Study on the rapid construction method of large section vertical well in thick alluvium

Author(s):  
Jiankun Xu ◽  
Xuelong Li ◽  
Xinzeng Xu ◽  
Zan Li ◽  
Baolin Li ◽  
...  
2020 ◽  
Vol 2020 ◽  
pp. 1-13
Author(s):  
Zhi Lin ◽  
Xiang Chen ◽  
Hongyun Yang ◽  
Chongguo Cheng ◽  
Huasong Wang ◽  
...  

The construction of urban underground cross-interchange transfer subway stations often encounters the difficulties of shallow-buried, different surrounding rock, large spans and heights, congested road traffic, and surrounding buildings sensitive to the construction sequence. Therefore, there is a need for an underground project that controls the stability of underground space and ground subsidence. Based on the construction difficulties of a certain station (the maximum excavation area over 760 m2), this paper conducts a comprehensive selection design of the structure, construction mechanics response, and control technology of this type of interchange station structure and construction excavation. First of all, based on the design experience of large-scale underground transfer transportation engineering and taking full consideration of the stratum conditions, an “arch-wall” cross transfer structure method is proposed. The refined numerical analysis shows that the structure can fully utilize the stratum conditions to reduce the ground surface settlement. Then, in view of the stability of surrounding rock during the construction of a large section, based on the traditional large section excavation method, a construction method of “cross rock beam + heading method” was proposed. In order to verify the effect of the construction method, the three-dimensional detailed numerical model was used to simulate the construction conditions, and the mechanical response characteristics and displacement changes of surrounding rock under each excavation step are explored. Simultaneous interpreting with the traditional large section excavation method, the results show that the new method has advantages in controlling the stability of the surrounding rock. Meanwhile, in order to ensure the safe construction of the project, the self-developed multifunctional engineering test system for traffic tunnels is used to carry out a large-scale physical model experiment to simulate the entire process of the “arch-wall” cross transfer structure construction response characteristics. By analyzing the data of measuring points, the results show that the structure form and the excavation method cause the ground surface settlement, stress, and structural forces meet the requirements for safe construction. Finally, the station can be safely constructed under the new structure form and construction method. Therefore, the structure form and method proposed in this paper can be adapted to the large-scale underground structure under construction in complex environments.


2019 ◽  
Vol 136 ◽  
pp. 04024
Author(s):  
Yuwen Wang ◽  
Xiang Yang Cui ◽  
Hongyan Guo ◽  
Ke Li

Taking several tunnels under construction of a highway as the research object, the ultimate displacement of four buried depth sections of 0-50, 50-100, 100-300, 300-500 m in the surrounding rock of grade III, IV and V is numerically simulated by three-step and seven-step excavation method, middle-wall method, cross-middle-wall method and double-side-wall guide pit method for initial support of large-section highway tunnels. Through analysis, the deformation law of tunnel surrounding rock is obtained: under the same buried depth, the displacement ultimate displacement of the two-sided guide pit method and the cross-middle-wall method is the largest, the middle-wall method is the second, and the three-step seven-step excavation method is the smallest. Through the analysis and collation of the measured data obtained by monitoring and measurement of each construction method in the construction site, the surrounding rock deformation datum values of large-span and large-section tunnel under each construction method are obtained.


2022 ◽  
Vol 355 ◽  
pp. 02029
Author(s):  
Yimin Du ◽  
Lingling Shi ◽  
Xiang Zhai ◽  
Hanqing Gong ◽  
Zhijing Zhang

The actual product assembly process mainly relies on manual assembly by workers, and the personal experience of workers is difficult to effectively reuse. Ontology as a knowledge management and expression tool is gradually applied in the field of assembly. However, the manual construction of the ontology is time-consuming and labor-intensive, and the automatic construction of the ontology requires a large number of corpora for training, both of which are difficult to obtain a good assembly case ontology. This paper proposes a method in which automatically extracts relevant knowledge from case assembly process files to generates case database and integrates ontology framework of assembly domain to construct ontology. It shows that the accuracy can be guaranteed on the basis of the rapid construction of case ontology. The feasibility of this method is proved by a practical case.


Sign in / Sign up

Export Citation Format

Share Document