Energies ◽  
2021 ◽  
Vol 14 (17) ◽  
pp. 5522
Author(s):  
Krzysztof Lalik ◽  
Ireneusz Dominik ◽  
Paweł Gut ◽  
Krzysztof Skrzypkowski ◽  
Waldemar Korzeniowski ◽  
...  

This article presents the application of a self-excited acoustic SAS system for non-destructive testing (NDT) for roof-bolt housings in laboratory and real mine conditions. The proposed system with a filtering mechanism was applied to the J64-27 composite anchors. The conducted tests allowed successful confirmation of the usefulness of the system in the detection of rod defects, damage of the mechanism coupling the anchor to the rock mass and testing of the stress state of the anchor itself. The proposed filtering system allowed eliminating the effect of jump change of frequency in the limit cycle of self-excited system. The proposed method is a novel solution for safety diagnostics of bolt housings in mining applications.


2019 ◽  
Vol 37 (2) ◽  
pp. 593-604 ◽  
Author(s):  
Gopi Bylapudi ◽  
A. J. S. (Sam) Spearing ◽  
Kanchan Mondal ◽  
Anand Bhagwat

2019 ◽  
Vol 41 (2) ◽  
pp. 93-101 ◽  
Author(s):  
Krzysztof Skrzypkowski ◽  
Waldemar Korzeniowski ◽  
Krzysztof Zagórski ◽  
Ireneusz Dominik ◽  
Krzysztof Lalik

Abstract This paper discusses the pull-out laboratory tests and the monitoring of expansion-shell bolts with a length of 1.82 m. The bolts comprised the KE-3W expansion shell, a rod with a diameter of 0.0183 m and a profiled, circular plate with a diameter of 0.14 m, and a gauge of 0.006 m. The bolts were installed in a concrete block with a compressive strength of 75 MPa. The tests were conducted on a state-of-the-art test stand owned by the Department of Underground Mining of the AGH University of Science and Technology. The test stand can be used to test roof bolts on a geometric scale of 1:1 under static and rapidly varying loads. Also, the stand is suitable for testing rods measuring 5.5 m in length. The stand has a special feature of providing the ongoing monitoring of bolt load, displacement and deformation. The primary aim of the study was to compare the results recorded by two different measurement systems with the innovative Self-Excited Acoustic System (SAS) for measuring stress variations in roof bolts. In order to use the SAS, a special handle equipped with an accelerometer and exciter mounted to the nut or the upset end of the rod was designed at the Faculties of Mining and Geoengineering and Mechanical Engineering and Robotics of the AGH University of Science and Technology. The SAS can be used for nondestructive evaluation of performance of bolts around mining workings and in tunnels. Through laboratory calibration tests, roof bolt loads can be assessed using the in-situ non-destructive method.


2019 ◽  
Vol 128 (4) ◽  
pp. 206-215 ◽  
Author(s):  
Gopi Bylapudi ◽  
A. J. S. (Sam) Spearing ◽  
Kanchan Mondal ◽  
Anand Bhagwat

2019 ◽  
Vol 109 ◽  
pp. 00042 ◽  
Author(s):  
Oleksandr Krukovskyi ◽  
Yurii Bulich ◽  
Yuliia Zemlianaia

The modification of the technology roof bolt supporting of mine workings in the conditions of increasing the coal mining intensity has been made. The technological schemes have been developed for the phased construction of roof bolting and frame support. This schemes make it possible to temporarily postpone the setting of frames in the mine working face, reduce the time and labour intensity for covering with a grid of the mine working arch and setting the bolts, as well as to increase the safety. The analysis of changes in the stress state of the border massif during the phased construction of roof bolting and frame support has been made. It is shown that the technology of phased construction of roof bolting and frame support ensures the maintaining a stable state of host rocks. In addition, the time between the extraction of the coal-rock mass and the setting of the primary support, as well as the distance between the face and the first row of roof bolts has been reduced to a minimum. The suggested approach makes possible to ensure the rate of preparatory mine workings development that are necessary for the intensification coal mining.