A Spatio-Temporal Water Mains Integrity Management Program for California

Author(s):  
Sathya Geetha Ganesan ◽  
Diego Martínez García ◽  
Juneseok Lee ◽  
Jonathan Keck ◽  
Paul Yang
Author(s):  
Brittany Goldsmith ◽  
Elizabeth Foyt ◽  
Madhu Hariharan

As offshore field developments move into deeper water, one of the greatest challenges is in designing riser systems capable of overcoming the added risks of more severe environments, complicated well requirements and uncertainty of operating conditions. The failure of a primary riser component could lead to unacceptable consequences, including environmental damage, lost production and possible injury or loss of human life. Identification of the risks facing riser systems and management of these risks are essential to ensure that riser systems operate without failure. Operators have recognized the importance of installing instrumentation such as global positioning systems (GPS), vessel motion measurement packages, wind and wave sensors and Acoustic Doppler Current Profiler (ADCP) units to monitor vessel motions and environmental conditions. Additionally, high precision monitoring equipment has been developed for capturing riser response. Measured data from these instruments allow an operator to determine when the limits of acceptable response, predicted by analysis or determined by physical limitations of the riser components, have been exceeded. Regular processing of measured data through automated routines ensures that integrity can be quickly assessed. This is particularly important following extreme events, such as a hurricane or loop current. High and medium alert levels are set for each parameter, based on design analysis and operating data. Measured data is compared with these alert levels, and when an alert level is reached, further response evaluation or inspection of the components in question is recommended. This paper will describe the role of offshore monitoring in an integrity management program and discuss the development of alert levels based on potential failure modes of the riser systems. The paper will further demonstrate how this process is key for an effective integrity management program for deepwater riser systems.


Author(s):  
Yong-Yi Wang ◽  
Don West ◽  
Douglas Dewar ◽  
Alex McKenzie-Johnson ◽  
Millan Sen

Ground movements, such as landslides and subsidence/settlement, can pose serious threats to pipeline integrity. The consequence of these incidents can be severe. In the absence of systematic integrity management, preventing and predicting incidents related to ground movements can be difficult. A ground movement management program can reduce the potential of those incidents. Some basic concepts and terms relevant to the management of ground movement hazards are introduced first. A ground movement management program may involve a long segment of a pipeline that may have a threat of failure in unknown locations. Identifying such locations and understanding the potential magnitude of the ground movement is often the starting point of a management program. In other cases, management activities may start after an event is known to have occurred. A sample response process is shown to illustrate key considerations and decision points after the evidence of an event is discovered. Such a process can involve fitness-for-service (FFS) assessment when appropriate information is available. The framework and key elements of FFS assessment are explained, including safety factors on strain capacity. The use of FFS assessment is illustrated through the assessment of tensile failure mode. Assessment models are introduced, including key factors affecting the outcome of an assessment. The unique features of girth welds in vintage pipelines are highlighted because the management of such pipelines is a high priority in North America and perhaps in other parts of the worlds. Common practice and appropriate considerations in a pipeline replacement program in areas of potential ground movement are highlighted. It is advisable to replace pipes with pipes of similar strength and stiffness so the strains can be distributed as broadly as possible. The chemical composition of pipe steels and the mechanical properties of the pipes should be such that the possibility of HAZ softening and weld strength undermatching is minimized. In addition, the benefits and cost of using the workmanship flaw acceptance criteria of API 1104 or equivalent standards in making repair and cutout decisions of vintage pipelines should be evaluated against the possible use of FFS assessment procedures. FFS assessment provides a quantifiable performance target which is not available through the workmanship criteria. However, necessary inputs to perform FFS assessment may not be readily available. Ongoing work intended to address some of the gaps is briefly described.


2010 ◽  
Vol 26 (02) ◽  
pp. 106-110
Author(s):  
Ge Wang ◽  
Michael Lee ◽  
Chris Serratella ◽  
Stanley Botten ◽  
Sam Ternowchek ◽  
...  

