Geological Disposal for High-Level Waste: Ethical Considerations

Author(s):  
Gustaaf C. Cornelis

Abstract This paper describes the activities launched at SCK•CEN, intended to explore ethical and other non-technical aspects when dealing with the time scales considered in the high-level waste disposal program. (1) Especially the issues of retrievability and precaution will be focused on philosophically. Many questions will be raised in order to sensitize all stakeholders for the transdisciplinary character of the transgenerational problem at hand.

Author(s):  
Stan Gordelier ◽  
Pa´l Kova´cs

The world is facing energy difficulties for the future, in terms of security of supply and climate change issues. Nuclear power is virtually carbon free and it contributes to energy security, being a quasi-domestic source. Whilst it cannot provide a complete answer to these challenges, it is certainly capable of providing a significant component of the answer. However, nuclear power remains controversial. In order to gain public acceptance, it is widely recognised that a number of key issues need to be addressed, amongst which is resolution of the high-level radioactive waste (HLW) (including spent fuel) disposal issue. This is an important issue for all countries with an existing nuclear programme, whether or not it is intended that nuclear power should be phased out or expanded — the waste already exists and must be managed in any event. It is equally important for countries planning a new nuclear power programme where none has previously existed. Since nuclear power was first developed over fifty years ago, HLW arisings have been stored as an interim measure. It is widely believed by experts (though not by many opponents of the nuclear industry, nor by the public) that deep geological disposal, after a reasonable cooling time in interim storage, is technically feasible and constitutes a safe option [1] at an acceptable cost. The total volume of HLW from nuclear reactors is relatively small. A key issue, however, is the time-scale for developing such a final disposal solution. Considerations of security and inter-generational equity suggest that geological disposal should be implemented as soon as possible irrespective of whether or not new arisings are created. The question of managing HLW is not necessarily related to the issue of building new nuclear power stations. However, many opponents argue that there has been insufficient demonstration of the long-term safety of deep geological disposal. The same opponents also argue that there should be a moratorium on building new nuclear power plants (NPPs) until the issue of long-term management of HLW is resolved. These arguments have a powerful influence on public opinion towards both the construction of a waste repository and the building of new NPPs. The intent of this paper (developed from the current OECD NEA study on “Timing of High Level Waste Disposal”) is to identify and discuss some of the factors influencing the timing of the implementation of a HLW disposal strategy and to demonstrate to decision makers how these factors are affecting country strategies, based on current experience. Determining an optimum timescale of HLW disposal may be affected by a wide range of factors. The study examines how social acceptability, technical soundness, environmental responsibility and economic feasibility impact on the timing of HLW disposal and can be balanced in a national radioactive waste management strategy taking the social, political and economic environment into account. There is clear evidence that significant fractions of the public still have serious misconceptions with respect to the issues surrounding nuclear waste. The nuclear industry, together with governments in those countries who would like a component of nuclear power in their energy mix, has a responsibility for and a significant challenge in presenting its case to the public.


1985 ◽  
Vol 50 ◽  
Author(s):  
Max Helie ◽  
Georges Plante

In order to prevent a possible return of activity to the biosphere, the current concept for High Level Waste disposal is to build a multi barrier system consisting of a slow leaching waste form, the waste container, backfilling materials and the geological formation. The main threat to the integrity of the container is aqueous corrosion and two concepts are currently accepted, one based on a thin “corrosion resistant” overpack, the other on a thick “corrosion allowance” canister.


2012 ◽  
Vol 76 (8) ◽  
pp. 3373-3380 ◽  
Author(s):  
S. Vines ◽  
R. Beard

AbstractIn the UK, radioactive wastes currently planned for disposal in a geological disposal facility (GDF) are intermediate-level waste, some low-level waste and high-level waste. Disposal of other materials, including spent fuel, separated uranium and separated plutonium are also included in the planning of a GDF, if such materials are classified as wastes in the future. This paper gives an overview of the radionuclide behaviour research studies of the Nuclear Decommissioning Authority Radioactive Waste Management Directorate (NDA RWMD). The NDA RWMD's current understanding of the processes that control radionuclide behaviour in groundwater and how the engineered and natural barriers in a GDF would contain radionuclides is presented. Areas requiring further work are also identified.


