scholarly journals Integrative Approach to the Plant Commissioning Process

2013 ◽  
Vol 2013 ◽  
pp. 1-12 ◽  
Author(s):  
Kris Lawry ◽  
Dirk John Pons

Commissioning is essential in plant-modification projects, yet tends to be ad hoc. The issue is not so much ignorance as lack of systematic approaches. This paper presents a structured model wherein commissioning is systematically integrated with risk management, project management, and production engineering. Three strategies for commissioning emerge, identified as direct, advanced, and parallel. Direct commissioning is the traditional approach of stopping the plant to insert the new unit. Advanced commissioning is the commissioning of the new unit prior to installation. Parallel commissioning is the commissioning of the new unit in its operating position, while the old unit is still operational. Results are reported for two plant case studies, showing that advanced and parallel commissioning can significantly reduce risk. The model presents a novel and more structured way of thinking about commissioning, allowing for a more critical examination of how to approach a particular project.

2011 ◽  
Vol 1 (3) ◽  
pp. 58-73 ◽  
Author(s):  
César Fuentes ◽  
Edmundo R. Lizarzaburu ◽  
Edgar Vivanco

The current work aims to develop a revision of the literature within the main concepts in the international rules and standards related to risk management in companies. By this way, there will be an analysis of issues such as the COSO - ERM model, an introduction to the ISO 27000 and 31000 standards; and the Project Management according to PMI targeted at risk management.


2012 ◽  
Vol 2 (2) ◽  
pp. 66
Author(s):  
Jenny Gibb ◽  
Linda Twiname

We introduce a risk management project teaching case where students work in consulting teams with a mentor from the information technology industry. The case describes in rich detail the issues and challenges confronting Linny, the owner and CEO of ACE Technologies, a New Zealand-based software-development firm, as she begins to implement an information technology data exchange trading link between a supplier firm in one country and a logistics company and large buyer firm in another country. Linny calls on Jade Consulting (student groups) to identify potential risks in the implementation process.  Taking this case design approach introduces students to two levels of project management education. First, we introduce strategies and techniques to develop e-learning and face-to-face communication skills in a team setting. Second, students manage the stages of a "real" industry project with a mentor. Our findings are relevant for management educators and practitioners involved in project management.


Author(s):  
Yenie Syukriyah ◽  
Falahah Suprapto

[Id]Manajemen resiko merupakan bidang penting pada manajemen proyek secara keseluruhan, dan manajemen proyek sistem informasi secara khusus. Melalui manajemen resiko yang baik, pimpinan dan stakeholder proyek berharap bahwa resiko terhadap kegagalan proyek dapat diminimalisir dengan usaha yang rasional. Manajemen resiko sendiri meliputi banyak kegiatan, salah satunya adalah analisis dan perencanaan mitigasi resiko. Aspek penting pada analisis dan perencanaan mitigasi resiko yaitu melakukan penilaian atau estimasi atas resiko untuk menentukan prioritas serta dampak setiap mitigasi yang diambil. Pada umumnya, hal yang paling mudah diterima stakeholder dalam menyajikan resiko adalah menghitung biaya akibat resiko tersebut. Untuk melakukan perhitungan biaya untuk memitigasi resiko, dapat digunakan salah satu pendekatan yaitu Expected Monetary Value (EVM). Melalui pendekatan EVM, dapat ditentukan pilihan tindakan mitigasi yang paling optimal, dengan estimasi biaya paling minimal[En] Risk management is an important area of overall project management, and information systems project management in particular. Through good risk management, project leaders and stakeholders expect that the risks to project failure can be minimized by rational efforts. Risk management itself includes many activities, one of which is risk mitigation analysis and planning. An important aspect of risk mitigation analysis and planning is to assess or estimate the risks to determine the priorities and impacts of each mitigation. In general, the easiest thing a stakeholder receives in presenting risk is to calculate the cost of the risk. To perform cost calculation to mitigate risk, one of the approaches is Expected Monetary Value (EVM). Through the EVM approach, the most optimal mitigation options can be determined, with the least cost estimate


2014 ◽  
Vol 687-691 ◽  
pp. 2837-2840
Author(s):  
Wen Zheng Dai

This article detailed introduces the system integration project management present situation, analyzes the system integration project initial stage, executing stage and completion stage of each phase of the project management content. And the problems existing in the process of system integration project management are analyzed. And these problems include project scope management. Project team management is not perfect and project risk management is not science, etc. Based on the relevant theory of the system integration project management at the same time, it analyzes the cause of system integration project management problems, and puts forward the corresponding improvement countermeasures. Finally based on the theory of project management nine knowledge areas, according to the basic process of project management: start, planning, executing, controlling and closing to discuss a specific system integration project. The concrete covers the scope of the project management, human resource management and risk management, and other areas of the project management body of knowledge.


2017 ◽  
Vol 7 (4-1) ◽  
pp. 163-173
Author(s):  
Wanjiru Gachie

This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual) record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects.


Author(s):  
Amolkirat Singh ◽  
Guneet Saini

Many people lose their life and/or are injured due to accidents or unexpected events taking place on road networks. Besides traffic jams, these accidents generate a tremendous waste of time and fuel. Undoubtedly, if the vehicles are provided with timely and dynamic information related to road traffic conditions, any unexpected events or accidents, the safety and efficiency of the transportation system with respect to time, distance, fuel consumption and environmentally destructive emissions can be improved. In the field of computer and information science, Vehicular Ad hoc Network (VANET) have recently emerged as an effective tool for improving road safety through propagation of warning messages among the vehicles in the network about potential obstacles on the road ahead. VANET is a research area which is in more demand among the researchers, the automobile industries and scientists to discover about the loopholes and advantages of the vehicular networks so that efficient routing algorithms can be developed which can provide reliable and secure communication among the mobile nodes.In this paper, we propose a Groundwork Based Ad hoc On Demand Distance Vector Routing Protocol (GAODV) focus on how the Road Side Units (RSU’s) utilized in the architecture plays an important role for making the communication reliable. In the interval of finding the suitable path from source to destination the packet loss may occur and the delay also is counted if the required packet does not reach the specified destination on time. So to overcome delay, packet loss and to increase throughput GAODV approach is followed. The performance parameters in the GAODV comes out to be much better than computed in the traditional approach.


2016 ◽  
Vol 5 (1) ◽  
Author(s):  
Karuna Devi Mishra ◽  
Dr. Sudarsanam

This paper investigates the current challenges faced by the project managers in creating realistic expectations of customers in dynamic changing project environment which are created by rapid introduction of new unknowns, as they progress. One might say they are more akin to packing boxes of frogs without a cover, setting each thing right before a new challenge is faced. The difficulties posed by these projects are identified and the literature is reviewed for suitable approaches. Why do projects fail and what more is critical to the success of project? All projects are conceived with a vision to satisfy certain needs of the business. Hence, the beneficiary of these needs become key stakeholder. Appropriate participation of this key stakeholder in steering the project ensures the success of the project. Also businesses are impacted by competition and changing market place resulting in skewed expectation management. Managing expectations enhances the success of the project immensely. Now, goal of the project plays a pivotal role and hence respecting it, is an important task, in project management. Project governance is an important aspect which needs to change according to the requirements and requires a dynamic approach rather than a ‘rule book approach’.