Nuclear power debate and public opinion in Belarus: From Chernobyl to Ostrovets

2016 ◽  
Vol 26 (3) ◽  
pp. 275-288 ◽  
Author(s):  
Aliaksandr Novikau

The Belarusian government’s decision of the last decade to build a nuclear power plant near the city of Ostrovets, in northern Belarus, has proven to be controversial, resulting in a great deal of debate about nuclear energy in the country. The debate was inevitably shaped by the traumatic event that affected Belarus – the Chernobyl nuclear accident of 1986. The Belarusian authorities have consistently promoted a positive view of nuclear energy to the population in order to overcome the so-called ‘Chernobyl syndrome’ and deliberately shaped nuclear risk communication. As a result, the issue of trust remains crucial in all nuclear debates in Belarus.

Author(s):  
V. A. Lazarenko

The article presents the analysis of the influence of historical factors on the development of Russian cities of nuclear power industry and the genetic types of these cities. Most of these cities are young, their socioeconomic state depends on the city-forming enterprise. The formation and development of nuclear power plant (NPPs) cities went in two ways: the city was built in parallel with the nuclear power plant (e.g., Novovoronezh, Desnogorsk, Kurchatov); the NPP was built near the settlement, and then NPP has influenced on socioeconomic development of the settlement, its employment structure, etc. (Volgodonsk and Balakovo). In USSR/Russia practice, the first way dominated, when an urban-type settlement was built near a NPP, such settlement then intensively grew and developed into a city. There are three types of Russian cities with NPPs: the cities formed and developed before the construction of the NPP; the cities developed due to the operation of NPPs, and the cities created and developed due to the operation of NPPs. It was found that the factor of formation of nuclear power industry in the city is decisive in the social development of almost all cities of NPPs and affects their current state.


2018 ◽  
Vol 68 (3) ◽  
pp. 167-182 ◽  
Author(s):  
Saha Sabhasachi ◽  
Roy Koushik ◽  
Roy Souvik ◽  
Rahman Md. Asfakur ◽  
Hasan Md. Zahid

AbstractIn the present world, nuclear energy is a must need for various purposes. The main cause of nuclear energy is because of the increasing energy demand, which is not possible to provide by using convenient energy generation. Bangladesh is a lower income country and the energy sector is not so developed here though there is a very high demand for energy. Rooppur Nuclear Power Plant is the only one nuclear generation plant which can provide this kind of huge energy within a very short time. This paper mainly depicts the ins and outs of this plant and discusses it’s feasibility in Bangladesh. It also focuses on the worlds various power generation methods and comprises it with nuclear energy generation. A detailed technical brief is presented in this paper along with advantages, location selection, financial and environmental impacts. This will help researchers to do further researches about nuclear energy in Bangladesh.


Author(s):  
Jean-Jacques Grenouillet

Nowadays, decommissioning of nuclear power plants has become a key issue for nuclear industry in Europe. The phasing out of nuclear energy in Germany, Belgium and Sweden, as well as the early closure of nuclear units in applicant countries in the frame of EU enlargement, has largely contributed to consider decommissioning as the next challenge to face. The situation is slightly different in France where nuclear energy is still considered as a safe, cost-effective and environment friendly energy source. Electricite´ de France (EDF) is working on the development of a new generation of reactor to replace the existing one and erection of a new nuclear power plant could start in the next few years. Nevertheless, to achieve this objective, it will be necessary to get the support of political decision-makers and the acceptance of public opinion. Due to the growing concern of these stakeholders for environmental issues, their support can only be obtained if it is possible to demonstrate that nuclear energy industry will not leave behind unsolved issues that will be a burden to the next generations. In this context decommissioning of the first generation of EDF NPPs constitutes a prerequisite for the erection of a new type of nuclear power plant. This paper will present the programme defined by EDF for the decommissioning of its nine already shutdown reactors (Fig. 1). The reasons of the recent evolution of EDF decommissioning strategy will be explained and the key issues that will contribute to the successful implementation of this programme will be addressed. Finally, what has been achieved on sites so far and major planned activities will be described.


