Applicability of lean principles and practices in industrialized housing production

2008 ◽  
Vol 26 (10) ◽  
pp. 1091-1100 ◽  
Author(s):  
Matilda Höök ◽  
Lars Stehn
2021 ◽  
Vol 128 ◽  
pp. 103437
Author(s):  
Xiao Li ◽  
Liupengfei Wu ◽  
Rui Zhao ◽  
Weisheng Lu ◽  
Fan Xue

2021 ◽  
Vol 10 (1) ◽  
pp. e001197
Author(s):  
Ziad Alzahrani

BackgroundWe focused on a busy Adult Oncology Department having over 130 staff members, with around 70 of them being physicians with different levels of specialties. A multidisciplinary committee was formed in the department, consisting of physicians, nurses, pharmacists, a medication safety representative and a quality specialist to look after all reported incidents.Local problemThe department staff at the institution in question in this study expressed their concern about the surging number of reported incidents, delays in closing reports within the set timeframe, ambiguity of individuals’ roles at the committee level and errors in using the safety reporting system (SRS). Accordingly, this study focused on the development of a visual aid through the creation of a functional process map to help clarify team roles and stipulate the steps for adverse event closure.MethodsThe Sort, Set-in order, Shine, Standardise, Sustain and Safety and visual management lean principles, as well as the eight lean wastes—Transportation, Inventory, Motion, Waiting, Overprocessing, Overproduction, Defect and Staff underutilisation—were introduced in early May 2016 and used during SRS committee meetings over 3 years.InterventionThe indicators used were the average number of days for both medication and non-medication incidents from the day of reporting until the closure. The extent that the limit was exceeded was compared.ResultsThe average number of days until closure showed a reduction from 67 to 37 and 134 to 61 between Periods I (2016) and III (2018) for medication and non-medication incidents, respectively.ConclusionsThe developed process map was a useful communication tool. It helped to sort process activities, team roles and streamline the process. It brought the average number of days until closure within the acceptable 45-day limit for medication incidents. Thus, using visual aids in the working environment is helpful in improving communication among the workers.


2021 ◽  
Vol 51 ◽  
pp. 28-37
Author(s):  
Maria Angeles Tebar Betegon ◽  
Víctor Baladrón González ◽  
Natalia Bejarano Ramírez ◽  
Alejandro Martínez Arce ◽  
Juan Rodríguez De Guzmán ◽  
...  

2019 ◽  
Vol 19 (4) ◽  
pp. 23-30
Author(s):  
Jyldyzbek Jakshylykov ◽  

The Kyrgyz higher education institutions are failing to meet the newly emerging challenges. Despite the efforts and jobs done, the effective results are not being achieved in the education and research sphere as desired. In this article, we give the examples of “Lean principles” implementations around the world as one of the solutions to the above mentioned challenge. In the last part of the article, we discuss a status quo of these principles in Kyrgyz higher education system.


2018 ◽  
Vol 195 ◽  
pp. 1533-1545 ◽  
Author(s):  
Clyde Zhengdao Li ◽  
Jingke Hong ◽  
Cheng Fan ◽  
Xiaoxiao Xu ◽  
Geoffrey Qiping Shen

Sign in / Sign up

Export Citation Format

Share Document