Research and Analysis of the Stress State of the Load-Bearing Elements in the Preparatory Mine Working “Massive – Frame – Combined Roof-Bolting System”

Author(s):  
V. Bondarenko ◽  
I. Kovalevska ◽  
H. Symanovych ◽  
M. Barabash ◽  
V. Chervatiuk ◽  
...  
2021 ◽  
Vol 280 ◽  
pp. 01006
Author(s):  
Oleksandr Krukovskyi ◽  
Viktoriia Krukovska ◽  
Yurii Vynohradov ◽  
Vladimir Dyomin

In this work, the problem of water inflow reduction in Ukrainian coal mines, which are distinguished by difficult hydrogeological conditions, was considered. A numerical study of the change in water inflow into a mine working when it crosses a tectonic fault was carried out. The cases when the permanent working was supported by frame supports and roof bolts were considered. The calculation of stress fields, zones with inelastic deformations and coefficients of permeability, which depend on the stress state and takes into account tectonic and natural permeability of the rocks, was performed. The results of calculating the water pressure and water inflow into the mine working in all considered cases are presented in the article. Analysis of the calculated data showed that a disturbed area, which covered water-bearing ricks, was formed in the roof of the mine working with the frame support. Within this area, water can move towards the contour of the mine working. The filtration permeability of the host rocks increases significantly when the mine face approaches the tectonic disturbance. The flow rate of water reaches critical values. The use of roof bolting restrains the unloading of the boundary rocks from the rock pressure and keeps them in a triaxially compressed stress state. The permeability value decreases by the value of its technological component. In different areas of the intersection of tectonic disturbance, the water inflow into the mine working with roof bolting is 3-8 times less than in the working, supported by frame supports. Therefore, the use of roof bolting allows not only to keep the mine working in a stable state, but also to significantly reduce water inflows at complicated hydrogeological conditions.


2019 ◽  
Vol 123 ◽  
pp. 01006 ◽  
Author(s):  
Iryna Kovalevska ◽  
Zenon Pilecki ◽  
Oleksandr Husiev ◽  
Vasyl Snihur

The degree of influence has been determined of diversified deformation-strength characteristics of load-bearing elements in the fastening system of the preparatory mine workings, while maintaining them in a laminal massif of soft rocks. The analysis has been performed of multivariate computational experiments of the stress-strain state of the load-bearing elements of the fastening system in the preparatory mine workings from the position of the mutual influence of their deformation-strength characteristics and the support loading as a whole. An analysis is represented of the mutual influence of the operation modes of the mine working support elements between themselves and the fastening system as a whole; it has been studied the stress-strain state of the mine working fastening system with a central hydraulic prop stay, as well as a significant increase in reliability of the support performance has been analysed and determined. The tendency has been substantiated of minimizing the load on the mine working fastening system – increasing the coherence of the diversified operation modes of fastening elements by enhancing preferentially the yielding property of the rigid element. The application has been substantiated of the central yielding prop stays of the strengthening support of a frame in case of intensive rock pressure manifestation in the zone of the stope works active influence.


1979 ◽  
Vol 15 (3) ◽  
pp. 185-191
Author(s):  
L. P. Khoroshun ◽  
R. M. Israfilov

Ugol ◽  
2018 ◽  
pp. 21-25
Author(s):  
A.A. Dudin ◽  
◽  
E.V. Vakhrushev ◽  
S.Е. Zlobin ◽  
A.S. Prokofiev ◽  
...  
Keyword(s):  

Ugol ◽  
2019 ◽  
pp. 72-77
Author(s):  
V.F. Demin ◽  
◽  
V.S. Portnov ◽  
T.V. Demina ◽  
A.Ye. Zhumabekova ◽  
...  

2019 ◽  
Vol 109 ◽  
pp. 00042 ◽  
Author(s):  
Oleksandr Krukovskyi ◽  
Yurii Bulich ◽  
Yuliia Zemlianaia

The modification of the technology roof bolt supporting of mine workings in the conditions of increasing the coal mining intensity has been made. The technological schemes have been developed for the phased construction of roof bolting and frame support. This schemes make it possible to temporarily postpone the setting of frames in the mine working face, reduce the time and labour intensity for covering with a grid of the mine working arch and setting the bolts, as well as to increase the safety. The analysis of changes in the stress state of the border massif during the phased construction of roof bolting and frame support has been made. It is shown that the technology of phased construction of roof bolting and frame support ensures the maintaining a stable state of host rocks. In addition, the time between the extraction of the coal-rock mass and the setting of the primary support, as well as the distance between the face and the first row of roof bolts has been reduced to a minimum. The suggested approach makes possible to ensure the rate of preparatory mine workings development that are necessary for the intensification coal mining.


2015 ◽  
Vol 2015 (3) ◽  
pp. 52-56
Author(s):  
Владимир Лозбинев ◽  
Vladimir Lozbinev

The factors that determine the performance monocoque cars. New approaches to the evaluation of the stress state of car bodies, the stability of load-bearing elements. The importance of assessing the survivability of bearing elements.


Sign in / Sign up

Export Citation Format

Share Document