Operating control of electrical equipment of power supply systems

Author(s):  
A. Nazarichev ◽  
A. Tadzhibaev ◽  
E. Sergeeva
Author(s):  
E. I. Gracheva ◽  
A. N. Gorlov ◽  
Z. M. Shakurova

The article examines the main features of the layout of electrical equipment for shop networks of internal power supply with the definition of indicators for a group of shop customers connected to a single power center, affecting the choice of the structure of schemes for shop network sites. The parameters characterizing the circuit topology are revealed. A study is presented of the influence of the load factor of workshop transformers on their reactive power factor, it is proved by calculation by technical and economic criteria the feasibility of replacing a workshop transformer with two with a lower total power. The calculation of energy savings in the in-plant power supply systems. The type of dependences tgφ of transformers ТМ and ТСЗ with various rated powers in the function of loading transformers is established. The most significant factors of the growth of idle power losses during operation are presented. With determination of losses of active and reactive power and electricity in transformers and losses of active power in a high voltage distribution network A feasibility study was carried out on the options for internal power supply schemes with two transformers of lower power installed instead of one, and the feasibility of such a replacement to increase the efficiency of the equipment was proved and the estimated payback period for the investment capital was determined. A comparative analysis of the studied power supply schemes of industrial enterprises with the identification of their advantages and disadvantages.


Author(s):  
Gennady Kornilov ◽  
◽  
Alexandra Varganova ◽  
Andrey Shemetov ◽  
Olga Gazizova ◽  
...  

The article considers the features of design of industrial power supply system of metallurgical enterprises with on-site electrical power generation. The problems of increasing the efficiency of the main electrical equipment of on-site power plants are formulated. The analysis of development trends in the energy sector of Russian metallurgy is carried out, on the basis of which the importance of industrial on-site power plants is shown. The problem of choosing a generator automatic excitation control system of on-site power plants is con-sidered and possible ways of its solution are given. The task of regime optimization of industrial on-site power plants is considered and original optimization algorithms are presented. Methods of increasing the reliability of power supply of critical equipment and mechanisms involved in the technological process of thermal power plants are proposed. The urgency of the tasks of complex automation and digitalization in the industrial power supply systems is shown, while the special meaning of "digital twins" is noted. Possible prospects for the development of on-site power plants in the context of the decarbonization policy and the transition to alternative energy are considered.


2021 ◽  
Author(s):  
Aleksandr Shpiganovich ◽  
Alla Shpiganovich ◽  
Aleksandr Boychevskiy

2021 ◽  
Vol 939 (1) ◽  
pp. 012014
Author(s):  
A Rakhmatov ◽  
N Rajabov ◽  
Kh Yakubova

Abstract This article describes the methods and means for determining the technical condition of electrical equipment in power supply systems, particularly in transformer substations. There are many ways to determine the technical condition of electrical equipment. However, their implementation requires complex and additional equipment and devices. In addition, these tests must be carried out when the power supply system is off. This will lead to a decrease in the quality of electrical energy. Determination of the technical condition of electrical equipment using thermal imagers is performed under the voltage and in operating modes, the measurement process does not affect the parameters of the power supply system. The results of research in energy enterprises of the Syrdarya region are presented.


2019 ◽  
Vol 114 ◽  
pp. 04006
Author(s):  
Bui Ngoc Hung ◽  
Lidiia I. Kovernikova

Coal mining is one of the important economic sectors in Vietnam. Power supply systems of coal mines and open-cuts are complex. They have multiple levels of voltages and different types of loads. New electrical equipment usually works alongside with the equipment that is obsolete and worn-out. Power supply systems of industrial areas of Vietnam where coal is mined are characterized by the low power quality. In Vietnam the indices which characterize the distortion of both voltage and current waveforms have standard values. The article presents the findings upon the analysis of a power supply system of a coal open-cut in Vietnam and the electrical equipment of the coal sorting plant along with the results of the experimental studies of power quality indices and the non-sinusoidal mode parameters. The measurement analysis has shown that the indices of the 5-th and 7-th harmonics of voltage were over the limits. There are interharmonics in voltages and currents. The article analyzes the characteristics of active filters. It is possible to improve the power quality by using an active filter which generates both reactive power to increase the load power factor and harmonic and interharmonic currents to reduce the degree of voltage and current waveform distortion.


