Integrated project delivery implementation framework for water and wastewater treatment plant projects

2019 ◽  
Vol 27 (3) ◽  
pp. 609-633 ◽  
Author(s):  
Elie Georges Andary ◽  
Caesar Abi Shdid ◽  
Arindam Chowdhury ◽  
Irtishad Ahmad

Purpose The public nature of water and wastewater construction capital projects has rendered design-bid-build (DBB) as the delivery method of choice for such projects over the past years. Shortcomings inherent to DBB have had a negative effect on the key performance indicators (KPIs) of these projects. Numerous studies have been published about the benefits offered by integrated project delivery (IPD) in improving the delivery of DBB projects. Links correlating IPD principles to improvements in KPIs of DBB construction projects have not been established scientifically, thus leaving owners with no guidance on which IPD principle(s) to implement in order to improve a particular project KPI. The paper aims to discuss this issue. Design/methodology/approach Actual data were collected from 43 water and wastewater construction projects – including two control projects with full implementation of selective IPD principles – and used to compute major projects KPIs. Regression analysis and a focus group are then utilized to determine the effect of each implemented IPD principle on various project KPIs. Findings Implementation of open communication was found to have a significant effect on reducing project cost overrun, and the co-location of teams significantly reduced the time to respond to RFIs. Collaborative decision making significantly reduced the cost of field rework. Other IPD principles showed less-significant effects on project KPIs and were concluded to be ineffective at improving the projects’ performance. Practical implications An implementation framework is developed that can guide utility owners on which IPD principle(s) to implement in order to improve specific project KPIs. Originality/value This study demonstrates that not all IPD principles will result in performance improvement of a project. A selective and cost-effective implementation of certain IPD principle will have to be based on the nature of the project and the particular KPIs targeted for improvement.

2019 ◽  
Vol 9 (3) ◽  
pp. 334-347 ◽  
Author(s):  
Farook Hamzeh ◽  
Farid Rached ◽  
Youssef Hraoui ◽  
Antoine Joseph Karam ◽  
Zeina Malaeb ◽  
...  

Purpose This study investigates the extent to which the popular forms of contract adopted in the Middle East (ME) address collaboration. The purpose of this paper is to assess how collaboration features weaved into the construct of integrated project delivery (IPD) may impact projects in the ME. In this context, the study identifies features in IPD and existing delivery methods that may enable or inhibit collaboration and evaluates their impact on project success from the perspective of various contract managers in the ME. Design/methodology/approach The study employs structured face-to-face interviews with 41 construction industry practitioners in top contract management positions in the ME to evaluate the significance of collaboration features in IPD. Data collected from the structured interviews/surveys were analyzed using statistical tools in R and Excel. Findings Results reveal that while experts recognize the collaboration benefits which IPD features may contribute to a project, the current contractual environment of the industry does not optimally encompass these features. The current status of project delivery does not favor IPD implementation nor does it enable its collaborative features. Originality/value This study contributes to the growing international body of knowledge addressing the application of collaborative contracts in construction projects, and it is innovative in evaluating collaboration features within IPD and exiting project deliveries in the ME.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Ayman Ahmed Ezzat Othman ◽  
Lamis Yasser Wagih Youssef

Purpose This paper aims to develop a framework for implementing the integrated project delivery (IPD) approach during the design process in architecture design firms (ADFs) in Egypt. Design/methodology/approach A research methodology consists of literature review, case studies and survey questionnaire was designed to achieve the abovementioned aim. First, literature review was used to identify and categorise the challenges of implementing IPD during the design process. Second, four case studies were analysed to investigate the values delivered to the client or missed due to the use of IPD or traditional procurement approaches, respectively. Finally, a survey questionnaire was carried out with a representative sample of ADFs in Egypt to investigate their perception towards the challenges of IPD implementation in Egypt. Based on the results of the above, the research developed a framework to facilitate the implementation of IPD in ADFs in Egypt. Findings Through literature review, the research identified 30 challenges that hamper the implementation of IPD in ADFs. These challenges were categorised due to their nature into five groups, namely, integration, cooperation, commitment and trust challenges, knowledge, experience skills and decision-making challenges, cultural challenges, legal and contractual challenges and technical and financial challenges. Results of data analysis showed that “poor communication and spirit of collaboration between project stakeholders” was ranked the highest influential challenge as IPD is based on collaboration and trust between project participants. In addition, “lack of training and motivation in investing for using IPD” was ranked the lowest influential challenge due to the poor attention paid to training in the construction industry. Moreover, despite the benefits of IPD implementations in many countries worldwide, it is not implemented in the Egyptian context. This necessitated taking action towards developing a framework to facilitate IPD implementation in ADFs in Egypt. Research limitations/implications The research focussed on ADFs in Egypt. Practical implications Adopting the proposed framework developed through this research will help implementing IPD during the design process in ADFs. Originality/value The research identified, categorised and analysed the challenges that obstruct the implementation of IPD in ADFs. The research tackled a topic that received scant attention in construction literature in the Middle East generally and Egypt in particular. In addition, this paper presented a framework to facilitate the implementation of IPD during the design process, which represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.