Real-time monitoring and detection of structural degradation helps in capturing the structural conditions of ships. The latest nondestructive testing (NDT) and sensor technologies will potentially be integrated into future generations of the structural integrity management program. This paper reports on a joint development project between Alaska Tanker Company, American Bureau of Shipping (ABS), and MISTRAS. The pilot project examined the viability of acoustic emission technology as a screening tool for surveys and inspection planning. Specifically, testing took place on a 32-year-old double-hull Trans Alaska Pipeline System (TAPS) trade tanker. The test demonstrated the possibility of adapting this technology in the identification of critical spots on a tanker in order to target inspections. This targeting will focus surveys and inspections on suspected areas, thus increasing efficiency of detecting structural degradation. The test has the potential to introduce new inspection procedures as the project undertakes the first commercial testing of the latest acoustic emission technology during a tanker's voyage.


Author(s):  
Alex J. Baumgard ◽  
Tara L. Coultish ◽  
Gerry W. Ferris

Over the last 15 years, BGC Engineering Inc. has developed and implemented a geohazards Integrity Management Program (IMP) with 12 major pipeline operators (consisting of gas and oil pipelines and of both gathering and transmission systems). Over this time, the program has been applied to the assessment of approximately 13,500 individual hydrotechnical and geotechnical geohazard sites spanning approximately 63,000 km of operating pipelines in Canada and the USA. Hydrotechnical (watercourse) and geotechnical (slope) hazards are the primary types of geohazards that have directly contributed to pipeline failures in Canada. As with all IMPs, the core objectives of a geohazard management system are to ensure a proactive approach that is repeatable and defensible. In order to meet these objectives, the program allows for varying levels of intensity of inspection and a recommended timescale for completion of actions to manage the identified geohazards in accordance with the degree of hazard that the site poses to the pipeline. In this way, the sites are managed in a proactive manner while remaining flexible to accommodate the most current conditions at each site. This paper will provide a background to the key components of the program related specifically to existing operating pipeline systems, present pertinent statistics on the occurrence of various types of geohazards based on the large dataset of inspections, and discuss some of the lessons learned in the form of program results and program challenges from implementing a geohazard integrity management system for a dozen operators with different ages of systems, complexity of pipeline networks, and in varied geographic settings.


Author(s):  
Lawrence Ator ◽  
Minh Ho

The National Energy Board of Canada (NEB), a federal energy regulator, has implemented a management system audit program as a tool to verify compliance with its predominantly goal-oriented Onshore Pipeline Regulations, 1999 (OPR) [1]. The OPR allow individual companies to choose the most effective way to manage their pipeline systems. The audit program is based on expected elements that the NEB believes are necessary to meet the goals of the OPR. This paper will explain why these audits and expected elements are necessary and describe how goal-oriented regulations will enhance pipeline safety. The audits conducted to date have identified several challenges that the NEB and pipeline companies face in pursuit of the goal of safe pipelines; these will be described and possible solutions will be proposed. The overall objective of the paper is to explain the benefits of using a management system approach to direct a company’s pipeline integrity management program and what is required of companies to meet the expectations of the NEB.


Author(s):  
Garry L. Sommer ◽  
Brad S. Smith

Enbridge Pipelines Inc. operates one of the longest and most complex pipeline systems in the world. A key aspect of the Enbridge Integrity Management Program (IMP) is the trending, analysis, and management of data collected from over 50 years of pipeline operations. This paper/presentation describes Enbridge’s challenges, learnings, processes, and innovations for meeting today’s increased data management/integration demands. While much has been written around the premise of data management/integration, and many software solutions are available in the commercial market, the greatest data management challenge for mature pipeline operators arises from the variability of data (variety of technologies, data capture methods, and data accuracy levels) collected over the operating history of the system. Ability to bring this variable data set together is substantially the most difficult aspect of a coordinated data management effort and is critical to the success of any such project. Failure to do this will result in lack of user confidence and inability to gain “buy-in” to new data management processes. In 2001 Enbridge began a series of initiatives to enhance data management and analysis. Central to this was the commitment to accurate geospatial alignment of integrity data. This paper/presentation describes Enbridge’s experience with development of custom software (Integrated Spatial Analysis System – ISAS) including critical learnings around a.) Data alignment efforts and b.) Significant efforts involved in development of an accurate pipe centreline. The paper/presentation will also describe co-incident data management programs that link to ISAS. This includes enhanced database functionality for excavation data and development of software to enable electronic transfer of data to this database. These tools were built to enable rapid transfer of field data and “real time” tool validation through automated unity plots of tool defect data vs. that measured in the field.


