SUBSTANTIATION OF THE POSSIBILITY OF USING MINE WORKING ROOF BOLTING IN CONDITIONS OF WATERED AND WEAKENED ROCKS

Ugol ◽  
2018 ◽  
pp. 21-25
Author(s):  
A.A. Dudin ◽  
◽  
E.V. Vakhrushev ◽  
S.Е. Zlobin ◽  
A.S. Prokofiev ◽  
...  
Keyword(s):  
Ugol ◽  
2019 ◽  
pp. 72-77
Author(s):  
V.F. Demin ◽  
◽  
V.S. Portnov ◽  
T.V. Demina ◽  
A.Ye. Zhumabekova ◽  
...  

2019 ◽  
Vol 109 ◽  
pp. 00042 ◽  
Author(s):  
Oleksandr Krukovskyi ◽  
Yurii Bulich ◽  
Yuliia Zemlianaia

The modification of the technology roof bolt supporting of mine workings in the conditions of increasing the coal mining intensity has been made. The technological schemes have been developed for the phased construction of roof bolting and frame support. This schemes make it possible to temporarily postpone the setting of frames in the mine working face, reduce the time and labour intensity for covering with a grid of the mine working arch and setting the bolts, as well as to increase the safety. The analysis of changes in the stress state of the border massif during the phased construction of roof bolting and frame support has been made. It is shown that the technology of phased construction of roof bolting and frame support ensures the maintaining a stable state of host rocks. In addition, the time between the extraction of the coal-rock mass and the setting of the primary support, as well as the distance between the face and the first row of roof bolts has been reduced to a minimum. The suggested approach makes possible to ensure the rate of preparatory mine workings development that are necessary for the intensification coal mining.


2021 ◽  
Vol 280 ◽  
pp. 01006
Author(s):  
Oleksandr Krukovskyi ◽  
Viktoriia Krukovska ◽  
Yurii Vynohradov ◽  
Vladimir Dyomin

In this work, the problem of water inflow reduction in Ukrainian coal mines, which are distinguished by difficult hydrogeological conditions, was considered. A numerical study of the change in water inflow into a mine working when it crosses a tectonic fault was carried out. The cases when the permanent working was supported by frame supports and roof bolts were considered. The calculation of stress fields, zones with inelastic deformations and coefficients of permeability, which depend on the stress state and takes into account tectonic and natural permeability of the rocks, was performed. The results of calculating the water pressure and water inflow into the mine working in all considered cases are presented in the article. Analysis of the calculated data showed that a disturbed area, which covered water-bearing ricks, was formed in the roof of the mine working with the frame support. Within this area, water can move towards the contour of the mine working. The filtration permeability of the host rocks increases significantly when the mine face approaches the tectonic disturbance. The flow rate of water reaches critical values. The use of roof bolting restrains the unloading of the boundary rocks from the rock pressure and keeps them in a triaxially compressed stress state. The permeability value decreases by the value of its technological component. In different areas of the intersection of tectonic disturbance, the water inflow into the mine working with roof bolting is 3-8 times less than in the working, supported by frame supports. Therefore, the use of roof bolting allows not only to keep the mine working in a stable state, but also to significantly reduce water inflows at complicated hydrogeological conditions.


2019 ◽  
Vol 109 ◽  
pp. 00041 ◽  
Author(s):  
Viktoriia Krukovska ◽  
Yurii Vynohradov

The water stability influence of host rocks on water filtration process from the undermined aquifer to the mine working, depending on the way of its fastening has been studied in the paper. When solving the problem of water filtration in a deformable massif, the finite element method was used. The results of calculations are presented of the filtration permeability of the coal-bearing massif, the water pressure and the value of the water inflow into mine working in the cases of mining operations in sandstone and argillite. It is shown that the use of roof-bolting support prevents the development of the fractures formation process in the mine working roof, preserving the rocks in a natural, monolithic state. As a result, the process of water filtration from water bearing rock layers is constrained, which prevents or significantly reduces the soaking of border roof rocks. The use of roof-bolting fastening several times reduces the water inflow into mine working, located even in water-permeable rocks. The application of the roof-bolting support as a technological method for reducing the water inflow into mine workings has been substantiated.


2021 ◽  
Vol 330 ◽  
pp. 01009
Author(s):  
Anastasiya Nikitina ◽  
Dmitriy Borzykh ◽  
Sergey Rib ◽  
Aleksandra Lesnykh ◽  
Tonglin Zhao

In the process of numerical studies, the stress-strain state of the rock massif around the mine working driven at a depth of 600 m was determined. The article presents the analysis of the distribution of total vertical and horizontal stresses isolines in the working roof, as well as the ratio of the residual strength of rocks to the initial. The influence of the roof bolting on the displacement of working contour was established. Dangerous zones in the near-contour rocks of preparatory working were identified. The maximum exposure area of unsecured part of the roof during driving the workings in seam 3-3a was established.


2019 ◽  
pp. 132-141
Author(s):  
V.G. Hrinov ◽  
◽  
A.A. Khorolskyi ◽  
Yu.O. Vynohradov ◽  
◽  
...  