CO2 capture modelling for pulverised coal-fired power plants: A case study of an existing 1GW ultra-supercritical power plant in Shandong, China

2012 ◽  
Vol 94 ◽  
pp. 138-145 ◽  
Author(s):  
Jia Li ◽  
Xi Liang
2016 ◽  
Vol 139 (3) ◽  
Author(s):  
Bilal Hassan ◽  
Oghare Victor Ogidiama ◽  
Mohammed N. Khan ◽  
Tariq Shamim

A thermodynamic model and parametric analysis of a natural gas-fired power plant with carbon dioxide (CO2) capture using multistage chemical looping combustion (CLC) are presented. CLC is an innovative concept and an attractive option to capture CO2 with a significantly lower energy penalty than other carbon-capture technologies. The principal idea behind CLC is to split the combustion process into two separate steps (redox reactions) carried out in two separate reactors: an oxidation reaction and a reduction reaction, by introducing a suitable metal oxide which acts as an oxygen carrier (OC) that circulates between the two reactors. In this study, an Aspen Plus model was developed by employing the conservation of mass and energy for all components of the CLC system. In the analysis, equilibrium-based thermodynamic reactions with no OC deactivation were considered. The model was employed to investigate the effect of various key operating parameters such as air, fuel, and OC mass flow rates, operating pressure, and waste heat recovery on the performance of a natural gas-fired power plant with multistage CLC. The results of these parameters on the plant's thermal and exergetic efficiencies are presented. Based on the lower heating value, the analysis shows a thermal efficiency gain of more than 6 percentage points for CLC-integrated natural gas power plants compared to similar power plants with pre- or post-combustion CO2 capture technologies.


2012 ◽  
Vol 2 (8) ◽  
pp. 1-9
Author(s):  
Saroj Koul

Subject area Operations and human resourcing. Study level/applicability This case study is intended for use in graduate, executive level management and doctoral programs. The case study illustrates a combined IT and HR driven participative management control system in a flexible organization structure. It is intended for a class discussion rather than to illustrate either effective or ineffective handling of an administrative situation. Case overview The case describes the situation of managing unskilled workforces (≥14,000 workers) during the construction phase of the 4 × 250MW power plants both for purposes of turnout as well as due compensation, in the event of an accident. The approved labour forces appointed for 45 × 8 h. Man-days after a rigorous fitness test and approvals of the safety officer are allocated housing and other necessary amenities and a commensurate compensation system. Expected learning outcomes These include: illustrating typical organizational responsibility structure at a construction site of a large power plant; illustrating the planning and administrative control mechanism in implementing strategy at a construction site of a large power plant; offering students the opportunity to understand and view a typical operational (project) structure; allowing students to speculate adaptations in the wake of an ever-changing business and company environment; and providing an opportunity to introduce a power scenario in India, Indian labour laws and radio frequency identification technology and to relate this to the case in context. Supplementary materials Teaching notes are available; please consult your librarian for access.


Author(s):  
Antonio Messineo ◽  
Domenico Panno ◽  
Roberto Volpe

Biomass can provide a reliable support for production of biofuels while contributing to sustainable management of natural resources. Many countries, including Italy, have introduced important incentive schemes to support the use of biomass for electricity, heat and transportation. This has raised considerable interest towards the use of biomass for energy generation purposes. Nonetheless, the design and installation of biomass-fuelled power plants present several critical issues, such as choice and availability of biomass, choice of technology, power plant localization and logistics. The case study tackled in this paper evaluates the economies originated by a 1MWel Organic Rankine Cycle (ORC) turbine coupled with a biomass fuelled boiler, installed in an area close to Palermo (Italy). A Geographical Information System (GIS) was used to localize the power plant and to optimize logistics. The thermodynamics of the plant as a whole were also analyzed. Finally, two different scenarios were simulated for project financial evaluation.


Author(s):  
Komandur S. Sunder Raj

The objectives of an effective power plant performance monitoring program are several-fold. They include: (a) assessing the overall condition of the plant through use of parameters such as output and heat rate (b) monitoring the health of individual components such as the steam generator, turbine-generator, feedwater heaters, moisture separators/reheaters (nuclear), condenser, cooling towers, pumps, etc. (c) using the results of the program to diagnose the causes for deviations in performance (d) quantifying the performance losses (e) taking timely and cost-effective corrective actions (f) using feedback techniques and incorporating lessons learned to institute preventive actions and, (g) optimizing performance. For the plant owner, the ultimate goals are improved plant availability and reliability and reduced cost of generation. The ability to succeed depends upon a number of factors such as cost, commitment, resources, performance monitoring tools, instrumentation, training, etc. Using a case study, this paper discusses diagnostic techniques that might aid power plants in improving their performance, reliability and availability. These techniques include performance parameters, supporting/refuting matrices, logic trees and decision trees for the overall plant as well as for individual components.