2019 ◽  
Vol 27 (1) ◽  
pp. 186-204 ◽  
Author(s):  
Serdar Durdyev ◽  
M. Reza Hosseini ◽  
Igor Martek ◽  
Syuhaida Ismail ◽  
Mehrdad Arashpour

Purpose The purpose of this paper is to quantify the barriers to the use of integrated project delivery (IPD), as assessed by 115 construction professionals in Malaysia. Design/methodology/approach Barriers recording highest citation amongst researchers worldwide were collated in the form of a conceptual model. This model was validated via a partial least squares structural equation modelling technique. Findings Findings advance the body of knowledge on IPD by providing original insights into the nature of key barriers, quantifying the relative importance of each barrier. Research limitations/implications Despite the above-mentioned contributions, and before drawing any conclusion, it is prudent to acknowledge limitations, particularly the chosen research approach in focusing on the Malaysian context. Therefore, caution must be exercised in direct application of findings to other contexts; research findings should be seen through the lens of moderatum generalisations (see Payne and Williams, 2005). Practical implications Apart from contributions to the body of knowledge, for the world of practice, conditions impacting a transition to IPD are discussed, with a recommendation for change management through a tested mechanism like the European Corporate Sustainability Framework. Originality/value Being the first empirical study undertaken to quantify the relationship among the identified barriers and IPD, the present study contributes to the field by addressing the gap in IPD research in Malaysia, as an exemplar of a developing country; it creates knowledge to inform further improvements in project performance through facilitating IPD use. The study also offers insight to construction stakeholders in other developing countries for tackling issues that hinder the adoption of an IPD approach, and it also points to major barriers such that resources for tackling barriers may be allocated properly.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Eymen Cagatay Bilge

PurposeTechnological developments are having an impact on the construction sector and are creating a paradigm shift in project delivery methods. Traditional project delivery systems are inadequate in current project development processes. A more integrated project delivery system and the establishment of contractual and financial structures are needed. The purpose of this study is to incorporate integrated project delivery and real estate certificate concepts and propose a model for real estate development.Design/methodology/approachAs a methodology, both integrated project delivery and real estate certificate concepts are reviewed individually, and a case to real estate certificate in Turkey is examined.FindingsA real estate certificate is a new method for financing the development process. The system covers the financial dimension of the integrated project delivery system. When these two concepts are combined, they provide an alternative to the real estate development process.Research limitations/implicationsThis study is a preliminary study and lays the foundation for future studies.Practical implicationsIn theory, both concepts have many advantages, in practice, it is essential to create the necessary legal basis for these advantages to be valid. As this process requires significant planning and contract management, the proposed model must be properly designed at the start of the project.Originality/valueThis study proposes a new model for real estate development by combining integrated project delivery and real estate certificate concepts.


