The Canadian Nuclear Safety Commission: Readiness Activities to Regulate Small Modular Reactors

Author(s):  
Kevin Lee

Over the course of the last several years the Canadian Nuclear Safety Commission (CNSC) has engaged with numerous vendors and potential licenses of small modular reactors (SMR) technology. This paper describes why Canada, and the CNSC, is of such interest to the international SMR community for prelicensing engagement and potential licensing of SMRs. It discusses what an SMR is and what potentially differentiates them from standard nuclear power plants (NPP). Readiness activities for the potential licensing of SMRs are described as well as modifications being made to the CNSC’s existing regulatory framework to facilitate the same, without reducing safety. The role of the CNSC’s discussion paper (DIS-16-04, Small Modular Reactors: Regulatory Strategy, Approaches and Challenges) and how feedback received on it helped confirm the CNSC’s modifications to be undertaken to the regulatory framework, as well as areas requiring further clarity, are highlighted. Finally, The CNSC Vendor Design Review (VDR) process is described as well as its part in ensuring a state of readiness to evaluate a licence application.

2020 ◽  
Vol 9 (1) ◽  
pp. 99-106
Author(s):  
Kevin W. Lee

Over the course of the last several years the Canadian Nuclear Safety Commission (CNSC) has engaged with numerous vendors and potential licenses of small modular reactor (SMR) technology. This paper discusses what an SMR is and what potentially makes them different from standard nuclear power plants (NPP). Readiness activities for the potential licensing of SMRs are described as well as modifications being made to the CNSC’s existing regulatory framework to facilitate the same, without reducing safety. The role of the CNSC’s discussion paper DIS-16-04, Small Modular Reactors: Regulatory Strategy, Approaches and Challenges (DIS 16-04) and how feedback received on it helped confirm the CNSC’s modifications to be undertaken to the regulatory framework, as well as areas requiring further clarity, are highlighted. Finally, the role of the CNSC Vendor Design Review process is described as well as other readiness activities undertaken by the CNSC that are helping to ensure that the CNSC will be ready to accept and evaluate a license application for an SMR.


Author(s):  
S. Herstead ◽  
M. de Vos ◽  
S. Cook

The success of any new build project is reliant upon all stakeholders — applicants, vendors, contractors and regulatory agencies — being ready to do their part. Over the past several years, the Canadian Nuclear Safety Commission (CNSC) has been working to ensure that it has the appropriate regulatory framework and internal processes in place for the timely and efficient licensing of all types of reactor, regardless of size. This effort has resulted in several new regulatory documents and internal processes including pre-project vendor design reviews. The CNSC’s general nuclear safety objective requires that nuclear facilities be designed and operated in a manner that will protect the health, safety and security of persons and the environment from unreasonable risk, and to implement Canada’s international commitments on the peaceful use of nuclear energy. To achieve this objective, the regulatory approach strikes a balance between pure performance-based regulation and prescriptive-based regulation. By utilizing this approach, CNSC seeks to ensure a regulatory environment exists that encourages innovation within the nuclear industry without compromising the high standards necessary for safety. The CNSC is applying a technology neutral approach as part of its continuing work to update its regulatory framework and achieve clarity of its requirements. A reactor power threshold of approximately 200 MW(th) has been chosen to distinguish between large and small reactors. It is recognized that some Small Modular Reactors (SMRs) will be larger than 200 MW(th), so a graded approach to achieving safety is still possible even though Nuclear Power Plant design and safety requirements will apply. Design requirements for large reactors are established through two main regulatory documents. These are RD-337 Design for New Nuclear Power Plants, and RD-310 Safety Analysis for Nuclear Power Plants. For reactors below 200 MW(th), the CNSC allows additional flexibility in the use of a graded approach to achieving safety in two new regulatory documents: RD-367 Design of Small Reactors and RD-308 Deterministic Safety Analysis for Small Reactors. The CNSC offers a pre-licensing vendor design review as an optional service for reactor facility designs. This review process is intended to provide early identification and resolution of potential regulatory or technical issues in the design process, particularly those that could result in significant changes to the design or analysis. The process aims to increase regulatory certainty and ultimately contribute to public safety. This paper outlines the CNSC’s expectations for applicant and vendor readiness and discusses the process for pre-licensing reviews which allows vendors and applicants to understand their readiness for licensing.