Author(s):  
Anthony Hechanova

The United Arab Emirates (UAE) is a developing affluent nation. The leaders of the UAE announced the pursuit of peaceful nuclear power in 2008 and by the end of the following year established its Nuclear Energy Program Implementing Organization (the Emirates Nuclear Energy Corporation (ENEC)), Federal Authority for Nuclear Regulation (FANR), and ordered four APR-1400 pressurized water reactors from the Korean Electric Power Company (KEPCO). Nuclear Engineering programs were initiated soon afterwards at Khalifa University for graduate students and the University of Sharjah for undergraduate students. The technical workforce including nuclear power plant local operators and chemistry and radiation protection personnel was established by ENEC and the Institute of Applied Technology as an inaugural program of Abu Dhabi Polytechnic (AD Poly) in 2011. This paper describes the development of the dual education and training program at AD Poly, the experience of the initial cohorts who conducted their training at the APR-1400 units at the Shin Kori Nuclear Power Plant in Korea, and the current program between the AD Poly Abu Dhabi campus and the new Barakah Nuclear Power Plant based on lessons learned from the earlier years.


2018 ◽  
Vol 212 ◽  
pp. 02010
Author(s):  
Vahe Davtyan

The prerequisites for the development of Armenia’s nuclear power industry are indicated. The main geopolitical problems of operation of the Armenian NPP are revealed through studying the electric power market of the South Caucasus with the definition of the export opportunities of Armenia. The main problems of nuclear fuel supplies to the Armenian NPP are studied. Recommendations are given on the long-term development of nuclear energy in Armenia.


Author(s):  
Shigenao Maruyama

Ten years have passed since the Great East Japan Earthquake and the subsequent accident at the Fukushima Daiichi nuclear power plant (NPP) that occurred on March 11, 2011. The earthquake and tsunami caused significant loss of lives and widespread disaster in Japan. Several reports have been published on the nuclear accident; however, the original data released at the beginning of the accident were written in Japanese, and some of these documents are no longer accessible. Some of the scenarios pertaining to the accident have become standardized theories, and these scenarios may be passed down to future generations with different descriptions, which may not fully describe the actual occurrences. To prevent future nuclear accidents, the accident at Fukushima Daiichi must be properly understood and analyzed.


2021 ◽  
Vol 30 (2) ◽  
pp. 305
Author(s):  
Dóra Lovas

<p>The aim of the article is to present the ruling of the Court of Justice of the European Union (CJEU) in the case of the Hinkley Point C nuclear power plant. This investment can also be related to the Paks II nuclear power plant investment, therefore the two investments are compared too. Both projects were examined by the European Commission, which take an important part when the national aid was awarded to Hinkley Point C and Paks II projects, and the decision of the CJEU also had influence on it. The author considers the European Commission’s aid conception positive, because the less developed countries are not forced to use only the renewables, but the environmental and security aspects of nuclear energy are also allowed (e.g. Hinkley Point C and Paks II nuclear power plants). The subsidy was allowed in both cases, but the reasons are different. In these cases, the limits of the EU energy politics can be seen, i.e. the right to select the package and the priority of the energy security and sustainable development. To mention an example for the difference, in Great Britain the energy sector was divided among the participants on the market but in Hungary the nuclear energy remained under state control. In the first option the state wanted to prove that it grants offset for the help to the general market services and in the second option the market investor principle was highlighted in order to show no other market participant act in other way. These points were not accepted, the state aid was provided both cases with permissible reasons because the projects condescend the goals of environmental policy and energy security. The decisions show that as a result of the efforts to protect the environment the dependency on energy increased and it cannot be solved only be encouraging the usage of the renewables. The permissive attitude of the European Commission can be found here and it is influenced by the increased state regulative roles. According to the author, it also appears in the environmentally friendly decisions which refers to the Paris Agreement’s fulfilment and the involvement of environmental requirements into politics. Moreover, the European Union tries to maintain its leader role in economics, which can be reached by the decrease of energy dependency and the exclusive usage of renewable energies is not the appropriate solution. The CJEU judgement is relevant in several respects. The article focuses primarily on the issue of environmental protection, state aid and the relation between the Euratom Treaty and the Treaty on the Functioning of the European Union.</p>


Sign in / Sign up

Export Citation Format

Share Document