scholarly journals Energy Optimization Modeling of Geothermal Power Plant (Case Study: Darajat Geothermal Field Unit III)

Author(s):  
R H M Sinaga ◽  
P S Darmanto
2018 ◽  
Vol 117 ◽  
pp. 157-165 ◽  
Author(s):  
Lukman Adi Prananto ◽  
Firman Bagja Juangsa ◽  
Riza Mochamad Iqbal ◽  
Muhammad Aziz ◽  
Tubagus Ahmad Fauzi Soelaiman

2020 ◽  
Author(s):  
Paolo Basile ◽  
Roberto Brogi ◽  
Favaro Lorenzo ◽  
Tiziana Mazzoni

<p><span><span>Social consensus is a </span><span>condition precedent for any intervention having an impact on the territory, such as geothermal power plants. Therefore, private investors studied and proposed innovative solution for the exploitation of the medium enthalpy geothermal resource, with “zero emissions” in atmosphere, with the target of minimizing its environmental impact. “Montenero” project, developed by GESTO Italia, complies with this precondition.</span></span></p><p><span><span>The area covered b</span><span>y the exploration and exploitation permit is located on the northern edge of the great geothermal anomaly of Mt. Amiata (Tuscany), about 10 km north of the geothermal field of Bagnore, included in the homonymous Concession of Enel Green Power.</span></span></p><p><span><span>The geological - structural setting of the area around the inactive volc</span><span>ano of Mt. Amiata has been characterized by researches for the geothermal field of Bagnore, carried out by Enel Green Power over the years. The geothermal reservoir is present in the limestone and evaporitic rocks of the “Falda Toscana”, below which stands the Metamorphic Basement, as testified by the wells of geothermal field of Bagnore. The foreseen reservoir temperature at the target depth of 1.800 m is 140 °C, with an incondensable gas content of 1,8% by weight.</span></span></p><p><span><span>The project was presented to the authorities in 2013 and it is </span><span>now undergoing exploitation authorization and features the construction of a 5 MW ORC (Organic Ranking Circle) binary power plant. The plant is fed by three production wells for a total mass flow rate of 700 t/h. The geothermal fluid is pumped by three ESPs (Electrical Submersible Pump) keeping the geothermal fluid in liquid state from the extraction through the heat exchangers to its final reinjection three wells.</span></span></p><p><span><span>The reinjection temperature is 70 °C and the circuit pressure is maintained above the </span><span>incondensable gas bubble pressure, i.e. 40 bar, condition which prevents also the formation of calcium carbonate scaling. The confinement of the geothermal fluid in a “closed loop system” is an important advantage from the environmental point of view: possible pollutants presented inside the geothermal fluid are not released into the environment and are directly reinjected in geothermal reservoir.</span></span></p><p><span><span>The </span><span>environmental authorization procedure (obtained) has taken into account all the environmental aspects concerning the natural matrices (air, water, ground, ...) potentially affected by the activities needed for the development, construction and operation of “Montenero” ORC geothermal power plant. A numerical modeling was designed and applied in order to estimate the effect of the cultivation activity and to assess the reinjection overpressure (seismic effect evaluation). The project also follows the “best practices” implemented in Italy by the “Guidelines for the usage of medium and high enthalpy geothermal resources” prepared in cooperation between the Ministry of Economic Development and the Ministry of the Environment.</span></span></p>


2017 ◽  
Vol 10 ◽  
pp. 292-301 ◽  
Author(s):  
Bayu Rudiyanto ◽  
IbnuAtho Illah ◽  
Nugroho Agung Pambudi ◽  
Chin-Chi Cheng ◽  
Reza Adiprana ◽  
...  

Tatapani Geothermal field is one of the most promising low-enthalpy geothermal fields in central India, located on Son-Narmada lineament in the state of Chhattisgarh, India. The Tatapani geothermal field geological, geo-chemical & reservoir data has been compiled and analysed for evaluating true power potential & better understanding of the field. The low enthalpy geothermal reservoirs can be utilized for power production using Organic Rankine Cycle (ORC) or binary power cycle. Based on previous research works done, the Tatapani geothermal field has been found to be very prospective and has got huge potential for power generation. The binary power cycle has been studied in detail along with thermodynamic concepts. In addition, similar low enthalpy geothermal power plants (conceptual & existing both) have been thoroughly studied in order to understand the concepts and methodology to perform technical feasibility based on thermodynamic and exergy analysis. The literature review covers the previous works done on Tatapani geothermal field including works on other geothermal fields in India along with previous research works for Thermodynamic & Exergy Analysis carried-out for binary geothermal power plants across the world for similar low enthalpy prospects. The methods of performing thermodynamic and exergy analysis for a potential geothermal power plant has been studied and compared. Exergy analysis highlights the areas of primary exergy destruction at various plant components and can be illustrated in the form of exergy flow diagram. The loss of exergy indicates the potential reasons for the inefficiencies within a process and exergic efficiency as conversion of input heat energy from the brine in to useful work output. The exergic efficiencies can be calculated for each component along with exergy destruction. The detailed study has been conducted in order to gather the knowledge regarding conducting the feasibility of setting up binary geothermal power plant at Tatapani from technical point of view using thermodynamic concepts.


Author(s):  
Kevin R. Anderson ◽  
Wael Yassine

Abstract This paper presents modeling of the Puna Geothermal Venture as a case study in understanding how the technology of geothermal can by successfully implemented. The paper presents a review of the Puna Geothermal Venture specifications, followed by simulation results carried out using NREL SAM and RETSCREEN analysis tools in order to quantify the pertinent metrics associated with the geothermal powerplant by retrofitting its current capacity of 30 MW to 60 MW. The paper closes with a review of current state-of-the art H2S abatement strategies for geothermal power plants, and presents an outline of how these technologies can be implemented at the Puna Geothermal Venture.


2014 ◽  
Vol 493 ◽  
pp. 56-61
Author(s):  
Reza Adiprana ◽  
Danu Sito Purnomo ◽  
Iwan Setiono

UNIT-1 KAMOJANG geothermal power plant marked the new era of renewable energy in Indonesia. With its built capacity of 30 MWe, it constantly supply electricity to Java-Bali grid for more than 30 years now.Over those period, Unit-1 has given its best performance with highest achievement on Capacity Factor (CF) and Equivalent Availability Factor (EAF).High performance geothermal power plant involves the integration not only from the point of view of power generation, but also the optimation of geothermal potention in the area. Kamojang geothermal field, which is considered as one among five steam dominated reservoir in the world produces 200 MWe of the electricity nowadays. In order to maintain this production rate, some technical consideration must be made.Towards sustainable power generation of geothermal power, some assessment has been made to turbine, generator and cooling tower to ensure its current condition. Basically what it called remaining life assessment gives a rough picture of how long the equipment will run through in its operational condition.Based on those assessment, additional 20.900 hours is given to the turbine with the existing operating conditions. On the other hand, cooling tower infrastucture test and simulation delivers operation period for another 25 years.


Sign in / Sign up

Export Citation Format

Share Document