Cost-benefit analysis of an infrastructure project and a cost-reflective tariff: A case study for investment in wastewater treatment plant in Serbia

2016 ◽  
Vol 59 ◽  
pp. 1419-1425 ◽  
Author(s):  
Malisa Djukic ◽  
Iljcho Jovanoski ◽  
Olja Munitlak Ivanovic ◽  
Milena Lazic ◽  
Dusko Bodroza
Water ◽  
2022 ◽  
Vol 14 (1) ◽  
pp. 122
Author(s):  
Jasmina Ćetković ◽  
Miloš Knežević ◽  
Slobodan Lakić ◽  
Miloš Žarković ◽  
Radoje Vujadinović ◽  
...  

Improved Cost-Benefit Analysis (CBA) analysis requires a broader analytical framework, in order to perceive each project individually from the perspective of potentially measurable and significant effects on the environment and society as a whole. The main goal of our paper is to assess the financial and economic justification for variant V3 (as the most technically optimal) of the wastewater treatment plant (WWTP) construction project in Nov Dojran, North Macedonia, with the purpose of advancing municipal infrastructure and environmental benefits from improved water treatment. Based on the economic analysis conducted, we conclude that the investment in the WWTP project is justified, because the economic internal rate of return is higher than the opportunity cost of capital (EIRR = 16.38%), the economic net present value is higher than 0, and EBCR (benefit-cost ratio) is greater than 1 (EBCR = 2.11). The highest environmental benefit of 49.2% in total environmental benefits is associated with nitrogen, while phosphorus is the next pollutant in the structure of environmental benefits at 46.1%. The environmental benefits of removing biological oxygen demand (BOD) and chemical oxygen demand (COD) are significantly less important, despite the removal of significant amounts of these pollutants during treatment. The situation is similar with suspended particles.


2018 ◽  
Vol 10 (12) ◽  
pp. 4668 ◽  
Author(s):  
Antonio Nesticò ◽  
Shuquan He ◽  
Gianluigi De Mare ◽  
Renato Benintendi ◽  
Gabriella Maselli

The process of allocating financial resources is extremely complex—both because the selection of investments depends on multiple, and interrelated, variables, and constraints that limit the eligibility domain of the solutions, and because the feasibility of projects is influenced by risk factors. In this sense, it is essential to develop economic evaluations on a probabilistic basis. Nevertheless, for the civil engineering sector, the literature emphasizes the centrality of risk management, in order to establish interventions for risk mitigation. On the other hand, few methodologies are available to systematically compare ante and post mitigation design risk, along with the verification of the economic convenience of these actions. The aim of the paper is to demonstrate how these limits can be at least partially overcome by integrating, in the traditional Cost-Benefit Analysis schemes, the As Low as Reasonably Practicable (ALARP) logic. According to it, the risk is tolerable only if it is impossible to reduce it further or if the costs to mitigate it are disproportionate to the benefits obtainable. The research outlines the phases of an innovative protocol for managing investment risks. On the basis of a case study dealing with a project for the recovery and transformation of an ancient medieval village into a widespread-hotel, the novelty of the model consists of the characterization of acceptability and tolerability thresholds of the investment risk, as well as its ability to guarantee the triangular balance between risks, costs and benefits deriving from mitigation options.


2001 ◽  
Vol 44 (2-3) ◽  
pp. 235-242 ◽  
Author(s):  
B. De heyder ◽  
P. Ockier ◽  
R. Jansen ◽  
R. Huiberts

Several process units at a wastewater treatment plant (WWTP) can produce a significant level of sound and thus induce sound nuisance for nearby residents. The risk for sound nuisance should be considered by making a prognosis of sound impact in an early project phase (planning, design). A prognosis requires information with respect to the sound characteristics of the different process units. This paper reports the development of empirical models for the sound power of relevant process units in the water line at Aquafin WWTPs. The used methodology for model derivation and validation allowed us to minimize the required number of measurements. Besides the methodology, the paper describes in detail the derivation and validation of the empirical model for the splashing water of screw pumps. Also the use of all the derived empirical models to determine the sound impact of a wastewater treatment plant at close distance is illustrated with a case-study.


2012 ◽  
Vol 66 (8) ◽  
pp. 1684-1690 ◽  
Author(s):  
Russell Yap ◽  
Michael Holmes ◽  
William Peirson ◽  
Michael Whittaker ◽  
Richard Stuetz ◽  
...  

Dissolved air flotation (DAF) incorporating filtration (DAFF) is used at the Bolivar wastewater treatment plant (WWTP) to polish lagoon effluent for reuse. Elevated algal populations are frequently experienced and can lead to increased coagulant requirements and process control issues. Streaming current detectors (SCDs) and a charge demand analyser (CDA) were used to monitor the full-scale plant. This was followed by an optimisation study using a pilot plant with a CDA. It was found that the normal operational charge demand range for DAF at Bolivar was between −46 and −40 μeq L−1. Decreasing the pH of coagulation reduced coagulant consumption and facilitated more sensitive CDA responses to changes in alum dose.