Author(s):  
Ronald C. Lippy

The nuclear industry is preparing for the licensing and construction of new nuclear power plants in the United States. Several new designs have been developed and approved, including the “traditional” reactor designs, the passive safe shutdown designs and the small modular reactors (SMRs). The American Society of Mechanical Engineers (ASME) provides specific Codes used to perform preservice inspection/testing and inservice inspection/testing for many of the components used in the new reactor designs. The U.S. Nuclear Regulatory Commission (NRC) reviews information provided by applicants related to inservice testing (IST) programs for Design Certifications and Combined Licenses (COLs) under Part 52, “Licenses, Certifications, and Approvals for Nuclear Power Plants,” in Title 10 of the Code of Federal Regulations (10 CFR Part 52) (Reference 1). The 2012 Edition of the ASME OM Code defines a post-2000 plant as a nuclear power plant that was issued (or will be issued) its construction permit, or combined license for construction and operation, by the applicable regulatory authority on or following January 1, 2000. The New Reactors OM Code (NROMC) Task Group (TG) of the ASME Code for Operation and Maintenance of Nuclear Power Plants (NROMC TG) is assigned the task of ensuring that the preservice testing (PST) and IST provisions in the ASME OM Code to address pumps, valves, and dynamic restraints (snubbers) in post-2000 nuclear power plants are adequate to provide reasonable assurance that the components will operate as needed when called upon. Currently, the NROMC TG is preparing proposed guidance for the treatment of active pumps, valves, and dynamic restraints with high safety significance in non-safety systems in passive post-2000 reactors including SMRs.


2021 ◽  
Author(s):  
Le Li ◽  
Zhihui Zhang ◽  
Chao Gao ◽  
Fei Zhou ◽  
Guangqiang Ma

Abstract With the development of digital instrument and control technology for nuclear power plants in recent decades, communication networks have become an important part of safety digital control systems, which takes charge in data exchange between the various sub-systems, and extremely impact on the reliability and safety of the entire I&C system. Traditional communication systems where some special features, such as reliability, safety, real-time, certainty, and independence are not strictly required are various illustrated. However, how to implement a communication system in a safety I&C system is rarely stated in current research. In this research, a reliable safety communication system applied in nuclear power plants is designed and analyzed. The five key characteristics of nuclear safety communication networks are explained, followed by explanation of how to achieve these characteristics. The analysis and verification of the designed system are also stated in this paper, which contributes to proving that the designed nuclear safety communication system could applied in the nuclear power plants.


1976 ◽  
Vol 102 (2) ◽  
pp. 229-232
Author(s):  
Joel L. Caves ◽  
Heber T. Newton

2012 ◽  
Vol 260-261 ◽  
pp. 103-106
Author(s):  
Yi Chun Lin ◽  
Yung Nane Yang

The ripples of the tsunami crisis in Japan triggered introspections of nuclear plant safety issues in the worldwide. Many countries have claimed the suspension of nuclear power plants. However, some countries such as Taiwan, under nearly 99% energy is exported, the disasters force government and citizen to face the importance of nuclear safety, especially the neighborhoods nearby the nuclear power plants. We have to face the nuclear safety since there is no other alternative energy presently. The 3rd nuclear power plant located in the south of Taiwan, which has the same geographic features with Fukushima, Japan. Presently, there is no precedent in Taiwan of precaution and rescue team and civil supervised mechanic on nuclear security issue. This paper will review according to transparent information, public participation and cross-organization cooperation to propose the execution and work division principles, including information monitor, educational propagation, hide and evacuation, emergence aid and care, rear and refuge service. The ultimate target is to establish self-governance inside nearby neighborhood to confront nuclear disaster at the critical moment.


Author(s):  
Zhilin Chen ◽  
Ping Huang ◽  
Chunhui Wang ◽  
Zhiyuan Chi ◽  
Fangjie Shi ◽  
...  

It’s the trend to extend the operating license time, called Operating License Extension (OLE) in China, of nuclear power plants (NPPs) in the future. It needs to be adequately demonstrated by licensees and approved by the regulator to gain an extended license time, such as 20 years. The demonstration methods for OLE are different among countries due to the different management systems for NPPs. Safety assessment, environment effect evaluation and update of the final safety analysis report (FSAR) will be the main aspects during OLE demonstration of NPPs in China according to the technical policy issued by National Nuclear Safety Administration (NNSA). Technical methods for scoping and screening, aging management review and time-limited aging analyses, which are the main contents of safety assessment are established based on the technical policy drafted by NNSA and international experiences in order to assist the operators to implement the safety assessment for OLE of NPP.


Sign in / Sign up

Export Citation Format

Share Document