Author(s):  
Martin Zaleski ◽  
Tom Greaves ◽  
Jan Bracic

The Canadian Standards Association’s Publication Z662-07, Annex N provides guidelines for pipeline integrity management programs. Government agencies that regulate pipelines in Alberta, British Columbia and other Canadian jurisdictions are increasingly using Annex N as the standard to which pipeline operators are held. This paper describes the experience of Pembina Pipeline Corporation (Pembina) in implementing a geohazards management program to fulfill components of Annex N. Central to Pembina’s program is a ground-based inspection program that feeds a geohazards database designed to store geotechnical and hydrotechnical site information and provide relative rankings of geohazard sites across the pipeline network. This geohazard management program fulfills several aspects of the Annex, particularly: record keeping; hazard identification and assessment; risk assessment and reduction; program planning; inspections and monitoring; and mitigation. Pembina’s experience in growing their geohazard inventory from 65 known sites to over 1300 systematically inspected and catalogued sites in a span of approximately two years is discussed. Also presented are methods by which consultants and Pembina personnel contribute to the geohazard inspection program and geohazard inventory, and how the ground inspection observations trigger follow-up inspections, monitoring and mitigation activities.


Author(s):  
S. Ruik Beyhaut

To control the threats from external forces, pipeline owners and operators require detailed information about their pipeline infrastructure and the environment surrounding that infrastructure. The contribution from geographic data is recognized as an increasingly important part of a complete integrity management program, particularly for the identification of geohazards. This is because geohazards are generally characterized by high spatial variability, are complex and difficult to quantify but may result in catastrophic failure of pipelines. In recent years we have seen widespread technological development surrounding the processes to capture information in order to deliver quantitative inputs for pipeline engineers, risk & geotechnical experts. International codes & best practices (e.g. AS 2885.1-2012) state that “Environmental impact assessment is not simply a vehicle to obtain regulatory approval, it is a critical element of the planning for design, construction and operation of the pipeline.” Furthermore, geohazards frequently develop during the service life of pipelines. Consequently, regulators recommend that assessments are conducted on an ongoing basis to identify all potential threats and implement mitigation measures. A process has been developed to create efficient and economical solutions for monitoring and assessing the significance of pipeline bending strain and whether actual movement has taken place. This process can make use of a variety of inputs including slope gradient, climate, groundwater conditions, slope instability, seismic intensity, and environmental impacts, and can provide important information in the determination of potential mitigations. This paper will review the benefits which can be gained from the implementation of integrated approaches to inform geohazard management.


Author(s):  
Ricky Thethi ◽  
Pei An

Deepwater risers are complex dynamic structures subject to extreme events in the Gulf of Mexico such as hurricanes and high currents. The offshore industry in the Gulf of Mexico is aggressively moving into the ultra deep and developing challenging fields with high pressure, high temperature conditions and corrosive production fluids. Floating production vessels such as semi-submersibles and FPSOs are being selected for these developments and these vessels typically have higher motions than Spars and TLPs used to date. Consequently, the risers become increasingly challenging to engineer and design margins can be significantly reduced. Uncertainties in design basis data, actual response in the field, and component degradation with time can be effectively managed by monitoring the performance of the riser system in service through direct structural monitoring on the riser in conjunction with vessel and environmental monitoring. Such a system forms an integral part of the integrity management program and can allow anomalies to be identified ahead of time to prevent catastrophic riser failure. This paper puts forward the benefits of riser performance monitoring and describes system based architectures for various development scenarios utilizing dry tree vertical top tensioned risers, wet trees with SCRs, and wet trees with free-standing risers.