CENTER Energy: A Secure Testbed Infrastructure Proposal for Electricity Power Grid

Author(s):  
Ibrahim Ozcelik ◽  
Murat Iskefiyeli ◽  
Musa Balta ◽  
Kevser Ovaz Akpinar ◽  
Firdevs Sevde Toker
Keyword(s):  
Author(s):  
Johan Andrés Vélez-Henao ◽  
Claudia María Garcia-Mazo

Electricity data is one of the key factors in life cycle assessment (LCA). There are two different approaches to model electricity and to apply average or marginal data in LCA studies. Marginal data is used in consequential whereas average data is considered in attributional studies. The aim of this study is to provide the long-term marginal technology for electricity power generation in Colombia until 2030. This technology is one capable of responding to small changes in demand on the market and is an important issue when assessing the environmental impacts of providing electricity. Colombia is a developing country with a national power grid, which historically has been dominated by Hydropower rather than fossil fuels. This particularity makes Colombian national power grid vulnerable to climatic variations; therefore, the country needs to introduce renewable resources into the power grid. This study uses consequential life cycle assessment and data from Colombian national plans for capacity changes in the power grid. The results show that whereas marginal electricity technology would most probably be Hydropower, Wind and Solar power are projected to reach more than 1% of the national power grid by 2030.


2009 ◽  
Author(s):  
David Close ◽  
Kari Babski-Reeves ◽  
Nick Younan ◽  
Noel Schulz

Author(s):  
Pham Thi Thu Ha ◽  
Phan Dieu Huong

Underground power grid projects in Hanoi is so urgent that it requires immediate implementation. To synchronously and quickly implement the underground power grid projects, people in charge should not follow the outdated perspectives of just including the power industry, but also need to call for the support and cost sharing responsibility from consumers. This paper aims at approaching the subject both from the producers and consumers’ perspectives to together sharing the cost of putting the power grid underground not only in Hanoi but other metropolitans in Vietnam as well. Field studies (including 104 families) at Hoan Kiem District, Hanoi and CBA method were applied to investigate the willingness to pay (WTP) level of consumers to share the cost with the power industry for the underground power grid projects in Hanoi. The overview of the results shows that cost for the underground power grid in Hoan Kiem District ranging from 30,000 VND/household/month to 46,000VND/household/month. On the other hand, the willingness to pay of a typical household of four people within Hoan Kiem District ranges from 17,000VND/month to 24,000VND/month, with the most favorable method of annual payment within a detailed timeline.


Sign in / Sign up

Export Citation Format

Share Document