Automated Quantification of Pancreatic Steatosis in Biopsy Images using a Classification Based System

Author(s):  
A. Arjmand ◽  
M. Pappas ◽  
O. Tsakai ◽  
V. Christon ◽  
A. T. Tzallas ◽  
...  
2009 ◽  
Vol 5 (2) ◽  
pp. 10 ◽  
Author(s):  
Jose Luis Zamorano ◽  

3D echocardiography (3DE) will gain increasing acceptance as a routine clinical tool as the technology evolves due to advances in technology and computer processing power. Images obtained from 3DE provide more accurate assessment of complex cardiac anatomy and sophisticated functional mechanisms compared with conventional 2D echocardiography (2DE), and are comparable to those achieved with magnetic resonance imaging. Many of the limitations associated with the early iterations of 3DE prevented their widespread clinical application. However, recent significant improvements in transducer and post-processing software technologies have addressed many of these issues. Furthermore, the most recent advances in the ability to image the entire heart in realtime and fully automated quantification have poised 3DE to become more ubiquitous in clinical routine. Realtime 3DE (RT3DE) systems offer further improvements in the diagnostic and treatment planning capabilities of cardiac ultrasound. Innovations such as the ability to acquire non-stitched, realtime, full-volume 3D images of the heart in a single heart cycle promise to overcome some of the current limitations of current RT3DE systems, which acquire images over four to seven cardiac cycles, with the need for gating and the potential for stitch artefacts.


Author(s):  
Tochukwu Moses ◽  
David Heesom ◽  
David Oloke ◽  
Martin Crouch

The UK Construction Industry through its Government Construction Strategy has recently been mandated to implement Level 2 Building Information Modelling (BIM) on public sector projects. This move, along with other initiatives is key to driving a requirement for 25% cost reduction (establishing the most cost-effective means) on. Other key deliverables within the strategy include reduction in overall project time, early contractor involvement, improved sustainability and enhanced product quality. Collaboration and integrated project delivery is central to the level 2 implementation strategy yet the key protocols or standards relative to cost within BIM processes is not well defined. As offsite construction becomes more prolific within the UK construction sector, this construction approach coupled with BIM, particularly 5D automated quantification process, and early contractor involvement provides significant opportunities for the sector to meet government targets. Early contractor involvement is supported by both the industry and the successive Governments as a credible means to avoid and manage project risks, encourage innovation and value add, making cost and project time predictable, and improving outcomes. The contractor is seen as an expert in construction and could be counter intuitive to exclude such valuable expertise from the pre-construction phase especially with the BIM intent of äóÖbuild it twiceäó», once virtually and once physically. In particular when offsite construction is used, the contractoräó»s construction expertise should be leveraged for the virtual build in BIM-designed projects to ensure a fully streamlined process. Building in a layer of automated costing through 5D BIM will bring about a more robust method of quantification and can help to deliver the 25% reduction in overall cost of a project. Using a literature review and a case study, this paper will look into the benefits of Early Contractor Involvement (ECI) and the impact of 5D BIM on the offsite construction process.


Author(s):  
Hanna E. Röhnisch ◽  
Jan Eriksson ◽  
Lan V. Tran ◽  
Elisabeth Müllner ◽  
Corine Sandström ◽  
...  

2007 ◽  
Vol 38 (4) ◽  
pp. 304-312 ◽  
Author(s):  
Wolfram Schumacher ◽  
Edmund Frick ◽  
Mirko Kauselmann ◽  
Viola Maier-Hoyle ◽  
Reinier van der Vliet ◽  
...  

2015 ◽  
Vol 87 (15) ◽  
pp. 7865-7871 ◽  
Author(s):  
Yubin Kim ◽  
Su-Nam Jeong ◽  
Bolam Kim ◽  
Dong-Pyo Kim ◽  
Yoon-Kyoung Cho

Sign in / Sign up

Export Citation Format

Share Document