1989 ◽  
Vol 16 (4) ◽  
pp. 444-458 ◽  
Author(s):  
J. C. Tait ◽  
P. J. Hayward ◽  
J. S. Devgun

Atomic Energy of Canada Limited is developing methods for the management and safe disposal of radioactive wastes. These wastes range from the highly radioactive (high-level) UO2 fuel arising from the nuclear generation of electrical power to the low- and intermediate-level wastes arising from research in various Canadian institutions using radioactive isotopes. This paper reviews the current research programs on materials and processes for the immobilization and containment of UO2 fuel wastes and the technical aspects of programs demonstrating the various technologies needed for implementing a disposal program for low-level wastes. Key words: waste management, radioactive, nuclear fuel waste, high-level waste, low-level waste, disposal, immobilization, glass, containment, siting, land burial, geological disposal.


1988 ◽  
Vol 127 ◽  
Author(s):  
Jan L. Marivoet ◽  
Geert Volckaert ◽  
Arnold A. Bonne

ABSTRACTPerformance assessment studies have been undertaken on the geological disposal of high-level waste in a clay layer in the framework of the CEC project PAGIS. The methodology applied consists of two consecutive steps : a scenario and a consequence analysis. The scenario analysis has indicated that scenarios of normal evolution, of human intrusion, of climatic change, of secondary glaciation effects and of faulting should be evaluated. For the consequence analysis as well deterministic “best estimate” as stochastic calculations, including uncertainty, risk and sensitivity analyses, have been elaborated.The calculations performed show that most radionuclides decay to negligible levels within the first fewjneters of the clay barrier. Just a few radionuclides, 99Tc, 135Cs and 237Np with its daughter nuclides 233U and 229Th can eventually reach the biosphere. The maximum dose rates arising from the geological disposal of HLW, as evaluated by the “best-estimate” approach are about 10−11 Sv/y for river pathways. If the sinking of a water well into the 150 m deep aquifer layer in the vicinity of the repository is considered together with a climatic change, the maximum calculated dose rate rises to a value of 3×10−7 Sv/y. The maximum dose rates evaluated by stochastic calculations are about one order of magnitude higher due to the considerable uncertainties in the model parameters. In the case of the Boom clay the estimated consequences of a fault scenario are of the same order of magnitude as the results obtained for the normal evolution scenario. The maximum risk is estimated from the results obtained through stochastic calculations to be about 5×10−8 per year. The sensitivity analysis has shown that the effective thickness of the clay layer, the retention factors of Tc, Cs and Np, and the Darcy velocity in the aquifer are parameters which strongly influence the calculated dose rates.


Author(s):  
C.W. CHRISTENSON ◽  
R.G. THOMAS ◽  
W.H. ADAMS ◽  
E.B. FOWLER ◽  
G.D. KELLY

2015 ◽  
Vol 79 (6) ◽  
pp. 1665-1673 ◽  
Author(s):  
Magnus Kronberg ◽  
Jan Gugala ◽  
Keijo Haapala

AbstractOver the last five decades private and national energy programmes worldwide have been producing a variety of radioactive wastes. One of the safest ways of disposing of this waste is to bury it deep underground in purpose-built geological disposal facilities. Currently, there is no operating geological repository in Europe for high-level waste but the goal of the IGD-TP is that the first repository shall be fully operational before the year 2025. Several studies and experiments are ongoing at various potential repository sites in Europe with the goal to establish general approaches that can be adapted for any country in need of a geological repository.The Swedish Nuclear Fuel and Waste Management Co (SKB) in Sweden and Posiva Oy in Finland are developing a method for geological disposal of high-level long-lived nuclear waste in crystalline rock, the KBS-3 method. KBS-3V (vertical) is both organizations reference design, but KBS-3H (horizontal) emplacement is also being researched as a potential alternative. Of high importance in the development is demonstrating the technical feasibilityin situof safe and reliable construction, manufacturing, disposal and sealing of such geological disposal facilities. Parts of these demonstrations are carried out under the framework of EurAtom/FP7 and one of these projects is the LUCOEX project where SKB is demonstrating horizontal emplacement, the Multi Purpose Test (MPT), and Posiva is demonstrating vertical buffer installation processes.The MPT includes the key components of the horizontal design and comprises all essential steps; manufacturing of the full-scale components, their assembly, installation in the drift and monitoring of the early buffer evolution. The MPT installation was successfully performed in late 2013. By combining the components, an initial verification of the design implementation has been achieved. At the same time, integrating the components has meant the recognition of some design weaknesses and the design will be updated accordingly.Posiva's KBS-3V buffer installation equipment that places buffer blocks with high precision in vertical deposition holes is currently being developed and will be tested during 2014 and 2015 in real underground conditions. The machine uses vacuum lifting tools for moving the buffer blocks and laser scanning technology to position both the machine and blocks. Functionality of the concept and equipment selected will be confirmed by the tests and the installation tests will provide important information about the suitability of the selected buffer dimensions and tolerances.