PIH28 - ISAACUS DATA LAKE PRE-PRODUCTION PROJECT: CHILD PLACEMENT DECISION AND ITS COST DRIVERS

2018 ◽  
Vol 21 ◽  
pp. S217
Author(s):  
T. Hallinen ◽  
E. Soini ◽  
J. Tirkkonen ◽  
A. Kekoni
2020 ◽  
pp. 107755952096799 ◽  
Author(s):  
Chantal Cyr ◽  
Karine Dubois-Comtois ◽  
Daniel Paquette ◽  
Leonor Lopez ◽  
Marc Bigras

Two parenting capacity assessment (PCA) protocols, with a short parent-child intervention embedded in each protocol, evaluated the potential for enhanced parenting to orient child placement decision. Parents ( n = 69), with substantiated reports of maltreatment by child protective services, and their children (0–6) were randomly assigned to one of two PCAs with either the Attachment Video-feedback (PCA-AVI) or a psychoeducational intervention (PCA-PI) as the embedded intervention component. The PCA-AVI group showed the highest increases in parent-child interaction quality at post-test. Also, at PCA completion, evaluators’ conclusions about the parents’ capacity to care for both PCA groups were associated with parent-child interactive improvements at post-test, the court’s placement decision at post-test, and child placement one year later. However, only conclusions drawn by PCA-AVI evaluators were predictive of child re-reports of maltreatment in the year following PCA. PCAs, relying on short attachment interventions to assess the potential for enhanced parenting, are promising tools to orient child placement decisions.


2021 ◽  
Vol 123 (4) ◽  
pp. 1023-1029
Author(s):  
Fabian Grass ◽  
Amit Merchea ◽  
Kellie L. Mathis ◽  
Nitin Mishra ◽  
Herbert Heien ◽  
...  

2020 ◽  
Vol 1 ◽  
pp. 837-846
Author(s):  
M. Doellken ◽  
C. Zimmerer ◽  
S. Matthiesen

AbstractThe consideration of manufacturing in design is still a challenge for design engineers. This paper presents the results of an interview study, conducted with 15 participants. 4 challenges are identified in this study: Manufacturing-specific knowledge is mostly not sufficient. The design of manufacturing-oriented concepts in terms of costs is difficult. The feasibility of manufacturing is not assessed. The dimension of cost drivers is unknown, hindering optimisation in early stages of design. Based on these results the need for further research emerges regarding the impact of these challenges.


Sign in / Sign up

Export Citation Format

Share Document