Selection of construction method for large section soil tunnel and analysis of monitoring results during construction period

Author(s):  
Ya Li Xu ◽  
Zeng Rong Liu ◽  
Quan Zhang
2021 ◽  
Author(s):  
Dewu Li ◽  
Xiaotian Lei ◽  
Guowei Zhang ◽  
Mingxing Cao

Abstract It is of great significance to improve the mechanization level and construction quality of tunnel construction. At present, large cross-section tunnels are emerging in China. The construction method based on manual work and supplemented by a machinery has long construction period, high labor intensity, and structural quality that cannot be guaranteed. To address those issues, this paper proposes the construction method of bolting-grouting integrated operation for an unmanned arch erection to achieve the rapid and safe construction of large section tunnels and reducing the amount of manual work. This paper mainly introduces the bolting-grouting integrated operation trolley, which can achieve the automatic installation of steel arch, the construction of locking anchor pipe, and shotcrete. Besides, this paper designs a new type of steel arch and an alternative way of longitudinal connecting reinforcement of steel arch. Moreover, with the field test and optimization adjustment of the Xinwushaoling tunnel, it is found that the construction method of bolting-grouting integrated operation for unmanned arch erection can overcome some disadvantages of traditional construction methods.


2011 ◽  
Vol 255-260 ◽  
pp. 161-165
Author(s):  
Xiang Rong Zhang ◽  
Lu Li

Gypsum board as the basis, combined with double-sided adhesive sponge and neutral silicone adhesive connection, this method using gypsum board as the primary fire to A-level, affordable. With high construction speed, short construction period, it can save money and meet the quality requirements and bring greater economic benefits to investors. Therefore, the gypsum board primary aluminum plate construction method paste will be introduced to more and more application.


2021 ◽  
Vol 2101 (1) ◽  
pp. 012011
Author(s):  
Wenfang Cai ◽  
Songyuan Lu ◽  
Zhengfeng Wu ◽  
Guangyao Ying ◽  
Wenjian Wu

Abstract Abstract.This paper aims at the high efficiency of field balancing for turbo-generator with large capacity currently, and introduces the strategies and key techniques of the rotor system balancing with practical cases of power plant in field. The acquisition, analysis and former processing of the original vibration data for balance calculation are included. Furthermore, they involve complete measuring points and conditions, accurate judgment for the types of unbalance exciting force and selection of stable vibration data, all these could reduce the blindness of balancing effectively. The strategies and techniques also contain the determination for axial plane of unbalance by the modal method, then the optimal steps and the plane of adding weight are chosen during the implementation of balancing. Besides, this paper also introduces the analysis and selection of influence coefficients and the phase of trial weight, these can help determine the final correction weight accurately in order to guarantee the balancing process prompt and efficient. Meanwhile, the restriction of practical location for adding weight and construction period of maintenance and production for the units should be considered during the high efficiency balancing in field. These strategies and techniques of high efficiency balancing have practical application value in promoting the technology of field balancing for turbo- generator units with large capacity.


2013 ◽  
Vol 788 ◽  
pp. 534-537 ◽  
Author(s):  
Zhen Xing Li

Different construction schemes in the same construction method have great influence on structure mechanics of grid structure, which is very important for the security and stability in large-span space grid structure. So in order to guarantee the quality and safety of the structure during construction, the selection of construction scheme is particularly important. In this paper, the following practical engineering is adopted to discuss characteristics of different construction schemes in large-span space grid structure and provide a reference for what construction scheme should be selected in the installation of similar space grid structures.


2011 ◽  
Vol 90-93 ◽  
pp. 1168-1172
Author(s):  
Ying Lei Zhu

A new type of cable-stayed bridge, single pylon cable-stayed bridge without backstays is used in the Zhenshui Road Bridge in Xinmi City, China’s Henan Province, which adopts PC box girder with corrugated steel webs. It has many advantages such as light girder deadweight, low pylon height and avoiding webs longitudinal cracks. This novel bridge is adopted firstly in China. Cast-in-place method with bracket is used in the construction of the bridge’s inclined pylon because of its complex construction technology and tight construction period. In this paper, interests are focus on the scheme comparison and selection of bracket construction, the establishment of bracket’s computational model and the result of numeric analysis etc. The chief aim of this investigation was provides useful reference and enlightenment to similar bridge types.


2014 ◽  
Vol 522-524 ◽  
pp. 1641-1644
Author(s):  
Chun Yan Yang ◽  
Shu Min

With rich experience of sustainable construction, Sichuan vernacular architectures are gradually formed in a long Construction period, during which the ancient adapt to natural environment and social conditioning. This thesis summarizes some ecological characteristics of Sichuan vernacular architectures and refines some sustainable characteristics of architectures construction. By using an empirical approach, the sustainable measures of vernacular architectures are preliminarily summarized. The sustainable experience concerning Sichuan vernacular architectures, such as layout, lightening, ventilation, dehumidification, damp-proof and materials selection of roof, are expected to bring some inspirations to modern community construction.


2020 ◽  
Vol 2020 ◽  
pp. 1-13
Author(s):  
Zhi Lin ◽  
Xiang Chen ◽  
Hongyun Yang ◽  
Chongguo Cheng ◽  
Huasong Wang ◽  
...  

The construction of urban underground cross-interchange transfer subway stations often encounters the difficulties of shallow-buried, different surrounding rock, large spans and heights, congested road traffic, and surrounding buildings sensitive to the construction sequence. Therefore, there is a need for an underground project that controls the stability of underground space and ground subsidence. Based on the construction difficulties of a certain station (the maximum excavation area over 760 m2), this paper conducts a comprehensive selection design of the structure, construction mechanics response, and control technology of this type of interchange station structure and construction excavation. First of all, based on the design experience of large-scale underground transfer transportation engineering and taking full consideration of the stratum conditions, an “arch-wall” cross transfer structure method is proposed. The refined numerical analysis shows that the structure can fully utilize the stratum conditions to reduce the ground surface settlement. Then, in view of the stability of surrounding rock during the construction of a large section, based on the traditional large section excavation method, a construction method of “cross rock beam + heading method” was proposed. In order to verify the effect of the construction method, the three-dimensional detailed numerical model was used to simulate the construction conditions, and the mechanical response characteristics and displacement changes of surrounding rock under each excavation step are explored. Simultaneous interpreting with the traditional large section excavation method, the results show that the new method has advantages in controlling the stability of the surrounding rock. Meanwhile, in order to ensure the safe construction of the project, the self-developed multifunctional engineering test system for traffic tunnels is used to carry out a large-scale physical model experiment to simulate the entire process of the “arch-wall” cross transfer structure construction response characteristics. By analyzing the data of measuring points, the results show that the structure form and the excavation method cause the ground surface settlement, stress, and structural forces meet the requirements for safe construction. Finally, the station can be safely constructed under the new structure form and construction method. Therefore, the structure form and method proposed in this paper can be adapted to the large-scale underground structure under construction in complex environments.


Sign in / Sign up

Export Citation Format

Share Document