Implementation of Critical Path Method (CPM) Technique to a Road Construction Project in Jalgaon District, Maharashtra

Author(s):  
Kushagra Raghav
2021 ◽  
Vol 9 (1) ◽  
pp. 17-24
Author(s):  
Mia Syafrina ◽  
Fandy Bestario Harlan

Construction projects are generally the most high-risk businesses, especially shipbuilding projects. Efforts to reduce the risk can be done by minimizing the potential risk. This study aims to see potential high risk and prevent delays in the completion of ship construction using the Critical Path Method CPM at PT. XYZ. By using the Critical Path Method CPM critical paths can be given more attention so that they will not interfere ship construction projects. In addition, it is also a form of anticipation if there is a delay, it is possible to reschedule.


2020 ◽  
Vol 12 (21) ◽  
pp. 8918
Author(s):  
Kyunghwan Kim

Delays by limited supply of resources are common in many construction projects and may cause serious monetary disputes between project participants. Since the dispute resolution may require unnecessary additional time and cost, preventing delays in advance is an important goal in sustainable construction project management. To prevent delays, a feasible plan must be implemented, which reflects limited resources and provides reliable activity information. For this purpose, this study proposes a generalized resource-constrained critical path method (eRCPM). It consists of three steps to identify resource-dependent activity relationships (resource links) based on the result of resource-constrained scheduling (RCS) under multiple resource constraints. Compared to the existing resource-constrained critical path methods, the eRCPM has the advantage of identifying resource links irrespective of the applied RCS technique because it is based on the result rather than the RCS process. Further, this study presents a Microsoft (MS) Excel-based half-automated prototype system that is linked using file export and import functions to both P6 and MS Project software packages. The detailed process of the eRCPM algorithm and the operation process of the prototype system are described using an example schedule. Through a case study, it was demonstrated that eRCPM appropriately identifies the necessary resource links and provides reliable total floats.


1998 ◽  
Vol 25 (3) ◽  
pp. 424-436 ◽  
Author(s):  
Paul Wing Ming Tam ◽  
Pujitha Bandara Gamagedera Dissanayake

Construction projects are commonly scheduled by the critical path method or its similar methods, with the assumption that resources are unlimited. The ranked positional weight method, which may be used for project scheduling and resource allocation for both constrained and unconstrained resource scheduling, is found to be relatively easy in application. In construction, the availability of resources is sometimes limited and this leads to an extension of project duration. The critical path method and similar approaches cannot provide an answer in this scenario. A bridge construction project is used to illustrate how the method can be applied.Key words: scheduling, resource allocation, ranked positional weight method.


2019 ◽  
Vol 9 (1) ◽  
pp. 14-17 ◽  
Author(s):  
Magdalena Kowacka ◽  
Dariusz Skorupka ◽  
Artur Duchaczek ◽  
Paweł Zagrodnik

AbstractThe work contains information on the implementation of surveying works in the road construction process. The aim of the research was to identify geodetic risk factors occurring at the stage of preparation of a construction project, the presence of which can greatly disrupt the undertaking such as the road construction. The research was carried out on the basis of expert knowledge, documentation obtained from various road construction projects and the analysis of disturbances at the initial stage of works.


Sign in / Sign up

Export Citation Format

Share Document