scholarly journals Estimate of rock mass stability in surface–borehole mining of high-grade iron ore

Author(s):  
AS Sammal ◽  
SV Antsiferov ◽  
PV Deev ◽  
SV Sergeev
2016 ◽  
pp. 3-5
Author(s):  
A. D. Sashurin ◽  
◽  
A. A. Panzhin ◽  
T. F. Kharisov ◽  
D. Yu. Knyazev ◽  
...  

2021 ◽  
Vol 13 (2) ◽  
pp. 834
Author(s):  
Oleg Bazaluk ◽  
Mykhailo Petlovanyi ◽  
Vasyl Lozynskyi ◽  
Serhii Zubko ◽  
Kateryna Sai ◽  
...  

The present paper considers aspects of underground iron ore mining in Ukraine, in particular the level of mine production and reserves of basic ore fields. It analyzes and generalizes the practice of using cemented rockfill under difficult mining and hydrogeological conditions of the Pivdenno-Bilozerske high-grade iron ore field. The Belozersky iron ore district is the only one in Ukraine that, without any technological cycle of beneficiation, can provide both domestic and foreign consumers with high-quality raw iron ore as required by world markets. The PJSC Zaporizhzhia iron ore plant extracts iron ore from the Pivdenno-Bilozerske field with an iron content of more than 60% using the low-waste, environmentally friendly technology of backfilling the mined-out area with a hardening mixture. The peculiarities of the technology for steep deposit mining and the main processes of backfilling operations in terms of preparation, transportation, and construction of the backfill mass with its stability assessment are explained in detail in this paper. As a result of using cemented rockfill, rock mass stability is provided, a considerable part of industrial waste is disposed of in the mined-out area, and the earth’s surface subsidence within the area is prevented (in comparison with mining enterprises in other fields).


2002 ◽  
pp. 253-262 ◽  
Author(s):  
Kunifumi TAKEUCHI ◽  
Tomoyuki SHIMURA ◽  
Shinichi AKUTAGAWA ◽  
Shunsuke SAKURAI

Sign in / Sign up

Export Citation Format

Share Document