2017 ◽  
Vol 23 (6) ◽  
pp. 712-726 ◽  
Author(s):  
Qianqian JU ◽  
Lieyun DING ◽  
Miroslaw J. SKIBNIEWSKI

The supply chains of complex construction projects are characterized by multi-disciplinary participants, adversarial short-term relationships and fragmentations in project delivery procedures. Multi-disciplinary participants tend to make deci­sions on project activities based on their own objectives and value systems independently with little regard of holistic project performance. The lack of common values results in a limited understanding of how behaviors of one discipline impact on the related disciplines. This has led to tons of interface conflicts which ultimately affect project effectiveness. This paper investi­gates this problem by discussing Interface Value for the core players to understand the value-driven behaviors on the boundaries among owner and multiple prime contractors in complex construction projects. Two types of interface conflicts are recognized and defined. Value Optimization Strategy is proposed under status quo delivery methods by adjusting and reallocating interface responsibilities between related contractors. Improvements of procurement procedures are the key solutions to interface con­flicts. Prospects of integrated project delivery (IPD) in eliminating interface conflicts are also discussed. The paper concludes that Value Optimization Strategy and IPD-based approach are expected to eliminate interface conflicts of complex construction projects, integrate the complex supply chain and lower the potential risks for project delivery delay and cost overrun.


Author(s):  
Rita Awwad ◽  
Stephanie Atallah ◽  
Carol Menassa

The high cost incurred by the resolution of conflicts is largely affected by the existing adversarial nature of the construction industry along with the use of non-efficient dispute resolution methods in construction projects. This paper studies opinion dynamics in the negotiation of construction disputes while trying to understand the behavior and extremism of each contractual party. The developed model uses an agent-based approach to show how each agent’s attitude can influence the negotiation process when solving a dispute. It can also be used to highlight the importance of alternative dispute resolution (ADR) methods and the use of a mediator in helping parties initiate negotiation and decrease the number of negotiation cycles needed to converge. The results showed that negotiation is not only affected by the attitude and character of the agents involved but it is also influenced by the delivery method of the project and the level of intensity of each agent. It was found that when the project is delivered through an Integrated Project Delivery (IPD) method, parties are more flexible and cooperative and will reach agreement within few negotiation cycles.


2017 ◽  
Vol 17 (1) ◽  
pp. 45-49 ◽  
Author(s):  
Steve Rowlinson

Purpose This paper aims to review the development of building information modelling (BIM) and integrated project delivery (IPD) in recent years and the process changes that BIM and IPD require. Design/methodology/approach A qualitative research methodology was applied which involved a comprehensive review of relevant literature leading to a better understanding of the history and development of BIM and IPD. A way forward is suggested for the future development of BIM and IPD. Findings The research revealed that the IPD approach is already ingrained within certain organisations and their supply chains. The issues of political will and business desire to change the existing procurement systems are examined. The need for fit with regional and national economic and cultural characteristics is a pre-requisite for successful change. Collaborative working, information exchange and trust only exist within the context of a trusted and reliable building information model that all can access, understand and manage. Originality/value This research pointed out that there is a need to overcome the institutional inertia that besets governments and their agencies and suggested that exemplar institutions and their projects are needed to lead the industry by integrating BIM into IPD through process change.


Facilities ◽  
2016 ◽  
Vol 34 (1/2) ◽  
pp. 85-100 ◽  
Author(s):  
Mikko Kantola ◽  
Arto Saari

Purpose – The paper aims to reveal the most functioning project delivery systems for nearly zero-energy building (nZEB) projects. The focus is set to reveal the qualities of the systems that support the nZEB goals and sustainability. Design/methodology/approach – Research method used in this paper is inductive reasoning. The reasoning is based on existing literature, and conclusions are drawn by combining pieces of that literature. Findings – The state-of-the-art heating, ventilation and air conditioning (HVAC) and insulation requirements of nZEB technology and the lack of experience in the industry regarding nZEB projects suggest that modern collaboration-based project delivery systems should be favoured. The authors found that the most suitable project delivery system for a standard nZEB project is the integrated project delivery (IPD), which binds the financial goals of the main parties together via a reimbursement solution: target pricing. The authors also found the construction management (CM) at-risk system a suitable solution, especially if it is modified by adding the tools utilised in the IPD approach, thereby making it an IPD lite system. Originality/value – The paper has value for the entire construction industry in Finland and European Union (EU). The owners and construction companies can use the findings in their development efforts towards nZEB construction. The EU 2020 nZEB degree makes all the findings concerning practicalities of nZEB projects valuable due to the lack of time and the lack of experience in the industry.


Sign in / Sign up

Export Citation Format

Share Document