The development of a mobile waste incineration plant designed for the recovery of garbage dumps located near towns and villages, from where the removal of garbage to the city to the incineration plant is not profitable due to the large remoteness of small settlements from the city. The installation has two combustion zones: in the 1st zone, the combustion process of solid municipal waste (MSW) is achieved at temperatures up to 600 °C, and in the second zone – up to 1200 °C. Afterburning of flue gas to reduce the formation of dioxins, furans and soot is provided.