The implications of the study are mainly identifying management-oriented procurement as the most suitable procurement method for steel building construction in Sri Lanka.Practical implicationsThe systematic procedure of procurement method selection for steel building construction may use in the Sri Lankan construction industry to limit the resource loss due to wrong selection of procurement.Originality/valueA study which critically and comprehensively presenting a procurement selection process for steel building construction is not recorded in Sri Lanka prior to this study.


Author(s):  
Prof. Amit Kale

Abstract: A construction project of any building is mainly based on 3 important steps that are planning, Cost Estimation of the building and proper execution of construction of the building. Construction cost estimation has the lion’s share of the research effort in construction management. The Objective is to analyze the effectiveness of various cost estimation methods by comparing traditional and various online websites. This study will provide more accurate estimates that save time and minimize errors. The research conducted will be helpful for estimation of construction, also proving how the introduction of IT sector in construction industry is turning out to be beneficial. Keywords: Estimation, Construction Management, Online Websites, minimize errors


2021 ◽  
Author(s):  
K.G.A.S Waidyasekara ◽  
◽  
K.I. Ridmika ◽  
N.M.G.H. Sandagomika ◽  
A.N Konara ◽  
...  

The construction industry, which is a labour intensive and skill development of the industry would yield both economic and social returns to the national economy. Among other occupational categories, there is a significant demand for the plant and equipment (P&E) operators in the construction industry. Nevertheless, limited numbers of research are available on the said area. Hence, the aim of this paper is to investigate the status of P&E operators in Sri Lankan building construction projects. Accordingly, this study encompassed a qualitative research approach, and six semi-structured expert interviews were conducted as the data collection tool. The study revealed that mainly two categories of P&E as moveable and immovable and further identified subcategories under each. Based on the results, occupational map was developed for the P&E operators in building construction projects in Sri Lanka. Furthermore, the study revealed that technical and mechanical skills as an essential input for an efficient P& E operator. Moreover, the paper discussed issues with P & E operators. Accordingly, inconsistency, taking long leave, poor health conditions, less experience, and less motivation were identified as prominent issues.


2020 ◽  
Vol 10 (6) ◽  
pp. 6418-6421
Author(s):  
V. T. Phan

Risk management is an important task in construction management that helps the contractor to actively identify, evaluate, control, and minimize negative impacts of risks on the project, thereby ensuring its effectiveness. People involved in the construction industry need to be well - equipped with information and knowledge to manage risks adequately and systematically. The purpose of this research is to explore the attitude towards risk and risk management in construction projects of the Vietnamese construction industry, with emphasis on the perspective of contractors. The research data are collected through a questionnaire associated with in-depth semi-structured interviews. The results indicate that the perception of risk within the Vietnamese construction industry includes both threats and opportunities. The majority of professionals in the industry have a risk-neutral approach, contrary to previous research. The importance of implementing effective risk management is shared, in the planning and production phase while risk identification was perceived to be the most important out of the four core processes.


2020 ◽  
Vol 12 (23) ◽  
pp. 10153
Author(s):  
Ji-Myong Kim ◽  
Kag-Cheon Ha ◽  
Sungjin Ahn ◽  
Seunghyun Son ◽  
Kiyoung Son

This study aims to quantify the losses to third-parties on construction sites by determining the loss indicators and identifying the relationship between the losses and the indicators to improve the sustainability on building construction sites. The growing size and intricacy of recent construction projects have resulted in the growth of losses, both in quantity and frequency. Notably, third-party losses are rapidly increasing owing to the urbanization of the environment and increases in construction scale. Therefore, for efficient and sustainable construction management, a financial loss assessment model is essential to mitigate and manage such loss. This study uses the third-party losses on construction sites obtained from a major South Korean insurance company to describe the difference from the material losses and to disclose the loss indicators based on actual economic losses. ANOVA analysis and multiple regression analysis are adopted to identify the variance and define the loss indicators and to make prediction models, respectively. Several groups of loss indicators are investigated, including construction information and the occurrence of natural disasters. The findings and results of this research afford an essential guide to sustainable construction management, and they can serve as a first stage loss assessment model for construction projects.