Author(s):  
Stuart M. Cohen ◽  
John Fyffe ◽  
Gary T. Rochelle ◽  
Michael E. Webber

Coal consumption for electricity generation produces over 30% of U.S. carbon dioxide (CO2) emissions, but coal is also an available, secure, and low cost fuel that is currently utilized to meet roughly half of America’s electricity demand. While the world transitions from the existing fossil fuel-based energy infrastructure to a sustainable energy system, carbon dioxide capture and sequestration (CCS) will be a critical technology that will allow continued use of coal in an environmentally acceptable manner. Techno-economic analyses are useful in understanding the costs and benefits of CCS. However, typical techno-economic analyses of post-combustion CO2 capture systems assume continuous operation at a high CO2 removal, which could use 30% of pre-capture electricity output and require new capacity installation to replace the output lost to CO2 capture energy requirements. This study, however, considers the inherent flexibility in post-combustion CO2 capture systems by modeling power plants that vary CO2 capture energy requirements in order to increase electricity output when economical under electricity market conditions. A first-order model of electricity dispatch and a competitive electricity market is used to investigate flexible CO2 capture in response to hourly electricity demand variations. The Electric Reliability Council of Texas (ERCOT) electric grid is used as a case study to compare plant and grid performance, economics, and CO2 emissions in scenarios without CO2 capture to those with flexible or inflexible CO2 capture systems. Flexible CO2 capture systems can choose how much CO2 to capture based on the competition between CO2 and electricity prices and a desire to either minimize operating costs or maximize operating profits. Coal and natural gas prices have varying degrees of predictability and volatility, and the relative prices of these fuels have a major impact on power plant operating costs and the resulting plant dispatch sequence. Because the chosen operating point in a flexible CO2 capture system affects net power plant efficiency, fuel prices also influence which CO2 capture operating point may be the most economical and the resulting dispatch of power plants with CO2 capture. Several coal and natural gas price combinations are investigated to determine their impact on flexible CO2 capture operation and the resulting economic and environmental impacts at the power plant and electric grid levels. This study investigates the costs and benefits of flexible CO2 capture in a framework of a carbon-constrained future where the effects of major energy infrastructure changes on fuel prices are not entirely clear.


Author(s):  
Jerry A. Kopczynski ◽  
Bill Dickson ◽  
Gerhard J. Weiss

The scope of modern power plant controls usually includes plant DCS, boiler control and protection, steam/gas turbine governor and protection, auxiliaries control, automatic voltage controller, automatic synchronizer and operator/engineering stations. Usually these control packages come from different manufacturers (OEM). They are typically based on various electronic hardware and software platforms. Different communication protocols often present problems during system integration; and maintenance costs of these various electronic hardware and software platforms are normally greater than that of a stand alone system. Advantages of an integrated, distributed, open architecture, digital system, (Fig. 1) which covers all the power plant needs are discussed in this paper. A common electronic hardware/ software platform allows optimization of the new constructions and upgrades, shorten delivery and commissioning time, and improve availability and safety of the new and upgraded power plants. Specific benefits of this concept are presented in the Mt. Poso controls upgrade Case Study. The common electronic hardware/ software platform installed at Mt. Poso allowed optimization of the upgrade, shortened commissioning time, improved availability, reliability and safety and reduced maintenance cost of the control systems.


Author(s):  
Antonio Mambro ◽  
Francesco Congiu ◽  
Francesco Piraccini

Abstract The continuous increase of variable renewable energy and fuel cost requires steam turbine power plants to operate with high flexibility. Furthermore, the reduction in electricity price is forcing many existing and new district heating power plants to further optimize the heat production to maintain a sustainable business. This situation leads to low pressure steam turbines running at very low volume flow for an extended time. In this work, a case study of an existing 30 MWel district heating power plant located in Europe is presented. The customer request was the removal of the steam turbine last two stages along with the condenser to maximize steam delivery for district heating operations. However, based on the experience gained by GE on low load during the last years, the same heat production has been guaranteed without any significant impact on the existing unit, excluding any major modification of the plant layout such as last stage blading and condenser removal. Making use of the latest low flow modeling, the minimum cooling flow through the low-pressure turbine has been reduced by more than 90% compared to the existing unit. Optimization of the hood spray system and logic will reduce trailing edge erosion during low load operation leading to a significant extension in the last stage blade lifetime. These modifications, commercialized by GE as the Advanced Low Load Package (ALLP), provide a cheap, flexible and effective solution for the customer. With today’s knowledge, GE has the capability to guarantee low load operation minimizing the mass flow through the low-pressure turbine to the minimum required for safe operation. As a benefit to the customer, this option allows a gain in operational income of about 1.5 M€ per year.


Sign in / Sign up

Export Citation Format

Share Document