scholarly journals Key technology of overlapping tunnel construction with earth pressure balance shield method in rheological strata

2021 ◽  
Vol 2011 (1) ◽  
pp. 012024
Author(s):  
Qingru Yu ◽  
Shihong Zhai ◽  
Wen Liu ◽  
Tianrui Liu ◽  
Hu Song
2011 ◽  
Vol 255-260 ◽  
pp. 3282-3286
Author(s):  
Xiu Shan Wang ◽  
Li Wang ◽  
Xiao Jun Ding

The method to analysis the strength of planetary trains’ carriers of EPB(earth pressure balance) shield machine is presented in this paper. The structure of the shield machine trains is analyzed and the 3-D solid model of the carrier is built with Pro/E. After the load on the carrier has been dealt with, the strength of carrier is calculated by means of finite element method. The results via ANSYS show that the max stress and strain on the carriers are increasing as the increasing load on it. The max stress is lying on the joint point of the carrier and planetary gear shaft because of the bending deformation of the shaft.


1998 ◽  
Vol 35 (1) ◽  
pp. 159-168 ◽  
Author(s):  
Chang-Yu Ou ◽  
Richard N Hwang ◽  
Wei-Jung Lai

This paper presents the surface settlement performance induced by the foamed type of earth pressure balance shield in contract CH218 of the Hsintien Line of the Taipei Rapid Transit System. The surface settlement characteristics caused by the single tunnel and by twin tunnels with reference to two sections spaced at 87 m are studied. Field observations indicate that the surface settlement trough due to the single tunnel can be represented by the normal distribution. The distance of the inflection point to the tunnel center and maximum surface settlement value are consistent with those found in the literature. The characteristics of the surface settlement trough are related to the type of the soil, particularly where the crown of the tunnel is located in a layered soil deposit. The ground surface settlement induced by twin tunnels was found to be larger than estimated using the principle of superposition.Key words: shield tunnelling, surface settlement, field observation.


2011 ◽  
Vol 378-379 ◽  
pp. 449-452
Author(s):  
Xue Gang Huang ◽  
Yu You Yang ◽  
Gui He Wang

A three-dimensional (3D) failure mechanism, based on the framework of the kinematical approach of limit analysis theory, is applied to calculate the face supporting pressure of a circular tunnel driven by the Earth Pressure Balance Shield (EPBS). The geometry of the mechanisms considered is composed of a sequence of truncated rigid cones. The numerical results obtained are presented.


2002 ◽  
Vol 39 (6) ◽  
pp. 1273-1287 ◽  
Author(s):  
Manuel Melis ◽  
Luis Medina ◽  
José M Rodríguez

The development of tunnelling projects under heavily populated cities has been rapidly increasing around the world during the last decades. Since tunnel construction can have disastrous effects on buildings, structures, and utilities near the excavation, construction methods have necessarily to provide maximum safety inside and outside the tunnel. To predict and correct dangerous ground movements due to the tunnelling works, the authors developed a numerical model to simulate the earth pressure balance (EPB) excavation procedure and injection to complement some deficiencies found in previous analytical or empirical subsidence estimating procedures. This model takes into account the full excavation sequence and has been validated by a large amount of monitoring data from the previous Madrid Metro extension. In the present paper, several predictive methods are used to predict the ground movements generated during a new Madrid Metro extension project consisting of 48 km of tunnel (1999–2003). At the end of the works the results will be compared with data from monitored sections placed in all five cities linked by the extension. Conclusions about the applicability and accuracy of the methods will be established with the aim of helping researchers and engineers in their future projects.Key words: ground movements, monitoring, numerical modelling and analysis, settlement, tunnels.


2012 ◽  
Vol 490-495 ◽  
pp. 2748-2751
Author(s):  
Li Zhi Wen ◽  
Zhi Wei Guan ◽  
Chen Fu Liu ◽  
Xi Tong Zhang

The method to analysis the strength of planetary trains’ carriers of EPB(earth pressure balance) shield machine is presented in this paper. The structure of the shield machine trains is analyzed and the 3-D solid model of the carrier is built with Pro/E. After the load on the carrier has been dealt with, the strength of carrier is calculated by means of finite element method. The results via ANSYS show that the max stress and strain on the carriers are increasing as the increasing load on it. The max stress is lying on the joint point of the carrier and planetary gear shaft because of the bending deformation of the shaft


Sign in / Sign up

Export Citation Format

Share Document