Construction and Initial Operation of a PACE Combined Cycle Power Plant
Keyword(s):
This paper describes the construction and initial operation fo a 260-MW combined cycle power generating plant consisting of two gas turbines, each with its own heat recovery steam generator. The steam, which is generated at 1200 lb 950 deg in each of the boilers, is combined to feed a single cylinder axial exhaust steam turbine. The paper describes the major components and operating cycle, the control system and some of the initial startup problems.