Author(s):  
Yaroslav Bederak ◽  
Viktor Taradai ◽  
Hanna Kyselova ◽  
Vladlen Kyselov

The publication presents the most common and promising models and schemes for replacing the power supply system of industrial enterprises, and an example of their use in practice for power supply to sewage treatment plants of a chemical enterprise. Various types of models are considered (in tabular form, in the form of an electrical replacement circuit or in the form of a finite-state machine), as well as a logical-probabilistic approach to the representation of the power supply system. The use of automation systems in power supply systems of industrial enterprises can reduce the total number of accidents, prevent their development, reduce the time of disconnections of electrical installations and downtime of mechanisms, and also allows to transfer to work without constant maintenance a significant number of electrical installations of substations, which, in turn, leads to a reduction in the number of service personnel, increase labor productivity and reduce maintenance costs. One of the main tasks on the way to automating the power supply system of enterprises is to present it in the form of a model. The list of replacement models and schemes that can be used to represent the power supply system of enterprises is quite large, and choosing the appropriate model, for that best meets the requirements of the final goal is quite a complex scientific task. The purpose of this article is to analyze the most common and promising models and schemes for replacing the power supply system and provide recommendations on their application in practice for power supply to sewage treatment plants of a chemical enterprise. Presenting the power supply system in the form of a table allows you to simplify and visually perform certification of electrical equipment, identify problem and weak points in the power supply system of industrial enterprises. Such a table proves that a large amount of electrical equipment at lower levels depends on a single electrical device at higher levels. The representation of the power supply system in the form of a three-phase symmetric replacement circuit can be used to calculate short-circuit currents in symmetric and unbalanced modes in the MatLab program and similar. Using the model of the power supply system in the form of a finite-state machine allows you to visually check the reliability of power supply to consumers, simplify the design of the power supply system of an industrial enterprise, select the state of switching devices in the power supply system and take into account the advantages and disadvantages of each state. It is advisable to use the methods discussed in this article to represent the power supply system (in tabular form, in the form of a finite-state machine or a three-phase symmetric replacement scheme) and their further application and use in automated power supply systems of industrial enterprises. The logical-probabilistic method allows us to consider the issue of power supply reliability based on the theory of logical algebra.


Author(s):  
A. N. Shpiganovich ◽  
A. A. Shpiganovich ◽  
V. I. Zatsepina ◽  
E. P. Zatsepin

The electric power system of the Russian Federation was most developed in the 80-90s of the last century, after which there was an almost twofold decline in the generation and transmission of  electrical energy in the system with subsequent growth. The main  problem of fuel and energy complexes is the progressive aging of  fixed production assets in conditions of increasing energy  consumption requirements, which is a source of increased risk of  major accidents. In this case, negative disturbances can arise both in the system itself and be external to it and can lead not only to a low  quality of electrical energy but also to interruptions in power supply.  The studies carried out to date are devoted to a quantitative  assessment of the reliability of power supply systems and their  equipment and do not take into account the effects of electrical equipment failures on the characteristics of production processes and the operation of technological machines. To consider the reliability of power supply systems in isolation from the operation of other systems (technological, relay protection, automation, ventilation, dewatering, etc.) means not to use the whole range of measures  aimed at improving the reliability of electricity supply, as a result it is impossible to ensure the optimum level of reliability of electricity  supply. Reliability of the power supply system must be evaluated taking into account the interaction of electrical equipment with the  equipment of all production systems. The problem of increasing the  efficiency of the functioning of industrial enterprises by optimizing  the parameters of the reliability of power supply systems is topical and of great economic importance.